eBuild Approved Plan Set Download

23-04441-01 - Amateur Radio Antenna Tower - 2750 UNIVERSITY ST

Approved Files

The files listed below are the approved plan set for this project as of the date of the last approval notice: July 6, 2023.

Using the Download Selected option will download the documents in zip files if multiple documents are selected. If more than 100 documents are selected, you'll receive multiple zip files. Please verify you have downloaded all documents you selected. Archive sets are provided in ZIP file format to make downloading large groups of files more convenient. One or more archive files is created for the plans approved at each decision.

Selected Document Date Approved Approval Type
01_DescriptionOfAnAmateurRadioAntennaTowerAt2750UniversitySt.pdf 07/06/2023 Initial
02 _SketchAntennaTower.pdf 07/06/2023 Initial
03 _PlanAntennaTowerCADdrawing.pdf 07/06/2023 Initial
04_SectionsAntennaTowerCADdrawing.pdf 07/06/2023 Initial
05_TowerPartROHN-25GTiltingBaseplate.pdf 07/06/2023 Initial
06_TowerPartROHNBearingPlateBPL25G.pdf 07/06/2023 Initial
07_TowerPartDXEngineeringtowerShelfForRotatorDXE-AS25G.pdf 07/06/2023 Initial
08_TowerPartTypicalRotatorMountingDiagram.pdf 07/06/2023 Initial
09_TowerPartTypicalHexBeamAntenna.pdf 07/06/2023 Initial
10_TowerPartROHN-25GTowerSection.pdf 07/06/2023 Initial
11_TowerSpecROHN-25GBracketedTowerMaximumHeight.pdf 07/06/2023 Initial
12_CalculationAntennaRotatorCapacity.pdf 07/06/2023 Initial

0 files selected

Archive Sets

Archive Date Approved Type
ApprovedPlanFiles-23-04441-01-Initial-2023-07-12T12-00-31.zip 07/12/2023 Initial

Project Attachments

Attachments are provided for informational purposes.

Attachment Date Type Description
Fences and Accessory Structures.pdf 06/29/2023 Architectural Fences and Accessory Structures
2021 No Permit Required.pdf 06/29/2023 Structural No Permit Required
Single Family and Duplex Construction Most Commonly Missed Items.pdf 06/29/2023 Structural Single Family and Duplex Construction Most Commonly Missed Items

Project Requirements

PDF Copy Requirements do not need to be addressed before permits are issued. However, the inspectors will check that all requirements have been met before approving the final inspection.

ID Type Document Comment
R-A1 Architectural 03 _PlanAntennaTowerCADdrawing.pdf Our review is limited to the scope of work proposed in the permit application. Approval of these plans shall not be construed to be an approval of development outside of the scope of review. It is the property owner’s responsibility to determine and accurately depict the location of lot lines.
R-E1 Electrical 04_SectionsAntennaTowerCADdrawing.pdf These Electrical plans are NOT reviewed prior to permit issuance. Electrical work shall comply with the current codes and will be field inspected for compliance.

Required Deferred Submittals

Per OSSC 107.3.4.2, deferred submittals are defined as those portions of the design that are not submitted at the time of the application and that are to be submitted to the building official within a specified period.

There are no required deferred submittals for this project.

Error!