| | | | | | | | | | | | | | | | | | | | | | Building and Permit Services |
| | | | Permit Number: 25-04511-01 |
| | | | | | | | | | | | | | | | | | | | | | | Address: 1161 E 13TH AVE | Project Description: Deferred maintenance renovation including voluntary seismic upgrade. | Application Type: | Commercial | Status: | Issued | Scope of Work: | Phased Permit | Zoning: | Public Land | Map: | 17-03-32-00 | Tax Lot: | 00100 | Subdivision: | | Addition: | | Lot: | | Block: | | Date Received: | 07/11/25 | # Bedrooms: | 0 | Commitment Date: | 09/08/25 | # Dwelling Units: | 0 | Ready to issue as of: | 05/14/26 | In Flood Plain: | | Project Coordinator: | Catherine R Allen | Phone: | 541-682-6381 | | | | Sign Standards: | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Construction Type Comments: |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Floor | Existing Floor Area | New Floor Area | Total Area | 1st Floor | 9999 | 826 | 10825 | 2nd Floor | 8244 | 2596 | 10840 | 3rd Floor | 6498 | 0 | 6498 | 4th Floor | 5692 | 210 | 5902 | Basement 1 | 7668 | 1413 | 9081 |
| | | | | | | Existing floor area may not be shown. |
| | | |
| | |
| | | | | | | | | | | | | | | | | | | | | Type | Contractor | Building | BREMIK CONSTRUCTION INC | Electric | ON ELECTRIC GROUP INC DBA OEG INC | Mechanical | ARCTIC SHEET METAL INC | Plumbing | ARCTIC SHEET METAL INC | Primary Contact | PEARRE JESSICA |
| | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Plan review data displayed is the most current for each review. The applicant will receive notification of all issues needing additional information after all reviews on a project have been completed. Supplemental Information (SI) can be submitted prior to or after permit issuance. If you have any questions regarding your project, contact CRAllen at 541-682-6381 or send email to Catherine.R.Allen@ci.eugene.or.us. Also note that some reviews (i.e., fire alarms, fire sprinklers) are deferred submittals and will be reviewed after original permit(s) have been issued. |
| | | | | | | | | | | | | | | | | Review has not been started |
| | | | | | | | | | | | | | | | | Review for individual review has been completed, waiting for a response |
| | | | | | | All reviews for project have been completed, waiting for a response |
| | | | | | | | | | | | | | | | | | | | | | Information only, review not approved |
| | | | | | | | | | | Project cannot be approved as submitted |
| | | | For information regarding the review of your project or the commitment date for completion of review, please contact your project coordinator, CRAllen, at Catherine.R.Allen@ci.eugene.or.us or by phone at 541-682-6381. |
| | | | | | | | | Plan Review | Status | Review Completion Date | Project Coordination, Application Submittal | Approved | 09/09/25 | Post Issuance Coord, Post Issuance SI | Approved | 10/08/26 | Deferred Coordination, Deferred Submittal | Approved | 11/17/26 | Building, Application Submittal | Approved | 07/31/25 | Building, Post Issuance SI | Approved | 10/08/26 | Structural, Application Submittal | Approved | 07/24/25 | Structural, Post Issuance SI | Approved | 03/18/26 | Structural, Deferred Submittal | Approved | 07/30/26 | Mechanical, Application Submittal | Information | 07/14/25 | Electrical, Application Submittal | Information | 07/14/25 | Plumbing, Application Submittal | Information | 07/14/25 | Zoning, Application Submittal | Information | 08/29/25 | Public Works, Application Submittal | Information | 09/09/25 | Fire Marshal, Application Submittal | Approved | 09/04/25 | Erosion Inspection, Application Submittal | Approved | 10/03/25 | Fire Sprinkler Plans, Deferred Submittal | Approved | 11/12/26 | Standpipe, Deferred Submittal | Approved | 11/12/26 |
| | |
| | | | | | | | | | | | | | PERMITS AND INSPECTIONS | Permit Type | Status | | Issued Date | Expiration Date | Completion Date | | Building | Active | 10/07/25 | 11/20/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 103 Footing | Cancelled | 02/20/26 | LODraper | Per the request of the contractor | | | 103 Footing | Reviewed | 03/19/26 | FKamroyev | Shotcrete footings and vert at walls, West and East elevations @ GL: D.6-C.5 along line 0.1 and 2.3. South elevations full wall along GL: D.6. And elevator and pit footing and wall verts ok after SPI. | | | 103 Footing | Reviewed | 03/30/26 | FKamroyev | Basement shotcrete footing and vert for walls @ GL C.5-C @ 2.6-2.3, A-B @ 2-2.5 at East wall and @ B-B.3 @ C.7-AA @ along line 01 at West wall, and 01-2.3 along line AA at North wall ok. Elevator pit walls basement ok Basement Interior shear wall verts ant its footings @ GL A-B.3 @ 01-1 and A-B.3 @ 2.3-2.5 ok. | | | 103 Footing | Reviewed | 05/07/26 | FKamroyev | Northeast entry at basement ok | | | 103 Footing | Reviewed | 07/22/26 | SEGalbreath | Partial for remaining step footings Building B South: Please address following 2 items before pouring: 1) Angled longitudinal top and bottom reinforcement not installed as shown on detail 10 on S5.01. This needs to be verified as done in special inspection report before approval can be given. 2) Due to change in step configuration top and bottom horizontal longitudinal bars with standard hooks do not extend through adjacent step and now terminate a few feet into adjacent step. Please provide documentation from E.O.R that this change is acceptable and that the as-built conditions are approvable. | | | 103 Footing | No Access | 09/23/26 | LODraper | Site closed. OSSC Sec. 110.5 | | | 103 Footing | Reviewed | 10/15/26 | FKamroyev | Shotcrete walls levels 1-2 at C.5 @ 2.7 ok after SPI | | | 103 Footing | Reviewed | 11/24/26 | FKamroyev | SE footings ok @ GL D.1-C.5 @ 2.3-3.3 after SPI approval | | | 103 Footing | Needed | | | | | | 108 Foundation | Info Only | 02/03/26 | FKamroyev | Precon meeting | | | 108 Foundation | Cancelled | 02/19/26 | AEParrish | Cancelled per contractor. | | | 108 Foundation | Reviewed | 04/06/26 | FKamroyev | First floor complete | | | 108 Foundation | Reviewed | 05/04/26 | FKamroyev | Perf pipe at basement ok | | | 108 Foundation | Reviewed | 08/31/26 | FKamroyev | West tunnel walls ok | | | 108 Foundation | Reviewed | 11/24/26 | FKamroyev | SE footings ok @ GL D.1-C.5 @ 2.3-3.3 after SPI approval | | | 108 Foundation | Needed | | | | | | 110 Structural Concrete | Reviewed | 04/27/26 | FKamroyev | 1893 basement ok | | | 110 Structural Concrete | Reviewed | 05/19/26 | FKamroyev | NE basement mechanical room opening ok after SPI | | | 110 Structural Concrete | Reviewed | 05/21/26 | FKamroyev | Level 1 shotcrete walls @ GL: AA.2.2-C-5 ok after SPI | | | 110 Structural Concrete | Reviewed | 05/27/26 | FKamroyev | Shotcrete walls at level 1 West BLD ok | | | 110 Structural Concrete | Reviewed | 06/03/26 | FKamroyev | Level 2 perimeter shotcrete walls ok. | | | 110 Structural Concrete | Reviewed | 06/05/26 | FKamroyev | Rest of level 2 shotcrete walls including East bump out ok. Spoke w/ GC and SPI inspector in regards to bar spacing in between at added bar locations for shotcrete walls. | | | 110 Structural Concrete | Reviewed | 06/18/26 | FKamroyev | SOG at 1914 BLD ok for pour | | | 110 Structural Concrete | Reviewed | 07/08/26 | FKamroyev | Topping SOG at basement of 1893 ok | | | 110 Structural Concrete | Reviewed | 07/15/26 | FKamroyev | Level 3 of 1893 BLD, perimeter shotcrete walls ok after SPI approval. | | | 110 Structural Concrete | Reviewed | 07/27/26 | SEGalbreath | Contractor called/ forgot to schedule for 7/27. Shotcrete walls L4: (D .1-1.0), (C7 .1-1.0), (B3 .1-1.0), (A .1-1.0), (AA .1-2.3), (2.3 C.7-D). OK pending special inspections. | | | 110 Structural Concrete | Reviewed | 08/17/26 | FKamroyev | Tunnel footing and verts ok | | | 110 Structural Concrete | Reviewed | 08/31/26 | FKamroyev | West tunnel walls ok | | | 110 Structural Concrete | Reviewed | 09/09/26 | FKamroyev | Shotcrete walls at BLD B basement and BLD C partial at elevator lobby ok after SPI | | | 110 Structural Concrete | Reviewed | 10/27/26 | FKamroyev | Last interior shotcrete walls @ BLDs A, B and C ok after SPI | | | 110 Structural Concrete | Reviewed | 11/24/26 | FKamroyev | SE footings ok @ GL D.1-C.5 @ 2.3-3.3 after SPI approval | | | 110 Structural Concrete | Needed | | | | | | 118 Framing | Reviewed | 08/03/26 | FKamroyev | Basement lid floor framing, ok | | | 118 Framing | Reviewed | 08/31/26 | FKamroyev | Walk through for stair #1 of stairs rise, height and uniformity. Code sections sent via text message. -FXK. | | | 118 Framing | Reviewed | 09/08/26 | FKamroyev | Stairway 1 & 3 inspection: Stair treads and rise and walking surface slope shall be in compliance with OSSC 1011.5.4, 1011.5.2 and 1011.7.1. -FXK. | | | 118 Framing | Reviewed | 09/28/26 | FKamroyev | Roof sheathing, strap and nailing inspection. Ok for cover. | | | 118 Framing | Reviewed | 10/01/26 | FKamroyev | Most of basement steel stud framing ok pending other trades. Rated shaft walls remain. | | | 118 Framing | Reviewed | 11/24/26 | FKamroyev | Level 1 stair #2 lobby framing ok. Fire-stopping needs to be address prior to full cover. Spoke w/ GC Brandon. | | | 118 Framing | Needed | | | | | | 127 Masonry Construction | Needed | | | | | | 120 Wall/Vault Insulation | Needed | | | | | | 130 Lath or Dry Wall | Reviewed | 08/20/26 | FKamroyev | Structural beam drywall wrap at basement in progress, ok to wrap the rest | | | 130 Lath or Dry Wall | Needed | | | | | | 131 Firestop Assemblies | Reviewed | 09/11/26 | FKamroyev | Fire-stopping at basement beam wrap areas, ok to continue. | | | 131 Firestop Assemblies | Reviewed | 09/21/26 | FKamroyev | Drywall first layer progress at basement lid ok to continue | | | 131 Firestop Assemblies | Reviewed | 09/24/26 | SEGalbreath | basement corridor lids in 2 areas before ductwork. | | | 131 Firestop Assemblies | Reviewed | 10/13/26 | FKamroyev | Basement rate separation wall at MDF and electrical room, drywall ok. South side of basement spray foam insulation ok. | | | 131 Firestop Assemblies | Reviewed | 11/02/26 | FKamroyev | F5 rated floor conditions at basement and rated shafts in progress at level 1 ok to continue | | | 131 Firestop Assemblies | Reviewed | 11/25/26 | FKamroyev | Discussed level 1 stair-well and exit passageway location of not having any through penetrations. Walked basement for rated shafts, still in progress | | | 131 Firestop Assemblies | Needed | | | | | | 121 Ceiling Grid | Needed | | | | | | 124 Final Insulation | Reviewed | 11/25/26 | FKamroyev | Basement thermal ok | | | 124 Final Insulation | Needed | | | | | | 146 Fire Sprinklers | Needed | | | | | | 147 Alarm Systems | Needed | | | | | | 153 Water/Hydrant System | Needed | | | | | | 154 Standpipe | Needed | | | | | | 143 Fire Regulation | Needed | | | | | | 160 Emerg Egress Light | Needed | | | | | | 199 Final Building | Needed | | | | Electrical | Active | 05/14/26 | 11/20/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 210 Undergrnd/Slab Elec | Reviewed | 09/29/26 | JKGoschie | North of building. | | | 210 Undergrnd/Slab Elec | Needed | | | | | | 215 Electrical - Feeder | Needed | | | | | | 217 Electrical Service | Cancelled | 11/09/26 | JKGoschie | | | | 217 Electrical Service | Reviewed | 11/10/26 | JKGoschie | Temp. service is approved. | | | 217 Electrical Service | Needed | | | | | | 213 Bonding/Grounding | Reviewed | 10/30/26 | JKGoschie | Vault ground ring. | | | 213 Bonding/Grounding | Needed | | | | | | 225 Elec Ceiling Cover | Needed | | | | | | 220 Rough Electrical | Cancelled | 09/25/26 | IVRUser | | | | 220 Rough Electrical | Reviewed | 10/01/26 | JKGoschie | Basement exterior walls. | | | 220 Rough Electrical | Reviewed | 11/20/26 | JKGoschie | Basement area A. | | | 220 Rough Electrical | Needed | | | | | | 230 Limited Energy | Reviewed | 11/20/26 | JKGoschie | Basement area A. | | | 230 Limited Energy | Needed | | | | | | 299 Final Electrical | Needed | | | | Fire | Active | 10/07/25 | 11/20/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 849 Final Fire | Needed | | | | Mechanical | Active | 05/14/26 | 11/20/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 420 Rough Mechanical | Reviewed | 09/28/26 | FKamroyev | Basement supply duct, pressure test and duct seal ok. | | | 420 Rough Mechanical | Reviewed | 11/04/26 | FKamroyev | Basement hydronic lines and testing ok. Spoke w/ installer, will call in each floor separately. -FXK. | | | 420 Rough Mechanical | Needed | | | | | | 499 Final Mechanical | Needed | | | | Plumbing | Active | 05/14/26 | 11/20/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 402 Sanitary Sewer - Private | Approved | 09/30/26 | SEKelley | 4" Sch. 40 PVC pumped waste from basement with tracer wire, tied into existing 3034 at Manhole. | | | 403 Storm Sewer - Private | Reviewed | 10/01/26 | SEKelley | 2 sticks of 6" 3034 with tracer wire, north side of building, west of sanitary manhole. Ok to cover. | | | 403 Storm Sewer - Private | Needed | | | | | | 318 Under Floor Plumb | Cancelled | 05/20/26 | IVRUser | | | | 318 Under Floor Plumb | Reviewed | 06/10/26 | SEKelley | 3" cast iron DWV, vent, CO, trap primer in Bldg. C, test ok, ok to cover. | | | 318 Under Floor Plumb | Reviewed | 06/22/26 | SEKelley | Bldg. A underslab cast iron DWV and trap primers, elevator sump drain. Test ok, underfloor complete for Bldg. A. | | | 318 Under Floor Plumb | Needed | | | | | | 320 Rough Plumbing | Reviewed | 09/28/26 | SEKelley | Basement level south of elevator shaft. Domestic hot, cold and return piping. Tests ok, ok to cover. | | | 320 Rough Plumbing | Reviewed | 10/06/26 | RC Kennedy | Restroom and janitors closet, basement level in-wall rough H20 and DWV, test ok. Main floor level restrooms below floor piping DWV, test ok. South kitchenette basement level up to 1st floor, DWV-H20, test ok. RCK | | | 320 Rough Plumbing | Reviewed | 11/04/26 | SEKelley | 1st floor DWV and water tests ok, Rough plumbing complete on 1st floor. | | | 320 Rough Plumbing | Needed | | | | | | 335 Backflow Device | Needed | | | | | | 399 Final Plumbing | Needed | | | | Public Works | Active | 10/07/25 | 11/20/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 725 Stormwater Mgmt Facility | Needed | | | | | | 735 Stormwater Facility Planting | Needed | | | | | | 799 Final Public Works | Needed | | | |
| | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | Fees | Total Due | Amount Paid | Paid Date | Amount Due | Building | $58,973.70 | $55,894.01 | | $3,079.69 | Building Plan Check per Applicant Value | $14,442.57 | $14,442.57 | 10/07/25 | $0.00 | Supplemental Plan Check, Str. Eng. | $57.50 | $57.50 | 04/14/26 | $0.00 | Fire/Life Safety Plan Check | $8,887.74 | $8,887.74 | 10/07/25 | $0.00 | Phased Permit Base Fee | $350.00 | $350.00 | 10/07/25 | $0.00 | Phased Permit Coordination Fee | $1,500.00 | $1,500.00 | 10/07/25 | $0.00 | Fire Systems Plan Check Fee - Sprinklers | $1,045.64 | $0.00 | | $1,045.64 | Deferred Submittal Plan Check | $230.00 | $230.00 | 07/30/26 | $0.00 | Deferred Submittal Plan Check | $232.33 | $0.00 | | $232.33 | Building Permit Fee per Bldg Div Value | $22,219.34 | $22,219.34 | 10/07/25 | $0.00 | Fire System Permit Fee - Sprinklers | $1,608.68 | $0.00 | | $1,608.68 | State Surcharge, Structural | $2,913.49 | $2,913.49 | 10/07/25 | $0.00 | State Surcharge, Structural | $193.04 | $0.00 | | $193.04 | Building Technology Admin Fee, Local | $962.43 | $962.43 | 10/07/25 | $0.00 | Building Admin Fee, State | $1,999.74 | $1,999.74 | 10/07/25 | $0.00 | Building Admin Fee, State | $0.00 | $0.00 | 04/14/26 | $0.00 | Building Plan Check Admin | $2,331.20 | $2,331.20 | 10/07/25 | $0.00 | Building Plan Check Admin | $0.00 | $0.00 | 04/14/26 | $0.00 | Building Plan Check Admin | $0.00 | $0.00 | 07/30/26 | $0.00 | Building Plan Check Admin | $0.00 | $0.00 | | $0.00 | Fire | $3,699.47 | $3,699.47 | | $0.00 | Fire Plan Check | $3,332.85 | $3,332.85 | 10/07/25 | $0.00 | Fire Technology Admin Fee, Local | $66.66 | $66.66 | 10/07/25 | $0.00 | Fire Plan Check Admin | $299.96 | $299.96 | 10/07/25 | $0.00 | Total All Fees | $62,673.17 | $59,593.48 | | $3,079.69 |
| | | |
| | | |
| |
| |