City of Eugene
Planning & Development
Building and Permit Services
Permit Number: 25-07077-01
Date: 11/29/2026
Address: 2870 W 10TH PL
Project Description: CHANGE OF USE FROM DMV BUILDING TO OFFICES AND MANUFACTURING OF PREFABRICATED DWELLINGS
Application Type:
Commercial
Status:
Issued
Scope of Work:
Tenant Infill
Zoning:
Heavy Industrial District
Map:
17-04-35-13
Tax Lot:
01601
Subdivision:
Addition:
Lot:
Block:
Date Received:
10/10/25
# Bedrooms:
0
Commitment Date:
10/15/25
# Dwelling Units:
0
Ready to issue as of:
12/04/25
In Flood Plain:
Project Coordinator:
Catherine R Allen
Phone:
541-682-6381
  
Sign Standards:
 
BUILDING CHARACTERISTICS
Construction Types:
5B
Construction Type Comments:
 
OccupancyTypes:
B
 
Occupancy Type Comments:
F1
 
total for building
S1
 
 
Occupancy Load:
28
Separated Building:
No
Fire Sprinklers:
No
 
Fire Alarms:
N/A
 
Building Area:
0
Number of Stories:
0
Comment:
no new area
Floor Areas (sq ft):
Floor
Existing Floor Area
New Floor Area
Total Area
Existing floor area may not be shown.
CONTRACTOR DATA
Type
Contractor
Building
ESSEX GENERAL CONSTRUCTION
Electric
PNW ELECTRIC LLC
Plumbing
HCH MECHANICAL
Primary Contact
MOORE JOSEPH E (JOE)
PLAN REVIEW SUMMARY
Plan review data displayed is the most current for each review. The applicant will receive notification of all issues needing additional information after all reviews on a project have been completed. Supplemental Information (SI) can be submitted prior to or after permit issuance. If you have any questions regarding your project, contact CRAllen at 541-682-6381 or send email to Catherine.R.Allen@ci.eugene.or.us. Also note that some reviews (i.e., fire alarms, fire sprinklers) are deferred submittals and will be reviewed after original permit(s) have been issued.
Status Definitions
Pending
=
Review has not been started
Review
=
Under review
Waiting
=
Review for individual review has been completed, waiting for a response
External Wait
=
All reviews for project have been completed, waiting for a response
Approved
=
Review has been approved
Information
=
Information only, review not approved
Denied
=
Project cannot be approved as submitted
For information regarding the review of your project or the commitment date for completion of review, please contact your project coordinator, CRAllen, at Catherine.R.Allen@ci.eugene.or.us or by phone at 541-682-6381.
Plan Review
Status
Review Completion Date
Project Coordination, Application Submittal
External Wait Time
10/15/25
Pre Issuance Coord, Pre Issuance SI
Approved
12/04/25
Building, Application Submittal
Waiting for info
10/15/25
Building, Pre Issuance SI
Approved
12/04/25
Mechanical, Application Submittal
Information
10/15/25
Electrical, Application Submittal
Information
10/15/25
Zoning, Application Submittal
Waiting for info
10/15/25
Zoning, Pre Issuance SI
Approved
12/04/25
SDC, Application Submittal
Approved
10/15/25
SDC, Post Issuance SI
Approved
03/11/26
PERMITS AND INSPECTIONS
Permit Type
Status
 
Issued Date
Expiration Date
Completion Date
 
Building
Active
12/16/25
02/18/27
  
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
118 Framing
Reviewed
01/13/26
AEParrish
Phase 1 metal stud framing for rooms 105,106, 108 ,109, and metal stud door framing for restroom 118.
 
118 Framing
Cancelled
07/28/26
AEParrish
Cancelled per contractor, wrong permit # was requested.
 
118 Framing
Needed
   
 
121 Ceiling Grid
Reviewed
02/04/26
AEParrish
Ceiling grid for rooms 105, 106, 108 and 109 ok.
 
121 Ceiling Grid
Needed
   
 
143 Fire Regulation
Approved
02/23/26
ATBrushett
Knox box provided ad gate and building keys installed. Fire extinguishers updated
 
919 Bicycle Parking
Approved
02/23/26
VHVallentyne
Note: Bicycle locker location was approved to be moved to the back (south side) of the building near employee entrance by both Land Use AXL and Commercial CRA Please request Bicycle Parking inspection once the 1 long term bicycle locker has been installed, as shown on "07_G000_COVER" plan sheet.
 
199 Final Building
Needed
   
Electrical
Done
12/16/25
02/18/27
  
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
210 Undergrnd/Slab Elec
Not Needed
02/13/26
SRFitzHenry
 
 
225 Elec Ceiling Cover
Approved
02/13/26
SRFitzHenry
 
 
220 Rough Electrical
Approved
01/13/26
SRFitzHenry
interior walls that are assosiated with this permit ok to cover
 
230 Limited Energy
Approved
02/13/26
SRFitzHenry
 
 
299 Final Electrical
Approved
02/13/26
SRFitzHenry
 
Plumbing
Done
12/16/25
02/18/27
  
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
318 Under Floor Plumb
Approved
01/15/26
JSHemmele
 
 
320 Rough Plumbing
Approved
02/17/26
JSHemmele
 
 
399 Final Plumbing
Approved
02/17/26
JSHemmele
 
To request an inspection go to https://pdd.eugene-or.gov/BuildingPermits/InspectionLogin.
For more information call 541-682-5283.
FEES
Fees
Total Due
Amount Paid
Paid Date
Amount Due
Building
$6,860.66
$6,860.66
 
$0.00
Building Plan Check per Applicant Value
$1,465.97
$1,465.97
12/16/25
$0.00
Supplemental Plan Review, Bldg
$149.50
$149.50
12/16/25
$0.00
Fire/Life Safety Plan Check
$902.14
$902.14
12/16/25
$0.00
Building Permit Fee per Bldg Div Value
$2,255.34
$2,255.34
12/16/25
$0.00
Zoning Plan Check
$1,014.90
$1,014.90
12/16/25
$0.00
Supplemental Plan Review, Zoning
$11.50
$11.50
12/16/25
$0.00
Zoning Inspection
$115.00
$115.00
12/16/25
$0.00
State Surcharge, Structural
$295.73
$295.73
12/16/25
$0.00
Building Technology Admin Fee, Local
$118.29
$118.29
12/16/25
$0.00
Building Admin Fee, Local
$10.35
$10.35
12/16/25
$0.00
Building Plan Check Admin
$318.96
$318.96
12/16/25
$0.00
Building Admin Fee, State
$202.98
$202.98
12/16/25
$0.00
Electrical
$373.46
$373.46
 
$0.00
Branch Circuits w/o Feeders or Service
$300.90
$300.90
12/16/25
$0.00
State Surcharge, Electrical
$39.46
$39.46
12/16/25
$0.00
Electric Technology Admin Fee, Local
$6.02
$6.02
12/16/25
$0.00
Electric Admin Fee, State
$27.08
$27.08
12/16/25
$0.00
Electric Plan Check Admin
$0.00
$0.00
12/16/25
$0.00
Plumbing
$247.61
$247.61
 
$0.00
Plumbing Fixtures
$142.50
$142.50
12/16/25
$0.00
Removal, Abandonment, Cap of Fixture
$57.00
$57.00
12/16/25
$0.00
State Surcharge, Plumbing
$26.16
$26.16
12/16/25
$0.00
Plumbing Technology Admin Fee, Local
$3.99
$3.99
12/16/25
$0.00
Plumbing Plan Check Admin
$0.00
$0.00
12/16/25
$0.00
Plumbing Admin Fee, State
$17.96
$17.96
12/16/25
$0.00
SDC
$80.00
$80.00
 
$0.00
Total All Fees
$7,561.73
$7,561.73
 
$0.00
System Development Charges By System
SDC Fees
Total Due
Amount Paid
Paid Date
Amount Due
City SDC Admin
$80.00
$80.00
 
$0.00
SDC City Admin
$80.00
$80.00
12/16/25
$0.00
Total All SDC Fees
$80.00
$80.00
 
$0.00
Page 1 of 1
Date: 11/29/2026