| | | | Permit Number: 25-02370-01 |
| | | | | | | | | | | | | | | | | | | | | | | Address: 1725 W 2ND AVE | Project Description: Reroof, replace mechanical equipment, and plumbing upgrades | Application Type: | Commercial | Status: | Issued | Scope of Work: | Alter/Remodel | Zoning: | Heavy Industrial District | Map: | 17-04-25-30 | Tax Lot: | 03300 | Subdivision: | | Addition: | | Lot: | | Block: | | Date Received: | 04/21/25 | # Bedrooms: | 0 | Commitment Date: | 05/07/25 | # Dwelling Units: | 0 | Ready to issue as of: | 05/07/25 | In Flood Plain: | | Project Coordinator: | Catherine R Allen | Phone: | 541-682-6381 | | | | Sign Standards: | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Construction Type Comments: |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Floor | Existing Floor Area | New Floor Area | Total Area |
| | | | | Existing floor area may not be shown. |
| | | |
| | |
| | | | | | | | | | | | | | | | | | | | | Type | Contractor | Building | RYAN THOMAS CONSTRUCTION | Mechanical | HYDRO-TEMP MECHANICAL INC | Plumbing | HYDRO-TEMP MECHANICAL INC | Primary Contact | MINDER HANS |
| | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Plan review data displayed is the most current for each review. The applicant will receive notification of all issues needing additional information after all reviews on a project have been completed. Supplemental Information (SI) can be submitted prior to or after permit issuance. If you have any questions regarding your project, contact CRAllen at 541-682-6381 or send email to Catherine.R.Allen@ci.eugene.or.us. Also note that some reviews (i.e., fire alarms, fire sprinklers) are deferred submittals and will be reviewed after original permit(s) have been issued. |
| | | | | | | | | | | | | | | | | Review has not been started |
| | | | | | | | | | | | | | | | | Review for individual review has been completed, waiting for a response |
| | | | | | | All reviews for project have been completed, waiting for a response |
| | | | | | | | | | | | | | | | | | | | | | Information only, review not approved |
| | | | | | | | | | | Project cannot be approved as submitted |
| | | | For information regarding the review of your project or the commitment date for completion of review, please contact your project coordinator, CRAllen, at Catherine.R.Allen@ci.eugene.or.us or by phone at 541-682-6381. |
| | | | | | | | | Plan Review | Status | Review Completion Date | Project Coordination, Application Submittal | Approved | 05/07/25 | Deferred Coordination, Deferred Submittal | Approved | 06/04/26 | Building, Application Submittal | Approved | 05/07/25 | Structural, Application Submittal | Approved | 04/29/25 | Structural, Deferred Submittal | Approved | 06/04/26 | Mechanical, Application Submittal | Approved | 05/07/25 |
| | |
| | | | | | | | | | | | | | PERMITS AND INSPECTIONS | Permit Type | Status | | Issued Date | Expiration Date | Completion Date | | Building | Active | 06/30/25 | 04/08/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 118 Framing | Reviewed | 04/13/26 | DBernstein | Not ready OSSC 110.5 Inspection requests. | | | 118 Framing | Cancelled | 08/25/26 | BUUnknown | | | | 118 Framing | Needed | | | | | | 121 Ceiling Grid | Not Needed | 04/13/26 | DBernstein | No work was done all existing grid. | | | 199 Final Building | Needed | | | | Mechanical | Active | 06/30/25 | 04/08/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 420 Rough Mechanical | Reviewed | 10/02/25 | AEParrish | New line set pressure test in room #128 for RTU #102, gauge at 350 PSI. New line set pressure test in room #101for AHU #101, gauge at 280 PSI. Boiler room #203, new boiler installed with 2-3 foot sections of new 3 inch piping. | | | 420 Rough Mechanical | Reviewed | 10/21/25 | FKamroyev | Additional refrigerant lines at level 2 test pressure at 320psi ok, final test to come. | | | 420 Rough Mechanical | Reviewed | 10/27/25 | FKamroyev | Additional line test for wall cover areas, final test to come. -FXK | | | 420 Rough Mechanical | Reviewed | 10/31/25 | AEParrish | Pressure test for RTU103, and RTU104, both tested at 350 PSI. | | | 420 Rough Mechanical | Reviewed | 11/03/25 | FKamroyev | 102 final test ok | | | 420 Rough Mechanical | Reviewed | 11/13/25 | FKamroyev | Pressure test on 101 & ac-101 ok | | | 420 Rough Mechanical | Needed | | | | | | 499 Final Mechanical | Reviewed | 04/03/26 | DBernstein | Caulk all penetrations into all fire rated walls and ceiling per site visit and the conversation with the contractor OSSC 714.1. Also upload all special inspection reports. | | | 499 Final Mechanical | Cancelled | 04/28/26 | DBernstein | Contractor had canceled. | | | 499 Final Mechanical | Needed | | | | Plumbing | Done | 06/30/25 | 04/08/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 320 Rough Plumbing | Approved | 11/13/25 | JSHemmele | | | | 399 Final Plumbing | Approved | 11/13/25 | JSHemmele | Received pictures of floor drain connections and hydrant. JSH |
| | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | Fees | Total Due | Amount Paid | Paid Date | Amount Due | Building | $9,404.44 | $9,149.59 | | $254.85 | Building Plan Check per Applicant Value | $3,030.25 | $3,030.25 | 06/30/25 | $0.00 | Adjusted Building Plan Check | $0.00 | $0.00 | 06/30/25 | $0.00 | Deferred Submittal Plan Check | $229.60 | $0.00 | | $229.60 | Building Permit Fee per Bldg Div Value | $4,661.92 | $4,661.92 | 06/30/25 | $0.00 | State Surcharge, Structural | $611.29 | $611.29 | 06/30/25 | $0.00 | Building Technology Admin Fee, Local | $153.84 | $153.84 | 06/30/25 | $0.00 | Building Technology Admin Fee, Local | $4.59 | $0.00 | | $4.59 | Building Admin Fee, State | $419.57 | $419.57 | 06/30/25 | $0.00 | Building Plan Check Admin | $272.72 | $272.72 | 06/30/25 | $0.00 | Building Plan Check Admin | $20.66 | $0.00 | | $20.66 | Mechanical | $2,542.96 | $2,542.96 | | $0.00 | Mechanical Permit (Applicant Value) | $2,048.92 | $2,048.92 | 06/30/25 | $0.00 | State Surcharge, Mechanical | $268.66 | $268.66 | 06/30/25 | $0.00 | Mechanical Technology Admin Fee, Local | $40.98 | $40.98 | 06/30/25 | $0.00 | Mechanical Admin Fee, State | $184.40 | $184.40 | 06/30/25 | $0.00 | Mechanical Plan Check Admin | $0.00 | $0.00 | 06/30/25 | $0.00 | Plumbing | $128.46 | $128.46 | | $0.00 | Plumbing Fixtures | $26.40 | $26.40 | 06/30/25 | $0.00 | Minimum Permit Fee | $77.10 | $77.10 | 06/30/25 | $0.00 | State Surcharge, Plumbing | $13.57 | $13.57 | 06/30/25 | $0.00 | Plumbing Technology Admin Fee, Local | $2.07 | $2.07 | 06/30/25 | $0.00 | Plumbing Admin Fee, State | $9.32 | $9.32 | 06/30/25 | $0.00 | Plumbing Plan Check Admin | $0.00 | $0.00 | 06/30/25 | $0.00 | Total All Fees | $12,075.86 | $11,821.01 | | $254.85 |
| | | |
| | | |
| |
| |