| | | | | | | | | | | | | | | | | | | | | | Building and Permit Services |
| | | | Permit Number: 25-07077-01 |
| | | | | | | | | | | | | | | | | | | | | | | Address: 2870 W 10TH PL | Project Description: CHANGE OF USE FROM DMV BUILDING TO OFFICES AND MANUFACTURING OF PREFABRICATED DWELLINGS | Application Type: | Commercial | Status: | Issued | Scope of Work: | Tenant Infill | Zoning: | Heavy Industrial District | Map: | 17-04-35-13 | Tax Lot: | 01601 | Subdivision: | | Addition: | | Lot: | | Block: | | Date Received: | 10/10/25 | # Bedrooms: | 0 | Commitment Date: | 10/15/25 | # Dwelling Units: | 0 | Ready to issue as of: | 12/04/25 | In Flood Plain: | | Project Coordinator: | Catherine R Allen | Phone: | 541-682-6381 | | | | Sign Standards: | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Construction Type Comments: |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Floor | Existing Floor Area | New Floor Area | Total Area |
| | | | | Existing floor area may not be shown. |
| | | |
| | |
| | | | | | | | | | | | | | | | | | | | | Type | Contractor | Building | ESSEX GENERAL CONSTRUCTION | Electric | PNW ELECTRIC LLC | Plumbing | HCH MECHANICAL | Primary Contact | MOORE JOSEPH E (JOE) |
| | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Plan review data displayed is the most current for each review. The applicant will receive notification of all issues needing additional information after all reviews on a project have been completed. Supplemental Information (SI) can be submitted prior to or after permit issuance. If you have any questions regarding your project, contact CRAllen at 541-682-6381 or send email to Catherine.R.Allen@ci.eugene.or.us. Also note that some reviews (i.e., fire alarms, fire sprinklers) are deferred submittals and will be reviewed after original permit(s) have been issued. |
| | | | | | | | | | | | | | | | | Review has not been started |
| | | | | | | | | | | | | | | | | Review for individual review has been completed, waiting for a response |
| | | | | | | All reviews for project have been completed, waiting for a response |
| | | | | | | | | | | | | | | | | | | | | | Information only, review not approved |
| | | | | | | | | | | Project cannot be approved as submitted |
| | | | For information regarding the review of your project or the commitment date for completion of review, please contact your project coordinator, CRAllen, at Catherine.R.Allen@ci.eugene.or.us or by phone at 541-682-6381. |
| | | | | | | | | Plan Review | Status | Review Completion Date | Project Coordination, Application Submittal | External Wait Time | 10/15/25 | Pre Issuance Coord, Pre Issuance SI | Approved | 12/04/25 | Building, Application Submittal | Waiting for info | 10/15/25 | Building, Pre Issuance SI | Approved | 12/04/25 | Mechanical, Application Submittal | Information | 10/15/25 | Electrical, Application Submittal | Information | 10/15/25 | Zoning, Application Submittal | Waiting for info | 10/15/25 | Zoning, Pre Issuance SI | Approved | 12/04/25 | SDC, Application Submittal | Approved | 10/15/25 | SDC, Post Issuance SI | Approved | 03/11/26 |
| | |
| | | | | | | | | | | | | | PERMITS AND INSPECTIONS | Permit Type | Status | | Issued Date | Expiration Date | Completion Date | | Building | Active | 12/16/25 | 02/18/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 118 Framing | Reviewed | 01/13/26 | AEParrish | Phase 1 metal stud framing for rooms 105,106, 108 ,109, and metal stud door framing for restroom 118. | | | 118 Framing | Cancelled | 07/28/26 | AEParrish | Cancelled per contractor, wrong permit # was requested. | | | 118 Framing | Needed | | | | | | 121 Ceiling Grid | Reviewed | 02/04/26 | AEParrish | Ceiling grid for rooms 105, 106, 108 and 109 ok. | | | 121 Ceiling Grid | Needed | | | | | | 143 Fire Regulation | Approved | 02/23/26 | ATBrushett | Knox box provided ad gate and building keys installed. Fire extinguishers updated | | | 919 Bicycle Parking | Approved | 02/23/26 | VHVallentyne | Note: Bicycle locker location was approved to be moved to the back (south side) of the building near employee entrance by both Land Use AXL and Commercial CRA Please request Bicycle Parking inspection once the 1 long term bicycle locker has been installed, as shown on "07_G000_COVER" plan sheet. | | | 199 Final Building | Needed | | | | Electrical | Done | 12/16/25 | 02/18/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 210 Undergrnd/Slab Elec | Not Needed | 02/13/26 | SRFitzHenry | | | | 225 Elec Ceiling Cover | Approved | 02/13/26 | SRFitzHenry | | | | 220 Rough Electrical | Approved | 01/13/26 | SRFitzHenry | interior walls that are assosiated with this permit ok to cover | | | 230 Limited Energy | Approved | 02/13/26 | SRFitzHenry | | | | 299 Final Electrical | Approved | 02/13/26 | SRFitzHenry | | Plumbing | Done | 12/16/25 | 02/18/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 318 Under Floor Plumb | Approved | 01/15/26 | JSHemmele | | | | 320 Rough Plumbing | Approved | 02/17/26 | JSHemmele | | | | 399 Final Plumbing | Approved | 02/17/26 | JSHemmele | |
| | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | Fees | Total Due | Amount Paid | Paid Date | Amount Due | Building | $6,860.66 | $6,860.66 | | $0.00 | Building Plan Check per Applicant Value | $1,465.97 | $1,465.97 | 12/16/25 | $0.00 | Supplemental Plan Review, Bldg | $149.50 | $149.50 | 12/16/25 | $0.00 | Fire/Life Safety Plan Check | $902.14 | $902.14 | 12/16/25 | $0.00 | Building Permit Fee per Bldg Div Value | $2,255.34 | $2,255.34 | 12/16/25 | $0.00 | Zoning Plan Check | $1,014.90 | $1,014.90 | 12/16/25 | $0.00 | Supplemental Plan Review, Zoning | $11.50 | $11.50 | 12/16/25 | $0.00 | Zoning Inspection | $115.00 | $115.00 | 12/16/25 | $0.00 | State Surcharge, Structural | $295.73 | $295.73 | 12/16/25 | $0.00 | Building Technology Admin Fee, Local | $118.29 | $118.29 | 12/16/25 | $0.00 | Building Admin Fee, Local | $10.35 | $10.35 | 12/16/25 | $0.00 | Building Plan Check Admin | $318.96 | $318.96 | 12/16/25 | $0.00 | Building Admin Fee, State | $202.98 | $202.98 | 12/16/25 | $0.00 | Electrical | $373.46 | $373.46 | | $0.00 | Branch Circuits w/o Feeders or Service | $300.90 | $300.90 | 12/16/25 | $0.00 | State Surcharge, Electrical | $39.46 | $39.46 | 12/16/25 | $0.00 | Electric Technology Admin Fee, Local | $6.02 | $6.02 | 12/16/25 | $0.00 | Electric Admin Fee, State | $27.08 | $27.08 | 12/16/25 | $0.00 | Electric Plan Check Admin | $0.00 | $0.00 | 12/16/25 | $0.00 | Plumbing | $247.61 | $247.61 | | $0.00 | Plumbing Fixtures | $142.50 | $142.50 | 12/16/25 | $0.00 | Removal, Abandonment, Cap of Fixture | $57.00 | $57.00 | 12/16/25 | $0.00 | State Surcharge, Plumbing | $26.16 | $26.16 | 12/16/25 | $0.00 | Plumbing Technology Admin Fee, Local | $3.99 | $3.99 | 12/16/25 | $0.00 | Plumbing Plan Check Admin | $0.00 | $0.00 | 12/16/25 | $0.00 | Plumbing Admin Fee, State | $17.96 | $17.96 | 12/16/25 | $0.00 | SDC | $80.00 | $80.00 | | $0.00 | Total All Fees | $7,561.73 | $7,561.73 | | $0.00 |
| | | |
| | | | | | | | | | | | | | System Development Charges By System |
| | | | | | | | | | | SDC Fees | Total Due | Amount Paid | Paid Date | Amount Due | City SDC Admin | $80.00 | $80.00 | | $0.00 | SDC City Admin | $80.00 | $80.00 | 12/16/25 | $0.00 | Total All SDC Fees | $80.00 | $80.00 | | $0.00 |
| | | |
| | |
| |
| |