City of Eugene
Planning & Development
Building and Permit Services
Permit Number: 24-07375-01
Date: 11/28/2026
Address: 2500 MARTIN LUTHER KING JR BLVD
Project Description: University of Oregon Football Operations - Indoor Practice Facility
Application Type:
Commercial
Status:
Issued
Scope of Work:
Phased Permit
Zoning:
Public Land
Map:
17-03-29-40
Tax Lot:
00301
Subdivision:
Addition:
Lot:
Block:
Date Received:
10/07/24
# Bedrooms:
0
Commitment Date:
11/18/24
# Dwelling Units:
0
Ready to issue as of:
10/27/25
In Flood Plain:
Project Coordinator:
Catherine R Allen
Phone:
541-682-6381
  
Sign Standards:
 
BUILDING CHARACTERISTICS
Construction Types:
1BS
Construction Type Comments:
unseparated from existing HDC
OccupancyTypes:
A4
 
Occupancy Type Comments:
B
 
Level 0 = 2954
Level 1 = 1400
Level 2M = 208
Level 4 = 990
S1
 
S2
Parking Garage (Enclosed)
Occupancy Load:
5549
Separated Building:
No
Fire Sprinklers:
Yes Required
 
Fire Alarms:
Yes Required
 
Building Area:
558142
Number of Stories:
6
Comment:
The 2.MO building is an addition to the existing Hatfield Dowlin Complex
Floor Areas (sq ft):
Floor
Existing Floor Area
New Floor Area
Total Area
1st Floor
34147
81180
115327
2nd Floor
18261
0
18261
Mezz 2A
0
19946
19946
3rd Floor
12980
0
12980
4th Floor
27534
16504
44038
5th Floor
23710
0
23710
6th Floor
11931
0
11931
Basement 1
66218
245731
311949
Existing floor area may not be shown.
CONTRACTOR DATA
Type
Contractor
Building
HOFFMAN CONSTRUCTION COMPANY
Electric
CHERRY CITY ELECTRIC
Mechanical
HYDRO-TEMP MECHANICAL INC
Plumbing
HYDRO-TEMP MECHANICAL INC
Primary Contact
BASH JIM
PLAN REVIEW SUMMARY
Plan review data displayed is the most current for each review. The applicant will receive notification of all issues needing additional information after all reviews on a project have been completed. Supplemental Information (SI) can be submitted prior to or after permit issuance. If you have any questions regarding your project, contact CRAllen at 541-682-6381 or send email to Catherine.R.Allen@ci.eugene.or.us. Also note that some reviews (i.e., fire alarms, fire sprinklers) are deferred submittals and will be reviewed after original permit(s) have been issued.
Status Definitions
Pending
=
Review has not been started
Review
=
Under review
Waiting
=
Review for individual review has been completed, waiting for a response
External Wait
=
All reviews for project have been completed, waiting for a response
Approved
=
Review has been approved
Information
=
Information only, review not approved
Denied
=
Project cannot be approved as submitted
For information regarding the review of your project or the commitment date for completion of review, please contact your project coordinator, CRAllen, at Catherine.R.Allen@ci.eugene.or.us or by phone at 541-682-6381.
Plan Review
Status
Review Completion Date
Project Coordination, Application Submittal
External Wait Time
11/18/24
Pre Issuance Coord, Pre Issuance SI
Approved
01/16/25
Post Issuance Coord, Post Issuance SI
Approved
10/22/26
Deferred Coordination, Deferred Submittal
Approved
11/06/26
Building, Application Submittal
Waiting for info
11/15/24
Building, Pre Issuance SI
Approved
01/16/25
Building, Post Issuance SI
Approved
11/04/26
Building, Deferred Submittal
Waiting for info
09/30/26
Structural, Pre Issuance SI
Approved
01/14/25
Structural, Post Issuance SI
Approved
05/15/26
Structural, Deferred Submittal
Approved
11/06/26
Mechanical, Post Issuance SI
Approved
10/22/26
Mechanical, Deferred Submittal
Approved
11/04/26
Electrical, Application Submittal
Approved
11/08/24
Electrical, Post Issuance SI
Approved
11/12/26
Electrical, Deferred Submittal
Approved
09/09/25
Plumbing, Application Submittal
Approved
01/07/25
Plumbing, Pre Issuance SI
Approved
01/10/25
Plumbing, Post Issuance SI
Approved
11/05/26
Zoning, Application Submittal
Waiting for info
11/18/24
Zoning, Pre Issuance SI
Information
01/15/25
Zoning, Post Issuance SI
Approved
03/09/26
Public Works, Application Submittal
Waiting for info
11/15/24
Public Works, Pre Issuance SI
Approved
01/14/25
Public Works, Post Issuance SI
Approved
10/01/26
Public Works, Deferred Submittal
Approved
05/12/26
Stormwater Standards, Application Submittal
Approved
02/11/25
Stormwater Standards, Pre Issuance SI
Information
01/14/25
Stormwater Standards, Post Issuance SI
Approved
05/12/26
SDC, Application Submittal
Approved
02/11/25
Fire Marshal, Application Submittal
Approved
11/14/24
Fire Marshal, Pre Issuance SI
Approved
01/16/25
Fire Marshal, Post Issuance SI
Approved
05/18/26
Fire Marshal, Deferred Submittal
Waiting for info
09/30/26
Erosion Inspection, Application Submittal
Approved
01/16/25
Emergency Generator, Deferred Submittal
Approved
09/12/25
Fire Alarm Plans, Deferred Submittal
Approved
06/29/26
Fire Sprinkler Plans, Deferred Submittal
Approved
01/21/26
Hood Suppression Plans, Deferred Submittal
Approved
05/29/26
Water Main/Hydrant, Deferred Submittal
Waiting for info
12/03/25
PERMITS AND INSPECTIONS
Permit Type
Status
 
Issued Date
Expiration Date
Completion Date
 
Building
Active
01/17/25
11/20/27
  
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
103 Footing
Reviewed
02/24/25
FKamroyev
2nd phase of SE going West retaining wall footings per approved detail 30/S5.205 Ok after SPI approval. Previous corrections still apply to phase 1. Phase 1 poured w/o city approval, see previous memo.
 
103 Footing
Reviewed
02/27/25
LODraper
West end of south parking lot retaining wall footing reinforcement per approved plans. SPI pending.
 
103 Footing
Reviewed
03/11/25
LODraper
Inspection of tower crane footing reinforcement. This footing is not part of the building and not included in the approved drawings. The reinforcement at this location is per the drawings provided on site.
OSSC Sec. 107.4
 
103 Footing
Info Only
03/24/25
LODraper
Pre-construction walk w/Andrew and Compton (Hoffman). Contractor to submit SPI/load testing reports to the City for micropile installations.
 
103 Footing
Reviewed
04/09/25
LODraper
Column footings GL N.5/3.1, K-M/1.7-2.5
Continuous footing GL L/1.5-2.5
Columns not approved by COE.
Z-bars at cont. ftg changed per RFI.
These items are okay to pour per approval by the Building Official. SPI pending.
 
103 Footing
Reviewed
04/11/25
LODraper
Area B shear wall footings at lines N and 1.4, pile caps at lines 1.5 & 1.7 - shear walls and columns have not been approved by the COE at the time of inspection. Okay to pour these items per the Building Official.
OSSC Sec. 107.4
 
103 Footing
Denied
04/18/25
LODraper
Footings previously reviewed on 4-17-25 okay for concrete placement per the approval of the Building Official and pending SPI compliance. Sector B elevator footing not approved to pour.
OSSC Sec. 107.4
 
103 Footing
Reviewed
04/21/25
LODraper
Sector B elevator pit okay to pour per approval of BO and pending SPI compliance.
 
103 Footing
Reviewed
04/28/25
LODraper
Sectors A&B additional columns (3), column footings (6), and sump pump reinforcement ok to pour pending SPI compliance. See Inspector's map for specific locations.
 
103 Footing
Reviewed
05/06/25
LODraper
L0 sector A spread footing line K/6.5, sump footing, elevator 4 walls - ok to pour pending SPI compliance
 
103 Footing
Reviewed
05/08/25
LODraper
Sector A sump pit walls at line ~5.4 ok to pour w/SPI compliance.
 
103 Footing
Reviewed
05/09/25
LODraper
Pile caps (5) line Z/4.5-6 ok to pour pending SPI compliance.
 
103 Footing
Reviewed
05/13/25
LODraper
Sump footing line K.4/6.8 ok to pour pending SPI compliance.
 
103 Footing
Reviewed
05/27/25
LODraper
Sector B column footing GL 1.4/H.4, CIP wall footing line H.7 - ok to pour pending CPI compliance.
 
103 Footing
Cancelled
06/12/25
BUUnknown
 
 
103 Footing
Reviewed
06/17/25
LODraper
Sector A IPF footing at GL 7
 
103 Footing
Reviewed
06/18/25
LODraper
Southeast site wall and IPF footings in progress.
 
103 Footing
Reviewed
06/25/25
LODraper
L0 ne elevator core walls (3), sector C footings (4) GL 1.5/C-G. Additional east site wall footings/walls. SPI pending.
 
103 Footing
Reviewed
07/10/25
LODraper
East connector footings. IPF 5 footing. SPI pending.
 
103 Footing
Reviewed
07/14/25
LODraper
Wall at line 1.5, M, & Z.1. SPI pending.
 
103 Footing
Reviewed
07/23/25
LODraper
Sector B slab on grade in progress
 
103 Footing
Reviewed
08/18/25
LODraper
North shotcrete wall at existing basalt wall GL 5.5-10, additional se site walls
 
103 Footing
Reviewed
09/10/25
LODraper
Sector A slab on grade reinforcement per plan. SPI pending.
 
103 Footing
Reviewed
09/11/25
LODraper
SW IPF footings, NW IPF wall reinforcement per plan. SPI pending.
 
103 Footing
Reviewed
10/01/25
LODraper
L1 sector C deck okay for concrete placement pending SPI compliance.
 
103 Footing
Reviewed
10/07/25
LODraper
L1 deck pour 5 reinforcement in progress
 
103 Footing
Reviewed
11/06/25
LODraper
L1 south connector entry slab reinforcement per plan. SPI pending.
 
103 Footing
Reviewed
12/10/25
LODraper
Reinforcement for (2) south net wall pile caps per detail 8 on sheet S5.206. SPI pending
 
103 Footing
Reviewed
01/26/26
LODraper
Terraced concrete steps ok w/SPI compliance report
 
103 Footing
Reviewed
02/02/26
RZSteiner
connection slab for sloped spectator seating area near line 1.25 S.E. Needs follow up
 
103 Footing
Reviewed
02/09/26
LODraper
East site terrace stair reinforcement ok
 
103 Footing
Reviewed
02/13/26
LODraper
East site terrace steps reinforcement
 
103 Footing
Reviewed
03/05/26
LODraper
East of outdoor field stairs reinforcement
 
103 Footing
Reviewed
04/14/26
LODraper
South site goal post footings
 
103 Footing
Reviewed
04/29/26
LODraper
IPF column base encasement reinforcement per plan at 4 locations GL A.5 & H.5/3-4. SPI pending
 
103 Footing
Needed
   
 
105 Elec Rebar Ground
Cancelled
01/28/26
LODraper
See masonry construction
 
105 Elec Rebar Ground
Needed
   
 
108 Foundation
Denied
02/20/25
FKamroyev
Retaining wall at SE perimeter does not match approved detail 30/S5.205. On-site proposed EOR design changes need to be submitted for city review. OSSC 107.4
 
108 Foundation
Reviewed
02/24/25
FKamroyev
2nd phase of SE going West retaining wall footings per approved detail 30/S5.205 Ok after SPI approval. Previous corrections still apply to phase 1. Phase 1 poured w/o city approval, see previous memo.
 
108 Foundation
Reviewed
04/09/25
LODraper
Column footings GL N.5/3.1, K-M/1.7-2.5
Continuous footing GL L/1.5-2.5
Columns not approved by COE.
Z-bars at cont. ftg changed per RFI.
These items are okay to pour per approval by the Building Official. SPI pending.
 
108 Foundation
Reviewed
04/24/25
LODraper
Sector B elevator pit walls, various columns, L0 cip wall line L/1.5-2.5, sump pit - ok to pour pending SPI compliance.
 
108 Foundation
Reviewed
04/29/25
LODraper
Sector B additional columns and CIP wall reinforcement ok to pour pending SPI compliance. See map for approved items
 
108 Foundation
Reviewed
04/30/25
LODraper
Sector B strip footing GL 4.7, sector C elevator 4 pit footing - OK to pour pending SPI compliance.
 
108 Foundation
Reviewed
05/01/25
LODraper
L0 columns (2) line EX2/L-M ok to pour w/SPI compliance. L0 flood wall at line ~3.65 needs clarification for reinforcement details at openings.
OSSC Sec. 107.4
 
108 Foundation
Reviewed
05/02/25
LODraper
L0 sector B additional columns (9) ok to pour pending SPI compliance. See map for locations
 
108 Foundation
Reviewed
05/07/25
LODraper
L0 flood wall line M/3.65-4.6 ok to pour w/SPI compliance.
 
108 Foundation
Cancelled
05/13/25
LODraper
See footing.
 
108 Foundation
Reviewed
06/02/25
LODraper
L0 sector A shear wall footings at GL 5.5 and M in progress. Not per plan at this time, additional bar required.
OSSC Sec. 107.4
 
108 Foundation
Reviewed
06/05/25
LODraper
IPF footings in progress
 
108 Foundation
Reviewed
06/06/25
LODraper
IPF footings GL H.7/~3.6-5.2, shear wall H.7/1.7-2.5 - ok to pour pending SPI compliance.
 
108 Foundation
Reviewed
06/09/25
LODraper
L0 sector B shear walls GL 1.4 & N - ok to pour pending SI compliance
 
108 Foundation
Reviewed
06/10/25
LODraper
L0 sector B grade beams/footings GL 1 - ok to pour pending SPI compliance.
 
108 Foundation
Reviewed
06/17/25
LODraper
Sector A columns, footings at GL 1
 
108 Foundation
Reviewed
06/20/25
LODraper
Se site wall footings
 
108 Foundation
Reviewed
06/24/25
LODraper
Courtesy inspection of HDPE condenser water piping on test at line 3.6. Current pressure observed at ~80 psi both lines. These plans have not been approved yet and the current installation is part of a revision to route these lines underground.
OMSC Sec. 106.4.1
 
108 Foundation
Reviewed
06/27/25
RZSteiner
Three C10 columns 1 line G.8-H
 
108 Foundation
Reviewed
06/30/25
LODraper
L0 sector A walls at lines 5.5 & M, sector B wall line H.7
 
108 Foundation
Reviewed
07/02/25
LODraper
L0 shear walls at lines H and 5.5
 
108 Foundation
Reviewed
07/09/25
LODraper
Additional line z cont. ftg., line 1 wall/columns, line 7 north columns (2). SPI pending.
 
108 Foundation
Reviewed
07/10/25
LODraper
West side condenser piping (2) from mechanical yard to IPF and expansion joint on test holding at 100 psi each.
 
108 Foundation
Reviewed
07/15/25
LODraper
L0 shear wall at line 2 in progress
 
108 Foundation
Reviewed
07/21/25
LODraper
East side connector-site wall footing, additional z line stem wall
 
108 Foundation
Reviewed
07/25/25
LODraper
L4 player's lounge curbs/pilasters, L0 sector B slab on grade, L0 line 1.5 connector wall. SPI pending.
 
108 Foundation
Reviewed
08/05/25
LODraper
Line Z SOG, columns, &. ftgs. Additional se IPF wall in progress
 
108 Foundation
Reviewed
08/20/25
LODraper
All remaining underground condenser water piping on test holding at or above 1.5x working pressure
 
108 Foundation
Reviewed
09/09/25
LODraper
L1 deck pour 1, sector A slab on grade in progress
 
108 Foundation
Reviewed
09/24/25
LODraper
L1 deck pour 3 ok pending SPI compliance.
 
108 Foundation
Reviewed
09/30/25
RZSteiner
Precast stair walls at ground level 2.5 line. Two center walls remain.
 
108 Foundation
Reviewed
10/03/25
LODraper
L1 deck pour 4 (sector B) okay for concrete placement pending SPI compliance.
 
108 Foundation
Reviewed
10/08/25
LODraper
Line 10 footing reinforcement okay to pour pending SPI compliance.
 
108 Foundation
Reviewed
10/30/25
LODraper
HDC building SOG reinforcement per plan. SPI pending.
 
108 Foundation
Reviewed
11/03/25
RZSteiner
Zone 4 SOG level 0 pending SPI
 
108 Foundation
Cancelled
11/05/25
LODraper
Will reschedule when housekeeping pads are ready.
OSSC Sec. 110.5
 
108 Foundation
Reviewed
12/04/25
LODraper
South side net wall pier footings reinforcement per plan. SPI pending. Multiple SPI compliance reports have been reviewed and accepted related to the compressive strength requirements being met for portions of the scope of this work.
 
108 Foundation
Reviewed
12/15/25
LODraper
NOLR SOMD pour 2, se net wall reinforcement okay for concrete placement w/SPI compliance
 
108 Foundation
Cancelled
12/24/25
BUUnknown
 
 
108 Foundation
Cancelled
02/03/26
LODraper
See foundation
 
108 Foundation
Reviewed
02/17/26
LODraper
Se corner site grade beam reinforcement
 
108 Foundation
Needed
   
 
109 Foundation Drain/Waterproofing
Cancelled
06/23/25
LODraper
Preliminary walk through of initial condenser water installation. Not under test. Will reschedule when ready.
 
109 Foundation Drain/Waterproofing
Needed
   
 
110 Structural Concrete
Reviewed
02/28/25
LODraper
1st section of retaining wall reinforcement at south parking lot ok to pour pending SPI compliance. Ref. RFI #339
 
110 Structural Concrete
Reviewed
03/11/25
LODraper
South parking lot retaining wall reinforcement per plan.
 
110 Structural Concrete
Reviewed
04/09/25
LODraper
Column footings GL N.5/3.1, K-M/1.7-2.5
Continuous footing GL L/1.5-2.5
Columns not approved by COE.
Z-bars at cont. ftg changed per RFI.
These items are okay to pour per approval by the Building Official. SPI pending.
 
110 Structural Concrete
Reviewed
04/11/25
LODraper
Area B shear wall footings at lines N and 1.4, pile caps at lines 1.5 & 1.7 - shear walls and columns have not been approved by the COE at the time of inspection. Okay to pour these items per the Building Official.
OSSC Sec. 107.4
 
110 Structural Concrete
Reviewed
04/17/25
LODraper
Area B spread footings GL 3.7-4.5/K-M, shear wall footing GL 3.65/J.2-M. Vertical elements not approved. Okay to pour these footings per BO and pending SPI compliance.
OSSC Sec. 107.4
 
110 Structural Concrete
Reviewed
04/21/25
LODraper
Sector B elevator pit footing okay to pour per approval of BO and pending SPI compliance.
 
110 Structural Concrete
Reviewed
05/14/25
LODraper
Sector B flood wall line P/4.5 ok to pour pending SPI approval.
 
110 Structural Concrete
Reviewed
05/15/25
LODraper
Sector B sump walls line K/6.65, grease interceptor footing sector B - ok to pour pending SPI compliance.
 
110 Structural Concrete
Reviewed
05/16/25
LODraper
HDC wall at existing building per detail 4 on sheet S6.300 per plan. Ok to pour pending SPI compliance.
 
110 Structural Concrete
Reviewed
05/19/25
LODraper
L0 sector B south of flood wall column footings (5) ok to pour pending SPI compliance. See map for specific locations.
 
110 Structural Concrete
Reviewed
05/21/25
LODraper
Sector A sump walls GL 9/J, pile caps (2) lines 6.5/7, and column reinforcement (5) at column footings inspected during last inspection.
 
110 Structural Concrete
Reviewed
05/23/25
LODraper
L0 sector B shear wall footing GL H.7 in progress
 
110 Structural Concrete
Reviewed
05/28/25
LODraper
Practice facility - north continuous footing GL Z.1, South parking - west site wall footing - ok to pour pending SPI compliance.
 
110 Structural Concrete
Reviewed
05/29/25
LODraper
In progress bottom mat inspection of IPF footings zone B. There are plan sheets related these footings that do not appear to be approved.
OSSC Sec. 107.4
 
110 Structural Concrete
Reviewed
05/30/25
LODraper
Same shear wall footing in progress
 
110 Structural Concrete
Reviewed
06/02/25
LODraper
L0 sector A shear wall footings at GL 5.5 and M in progress. Not per plan at this time, additional bar required.
OSSC Sec. 107.4
 
110 Structural Concrete
Reviewed
06/03/25
LODraper
IPF footings in progress
 
110 Structural Concrete
Reviewed
06/04/25
LODraper
IPF footings in progress. L0 sector A columns (4) ok to pour pending SPI compliance.
 
110 Structural Concrete
Reviewed
06/13/25
LODraper
Sector B IPF footing, east continuous footings - ok to pour pending SPI compliance
 
110 Structural Concrete
Reviewed
06/17/25
LODraper
Sector A columns, footings at GL 1
 
110 Structural Concrete
Reviewed
06/23/25
LODraper
Additional sector A and B columns, IPF footing, and wall. SPI pending.
 
110 Structural Concrete
Reviewed
06/24/25
LODraper
L0 sector B additional column footings line H.9, additional se site wall reinforcement. SPI pending.
 
110 Structural Concrete
Reviewed
06/26/25
RZSteiner
IPF footing Sector D Line 3-4.5 Between A-B. Sector C8 columns along line 1.5. Elevator shaft walls not ready.
 
110 Structural Concrete
Reviewed
07/03/25
LODraper
Z line continuous footing in progress
 
110 Structural Concrete
Reviewed
07/07/25
LODraper
Sector B SOG east of line 3.7
 
110 Structural Concrete
Reviewed
07/11/25
LODraper
Ne IPF wall, additional east site walls, sector A columns (3), and spread footings (2) at IPF ftgs line 6/7. SPI pending.
 
110 Structural Concrete
Reviewed
07/14/25
LODraper
Walls at lines 1.5, M, & Z.1. SPI pending.
 
110 Structural Concrete
Reviewed
07/18/25
LODraper
L0 sector C connector walls at lines 2 & B. SPI pending.
 
110 Structural Concrete
Reviewed
07/29/25
LODraper
Connector-site wall reinforcement
 
110 Structural Concrete
Reviewed
08/01/25
LODraper
Additional sector A columns, se IPF wall in progress, line 7.5 shear wall footing in progress.
 
110 Structural Concrete
Reviewed
08/05/25
LODraper
Line Z SOG, columns, &. ftgs. Additional se IPF wall in progress
 
110 Structural Concrete
Reviewed
08/06/25
LODraper
Additional se IPF wall reinforcement okay to pour pending SPI compliance
 
110 Structural Concrete
Reviewed
08/08/25
LODraper
Additional site wall reinforcement per plan.
 
110 Structural Concrete
Reviewed
08/11/25
RZSteiner
7.5 shear wall 1st level pending SPI.
 
110 Structural Concrete
Reviewed
08/15/25
LODraper
Nw IPF footing, ne slab on grade (5"). SPI pending.
 
110 Structural Concrete
Reviewed
08/21/25
LODraper
Connector stair footings reinforcement per plan. SPI pending.
 
110 Structural Concrete
Reviewed
08/26/25
LODraper
Connector slab on grade reinforcement per plan. SPI pending.
 
110 Structural Concrete
Reviewed
08/27/25
LODraper
North IPF wall GL ~7.6-9.2 reinforcement per plan. SPI pending.
 
110 Structural Concrete
Reviewed
08/29/25
LODraper
Stair 19 wall in progress, remaining se site wall reinforcement per plan.
 
110 Structural Concrete
Reviewed
09/02/25
LODraper
Stair 19 wall and SOG at existing bldg adjacent to connector
 
110 Structural Concrete
Reviewed
09/08/25
LODraper
L1 deck pour 1 reinforcement in progress
 
110 Structural Concrete
Reviewed
09/16/25
LODraper
L1 deck pour 2 reinforcement in progress
 
110 Structural Concrete
Reviewed
09/17/25
LODraper
L1 deck pour 2 reinforcement okay for concrete placement pending SPI compliance.
 
110 Structural Concrete
Reviewed
09/18/25
LODraper
Sector A steel column footings GL 8-9.1 okay to pour w/SPI compliance
 
110 Structural Concrete
Reviewed
09/23/25
LODraper
Sector A classroom stairs stem walls, se site wall, and nw IPF wall reinforcement per plan. SPI pending.
 
110 Structural Concrete
Denied
09/26/25
FKamroyev
Beam on Y line called in for 8am inspection and poured without inspection prior to arrival. OSSC 110.5
Need SPI letter(s) and pictures or other documentation(s) to verify and proof for alternative way for inspection. In addition, need B/O approval.
 
110 Structural Concrete
Reviewed
09/29/25
FKamroyev
Pool rebar at sectors A-B level 1
Lower deck rebar at sector A
SouthEast and South line beam top of shear walls at sector C ok after SPI
 
110 Structural Concrete
Reviewed
10/02/25
LODraper
L1 north sector B deck in progress, SW IPF wall ok w/SPI compliance, stair 19 north and south walls ok
 
110 Structural Concrete
Reviewed
10/07/25
LODraper
L1 deck pour 4 final. SPI pending
 
110 Structural Concrete
Reviewed
10/10/25
LODraper
SW IPF wall reinforcement line 9-10 ok pending SPI compliance
 
110 Structural Concrete
Reviewed
10/14/25
LODraper
L1 deck pour 6 reinforcement in progress, L1 sector A beams at lines Y & Z ok pending SPI compliance.
 
110 Structural Concrete
Reviewed
10/22/25
LODraper
L1 deck pour 5 and sw IPF wall reinforcement. SPI pending.
 
110 Structural Concrete
Reviewed
10/23/25
LODraper
L0 line 10 flood wall reinforcement per plan. SPI pending.
 
110 Structural Concrete
Reviewed
11/04/25
RZSteiner
IPF wall S.E. 4-5 pending SPI
 
110 Structural Concrete
Reviewed
11/19/25
LODraper
L0 slab pour back and stem walls pool equipment area, L4 bathroom and ramp SOMD north of outdoor kitchen - reinforcement at these location per plan. SPI pending.
 
110 Structural Concrete
Denied
11/20/25
LODraper
Connector SOG reinforcement per plan. SPI pending.
L0 column reinforcement at GL ~5.5/K not on COE approved drawings.
OSSC Sec. 107.4
 
110 Structural Concrete
Reviewed
11/25/25
LODraper
West IPF perimeter stemwalls, sector A housekeeping pads. SPI pending
 
110 Structural Concrete
Reviewed
12/01/25
LODraper
L0 north electrical room walls, stair 19 walls, L4 connector SOMD - all reinforcement per plan. SPI pending
 
110 Structural Concrete
Reviewed
12/03/25
LODraper
Additional housekeeping pads, south connector electrical room walls, classroom stairs - SPI pending
 
110 Structural Concrete
Reviewed
12/11/25
LODraper
Level 2M SOMD pour 1 reinforcement okay pending SPI compliance
 
110 Structural Concrete
Reviewed
12/12/25
LODraper
2 additional net wall pile caps at the southwest area. SPI pending
 
110 Structural Concrete
Reviewed
12/18/25
LODraper
Connector roof SOMD reinforcement per plan. SPI pending
 
110 Structural Concrete
Reviewed
12/22/25
LODraper
Additional south end net wall reinforcement per plan. SPI pending
 
110 Structural Concrete
Cancelled
12/29/25
RZSteiner
Wrong Insp/ code
 
110 Structural Concrete
Reviewed
01/05/26
LODraper
NOLR slab pour 3 ok w/SPI compliance
 
110 Structural Concrete
Reviewed
01/07/26
LODraper
Additional south side net wall reinforcement for pour 3 per plan. SPI pending
 
110 Structural Concrete
Reviewed
01/12/26
LODraper
Stair 14 L1-L3 SOMD landings, connector roof curbs, and sw net wall reinforcement per plan. SPI pending
 
110 Structural Concrete
Reviewed
01/21/26
LODraper
NOLR roof SOMD reinforcement per plan. SPI pending
 
110 Structural Concrete
Reviewed
01/26/26
LODraper
NOLR level 2M deck pour 4 reinforcement ok for concrete placement pending SPI compliance
 
110 Structural Concrete
Reviewed
01/29/26
LODraper
NOLR level 2M mechanical pads, roof level sector A curbs reinforcement per plan. SPI pending
 
110 Structural Concrete
Reviewed
02/11/26
LODraper
L0 at HDC existing parking garage area - shear wall modification reinforcement at GL EX2/EFG-EFH. SPI pending
 
110 Structural Concrete
Reviewed
02/13/26
LODraper
Connector LVL 4 N side SOMD, storage & electrical room roofs SOMD, level 1 along 2.5 line. 7.5-7.9 line SOMD level 1. Stairs 13 & 22. SPI pending
 
110 Structural Concrete
Reviewed
02/19/26
LODraper
NOLR level 1 radiant slab ok to pour pending SPI compliance
 
110 Structural Concrete
Reviewed
04/23/26
LODraper
Stairs 19/23, level 1 line 1 curb reinforcement
 
110 Structural Concrete
Reviewed
06/11/26
LODraper
Reinforcement at IPF column base encasements, 4 more locations
 
110 Structural Concrete
Reviewed
08/07/26
LODraper
4 additional column base encasements, 7-10
 
110 Structural Concrete
Reviewed
09/24/26
LODraper
L0 wall GL M/3.5-3.6. SPI pending
 
110 Structural Concrete
Needed
   
 
118 Framing
Cancelled
12/08/25
LODraper
See masonry construction.
 
118 Framing
Info Only
01/22/26
LODraper
Framing pre-construction walk. Spoke to the contractor about the need for rough-in approvals prior to framing cover approval and various firestopping requirements at fire rated walls.
 
118 Framing
Reviewed
02/17/26
LODraper
NOLR north elevation exterior CFS framing, L4 connector above player's lounge eyebrow CFS framing
 
118 Framing
Reviewed
02/26/26
LODraper
NOLR north elevation sheathing (glass roc) attachments per the MII
 
118 Framing
Reviewed
03/18/26
LODraper
L1 east half locker room top-out
 
118 Framing
Reviewed
03/30/26
LODraper
NOLR west wall GL 8
 
118 Framing
Reviewed
04/03/26
LODraper
Coach's office/bathroom/marshall's office okay for ceiling cover w/rough-in approvals
 
118 Framing
Reviewed
04/13/26
LODraper
L1 west locker room, L2M south and east mechanical area exterior walls
 
118 Framing
Reviewed
04/17/26
LODraper
HDC level 1 office 104, HDC level 1 The Loop east and south walls, L2M conference room
 
118 Framing
Reviewed
04/23/26
LODraper
Duck walk CFS, Stair 14 south exterior wall levels 1-4, level 0 drying room area - no cover at cmu rated walls yet, firestopping required. OSSC Sec. 107.4
 
118 Framing
Cancelled
05/06/26
LODraper
See insulation
 
118 Framing
Reviewed
05/13/26
LODraper
NOLR classroom ceiling framing ok
 
118 Framing
Reviewed
05/26/26
LODraper
NOLR level 1 west locker room pod, shower & toilet room area
 
118 Framing
Reviewed
06/05/26
LODraper
L1 north connector walls, L1 east locker room pod drop ceilings
 
118 Framing
Reviewed
06/15/26
LODraper
NOLR level 1 west locker room pod ceilings, nw bathroom area, and sw of locker room bathroom and adjacent rooms
 
118 Framing
Reviewed
06/22/26
RZSteiner
Shaft lid and wall framing level 0 sector C and level 1 sector A
 
118 Framing
Reviewed
07/15/26
LODraper
L1A and L4C bathroom and north utility rooms. No above ceiling cover yet at L4C north where rated walls occur.
 
118 Framing
Reviewed
08/13/26
LODraper
SW classroom furred wall, AV room perimeter, east of locker room ceiling, pool shower ceiling, locker room ceiling
 
118 Framing
Reviewed
08/24/26
LODraper
East side connector eyebrow framing ok
 
118 Framing
Cancelled
09/18/26
LODraper
Contractor not on site, no response to phone call.
 
118 Framing
Reviewed
09/22/26
LODraper
Sports performance, classroom, treadmill pool ceilings. Stair 14 walls
 
118 Framing
Reviewed
10/16/26
LODraper
L0-L4 elevator 5 fronts
 
118 Framing
Needed
   
 
127 Masonry Construction
Reviewed
09/24/25
LODraper
Cmu mockup core samples reviewed per the request by Victor from Hoffman Construction. Precon conducted with Victor and the masonry foreman regarding required city and special inspections.
 
127 Masonry Construction
Reviewed
11/18/25
LODraper
L0-L1 sector C east side cmu walls at lines 2 & E ok to grout pending SPI compliance. Ref. RFI #669
 
127 Masonry Construction
Reviewed
11/24/25
LODraper
Sports performance/medical and nutrition storage rooms full height cmu walls ok to grout pending SPI compliance.
 
127 Masonry Construction
Reviewed
12/03/25
LODraper
L0 connector cmu walls
 
127 Masonry Construction
Reviewed
12/08/25
LODraper
L0 sector C toilet rm, custodial, service corridor cmu walls. SPI pending.
 
127 Masonry Construction
Reviewed
12/11/25
LODraper
L0 connector additional cmu walls okay to grout pending SPI compliance
 
127 Masonry Construction
Reviewed
12/16/25
LODraper
Additional cmu walls at L0 ok to grout w/SPI compliance
 
127 Masonry Construction
Reviewed
12/19/25
LODraper
Additional L0 sector C cmu walls. SPI pending
 
127 Masonry Construction
Reviewed
12/29/25
RZSteiner
Ground 0 CMU around chiller room see A3.100B for location. Pending SPI
 
127 Masonry Construction
Reviewed
01/06/26
LODraper
L0 lobby, sports performance, nutrition storage area cmu walls. SPI pending
 
127 Masonry Construction
Reviewed
01/12/26
LODraper
L0 additional cmu walls okay for grout w/SPI compliance
 
127 Masonry Construction
Reviewed
01/16/26
LODraper
L0 sector B additional cmu walls. SPI pending
 
127 Masonry Construction
Reviewed
01/22/26
LODraper
Additional cmu walls at L0 sector B pool storage and electrical rooms. SPI pending
 
127 Masonry Construction
Reviewed
01/26/26
LODraper
L0 sector B additional cmu walls. SPI pending
 
127 Masonry Construction
Reviewed
01/28/26
LODraper
L0 sector B additional cmu walls ok for grout w/SPI compliance
 
127 Masonry Construction
Reviewed
02/03/26
LODraper
L0 sector A cmu walls at heating plant, service corridor, and electrical room areas. SPI pending
 
127 Masonry Construction
Reviewed
02/09/26
LODraper
L0 sector A additional cmu walls ok to grout pending SPI compliance
 
127 Masonry Construction
Reviewed
02/12/26
LODraper
L0 sector A cmu wall reinforcement. SPI pending
 
127 Masonry Construction
Reviewed
02/18/26
LODraper
L0 sector A cmu walls' reinforcement per plan. SPI pending
 
127 Masonry Construction
Reviewed
02/23/26
LODraper
L0 sector C additional cmu walls north of bathroom/laundry area. SPI pending
 
127 Masonry Construction
Needed
   
 
120 Wall/Vault Insulation
Reviewed
05/06/26
LODraper
NOLR level 2M at line Z
 
120 Wall/Vault Insulation
Reviewed
06/05/26
LODraper
L1 NOLR electrical room 146 south wall
 
120 Wall/Vault Insulation
Denied
09/21/26
LODraper
Contractor unavailable upon arrival onsite. Texts and calls conducted without a response while on site. OSSC Sec. 110.5
 
120 Wall/Vault Insulation
Info Only
11/24/26
LODraper
A discussion with the framing foreman (Alex) regarding inspection requirements for the Oculus framing. It is okay to take pictures showing the connections and CFS gauge to verify that they match the plan details. OSSC Sec. 107.4
 
120 Wall/Vault Insulation
Needed
   
 
130 Lath or Dry Wall
Reviewed
03/30/26
LODraper
NOLR west wall GL 8
 
130 Lath or Dry Wall
Reviewed
04/16/26
LODraper
Elevator 5 levels 1-4 first layer interior
 
130 Lath or Dry Wall
Reviewed
05/01/26
LODraper
L2M duck walk IPF wall, elevator 5 east wall 1st layer
 
130 Lath or Dry Wall
Reviewed
05/06/26
LODraper
Connector south exterior wall all levels (not fire-rated), 2nd layer in progress at elevator 5
 
130 Lath or Dry Wall
Cancelled
05/13/26
LODraper
Not needed today
 
130 Lath or Dry Wall
Reviewed
05/26/26
LODraper
NOLR level 1 electrical room 146 south shaft wall and line 6.5 shaft wall core board, level 1-4 shaft wall adjacent to elevator 5 core board
 
130 Lath or Dry Wall
Reviewed
06/05/26
LODraper
L1 NOLR electrical room 146 south wall 1st layer, other walls at this room 1 layer ok
 
130 Lath or Dry Wall
Reviewed
06/15/26
LODraper
Stair 13 south shaft wall core board
 
130 Lath or Dry Wall
Reviewed
06/22/26
RZSteiner
Shaft lid and wall level 0 sector C and level 1 sector A
 
130 Lath or Dry Wall
Reviewed
07/15/26
LODraper
Stair 13 L1-L2M shaft core board
 
130 Lath or Dry Wall
Reviewed
08/13/26
LODraper
South connector elevator shaft 1st layer and stagger
 
130 Lath or Dry Wall
Reviewed
09/22/26
LODraper
Stair 14 walls exterior side
 
130 Lath or Dry Wall
Reviewed
10/16/26
LODraper
L0-L4 elevator 5 fronts shaftliner, L4 connector above lid at IDF room fire caulking
 
130 Lath or Dry Wall
Reviewed
11/10/26
LODraper
Barbershop walls, L0 lobby ceiling framing
 
130 Lath or Dry Wall
Needed
   
 
131 Firestop Assemblies
Needed
   
 
124 Final Insulation
Reviewed
05/01/26
LODraper
L2M NOLR west exterior walls. Connector south exterior wall
 
124 Final Insulation
Reviewed
05/13/26
LODraper
NOLR level 2M stair 13 exterior wall, east side mechanical room insulation and vapor barrier
 
124 Final Insulation
Needed
   
 
146 Fire Sprinklers
Reviewed
01/12/26
ATBrushett
Piping for the 4 field level standpipes has been inspected and is ok to cover. Hydro on the piping for the standpipes OK. Wil need to flush the standpipe system once the system gets water.
 
146 Fire Sprinklers
Reviewed
03/27/26
ESPhillips-Meadow
Cover inspection Level 0 - Sector C & HDC Lanning Office:

Level 0 / sector C: Piping, bracing and heads & whips installed and ok to cover except as follows.
1. Lateral missing on hallway 6" line at ST3B
2. Clarify why the two longitudinal braces are not in place on the 6" in the hallway.
3. Provide lateral on 2.5" line in hallway at CM4S.

4th Floor Lanning Office: ok to cover. Send picture of last bracing in ceiling grid, or review in field later.
 
146 Fire Sprinklers
Reviewed
04/08/26
ATBrushett
Hydro on the system that is fed from the existing building complete. still need to provide bracing to portions of the feed main closest to the riser
 
146 Fire Sprinklers
Reviewed
05/06/26
ATBrushett
Hydro and cover inspection for level zero wet system Electrical, Mechanical, and Pool area corrections needed noted below
-Electrical room heads need to be below the fireproofing and there is an electrical box that is an obstruction
-Conduit needs to be a min 3 inches from the sprinkler heads (hallway)
-End of line restraint in the electrical room 046 and 047
-Need sprinkler under stairs
-End of line restraint and finish main bracing in the under spa area and the pool equipment room
-Level zero zero wet system electrical and mechanical pool area
 
146 Fire Sprinklers
Reviewed
05/19/26
ATBrushett
Bulk feed and Level 1 cover and hydro completed items needing correction are listed below

-Level 1 loop bulk feed hydro
North corridor needs longitudinal bracing and at the transition to the 4 inch
Need 4 way Longitudinal at change in direction for east corner of parking garage
Make sure torque off bolts are snapped off especially where the garage scrim is
Add brace at 90 by the job lunch room
South east corner at level 1 needs 4 way bracing at changes in direction
Need to look at how far after change in direction for bracing

-Level 1
Class rooms need to have line restraint added
Line restraint for branch line by stair
Restraint at water treadmill
Provide line restraint by PT 3
Add line restraint by electrical room for the 2 south branch lines
Add restraint to middle of the south line level 1
Need to see what stretched fabric is and verify it will comply as a thermal barrier
 
146 Fire Sprinklers
Reviewed
05/29/26
ATBrushett
cover and hydro inspection for the levels listed below, corrections needed are noted

Level 2 m sector c needs heads under hvac work over 4 feet hydro.
Also need to verify the standpipe riser outlet will be available in the cabinet.

-Level 4 sector c wet system ok need bracing at seismic joint in new side
-Also need to determine sprinklers for outdoor tv area
-Bracing for the 4th floor risers needs to be added
 
146 Fire Sprinklers
Reviewed
06/05/26
KAHaggas
Coach Lanning's Office inspected for occupancy: sprinklers, alarms, exits all ok, ok to occupy office.
 
146 Fire Sprinklers
Reviewed
06/30/26
ATBrushett
Corrections from the inspection on 5-29 have been made and re inspected.
Cover and hydro for the 4th floor mechanical space OK
 
146 Fire Sprinklers
Reviewed
08/14/26
ESPhillips-Meadow
Hydro for Levell 4 and level 0 Dry systems at 220 PSI for 2 hrs. - OK
Level 4 dry system (patio / kitchen) and Level 0 dry system (tunnel and parking piping and bracing): piping and bracing in place - ok to cover.
 
146 Fire Sprinklers
Needed
   
 
147 Alarm Systems
Reviewed
06/05/26
KAHaggas
Coach Lanning's Office inspected for occupancy: sprinklers, alarms, exits all ok, ok to occupy office.
 
147 Alarm Systems
Needed
   
 
145 Hood Suppression
Needed
   
 
144 Emergency Generator
Needed
   
 
153 Water/Hydrant System
Cancelled
07/22/25
Fire
Accidentally added duplicate inspection in error. -TRZ
 
153 Water/Hydrant System
Reviewed
01/14/26
ATBrushett
The rest of the piping to the hydrant on the southwest side of the project has been installed. Need to hydro flush and flow the system.
 
153 Water/Hydrant System
Cancelled
01/13/26
ATBrushett
 
 
153 Water/Hydrant System
Reviewed
01/15/26
ATBrushett
Hydro did not hold will re test
 
153 Water/Hydrant System
Reviewed
01/16/26
KAHaggas
New fire line on south side of building from future connection to hydrant hydrostatic test ok. Hydrant set too low so will need to be changed, will retest hydrant supply from road valve to hydrant after reset at proper elevation; ok to cover.
 
153 Water/Hydrant System
Reviewed
04/09/26
ATBrushett
Flush and hydro of the underground and FDC stub outs. Still need to do the forward flow when the backflow is installed
 
153 Water/Hydrant System
Needed
   
 
154 Standpipe
Reviewed
04/09/26
ATBrushett
Wrong inspection type
 
154 Standpipe
Needed
   
 
143 Fire Regulation
Reviewed
06/05/26
KAHaggas
Coach Lanning's Office inspected for occupancy: sprinklers, alarms, exits all ok, ok to occupy office.
 
952 ERRC
Needed
   
 
143 Fire Regulation
Needed
   
 
150 Landscaping
Needed
   
 
919 Bicycle Parking
Cancelled
08/19/25
Land Use
 
 
919 Bicycle Parking
Needed
   
 
157 Zoning
Needed
   
 
160 Emerg Egress Light
Needed
   
 
199 Final Building
Denied
08/20/25
LODraper
South parking lot - ADA parking access aisles required to be striped with 'NO PARKING' per the requirements in the Standards for Accessible Parking Places set forth by the Oregon Transportation Commission.
OSSC Sec. 1106.8.1
 
199 Final Building
Denied
06/29/26
LODraper
Coach's Office final inspection - ada accessibility door clearance requirement not met at entry door. This item was previously noted on the framing memo dated 4-3-26. OSSC Sections 107.4 & 1102.1 in accordance with ICC A117.1 section 404.2.3.5(C)
 
199 Final Building
Info Only
07/31/26
LODraper
Existing weight room area okay for occupancy w/trade approvals.
 
199 Final Building
Needed
   
Electrical
Active
03/13/25
11/20/27
  
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
205 Temp Electrical
Approved
04/02/25
JKGoschie
EWEB at 8:34.
 
210 Undergrnd/Slab Elec
Reviewed
06/27/25
BARichardson
connector and area 2 deep
 
210 Undergrnd/Slab Elec
Reviewed
07/24/25
BARichardson
area 2 slab on grade
 
210 Undergrnd/Slab Elec
Reviewed
08/04/25
BARichardson
Main electric room deep
 
210 Undergrnd/Slab Elec
Reviewed
08/22/25
BARichardson
South IPF LV deep, connector slab on grade.
 
210 Undergrnd/Slab Elec
Reviewed
09/04/25
BARichardson
Level 1 slab on grade pour 1 is okay
 
210 Undergrnd/Slab Elec
Reviewed
09/10/25
BARichardson
Area 3 slab on grade
 
210 Undergrnd/Slab Elec
Reviewed
09/17/25
BARichardson
level 1 are2 slab on deck
 
210 Undergrnd/Slab Elec
Reviewed
10/01/25
BARichardson
level 1 connector slab and level 1 pour 4
 
210 Undergrnd/Slab Elec
Reviewed
10/22/25
BARichardson
pour 5 level 1 slab on deck
 
210 Undergrnd/Slab Elec
Reviewed
11/03/25
BARichardson
area 4 slab on grade
 
210 Undergrnd/Slab Elec
Reviewed
01/05/26
BARichardson
Level 2M area 2c and 2d for slab on deck
 
210 Undergrnd/Slab Elec
Reviewed
01/21/26
BARichardson
NOLAR roof slab for sleeves
 
210 Undergrnd/Slab Elec
Reviewed
01/26/26
BARichardson
2M area A slab on deck
 
210 Undergrnd/Slab Elec
Reviewed
02/13/26
BARichardson
level 1 area 4 slab on deck
 
210 Undergrnd/Slab Elec
Needed
   
 
215 Electrical - Feeder
Cancelled
04/30/26
ELUnknown
 
 
215 Electrical - Feeder
Reviewed
07/15/26
BARichardson
E0NHD for temp power for musco poles
 
215 Electrical - Feeder
Reviewed
07/20/26
BARichardson
See highlighted plans on site for approved one-line
 
215 Electrical - Feeder
Reviewed
11/17/26
BARichardson
feeders out of MSA in MSA distribution are ok
 
215 Electrical - Feeder
Reviewed
11/18/26
BARichardson
See highlighted plans on site for approved feeders
 
215 Electrical - Feeder
Needed
   
 
217 Electrical Service
Reviewed
11/17/26
BARichardson
MSA switchgear but still need addition service location label, AIC label and GFP
 
217 Electrical Service
Reviewed
11/18/26
BARichardson
MSB switchgear but still need addition service location label, AIC label and GFP
 
217 Electrical Service
Cancelled
11/24/26
IVRUser
 
 
217 Electrical Service
Reviewed
11/25/26
BARichardson
eweb. See previous comments for addition requirements prior to an approval entry
 
217 Electrical Service
Needed
   
 
213 Bonding/Grounding
Reviewed
06/27/25
BARichardson
lightning ground ring for the NE corner, east side and SE corner (250cu)
 
213 Bonding/Grounding
Reviewed
08/04/25
BARichardson
rebar in the direct contact with the earth in the footing of the IPF footings along the south side this is both the grounding electrode and lightning protection with a continuous 250kcmil copper.
 
213 Bonding/Grounding
Info Only
08/08/25
BARichardson
reviewed a temp skid
 
213 Bonding/Grounding
Reviewed
08/22/25
BARichardson
250kcmil copper continuous in 008 electrical room and tail for the ground bar in this electrical room
 
213 Bonding/Grounding
Reviewed
10/01/25
BARichardson
The metal drain bodies for the pools are bonded
 
213 Bonding/Grounding
Reviewed
10/22/25
BARichardson
The treadmill and both pool shells, perimeter and dry nich lights are okay. The tails for the rail bonding are okay
 
213 Bonding/Grounding
Reviewed
11/03/25
BARichardson
area 4 slab for 250cu grounding electrode conductor for the electric rooms and the yard
 
213 Bonding/Grounding
Needed
   
 
225 Elec Ceiling Cover
Reviewed
03/30/26
BARichardson
area C connector level 0
 
225 Elec Ceiling Cover
Reviewed
04/02/26
BARichardson
Coach offices and adjacent corridor
 
225 Elec Ceiling Cover
Reviewed
04/16/26
BARichardson
conference room on level 2 2M, intern station, level 1 corridor
 
225 Elec Ceiling Cover
Reviewed
04/30/26
BARichardson
remaining Level 0 ceilings
 
225 Elec Ceiling Cover
Reviewed
05/08/26
BARichardson
Hard lids level 1 east
 
225 Elec Ceiling Cover
Cancelled
05/22/26
JKGoschie
 
 
225 Elec Ceiling Cover
Reviewed
05/26/26
BARichardson
Level 1 center Hard lids
 
225 Elec Ceiling Cover
Reviewed
06/05/26
BARichardson
locker pod
 
225 Elec Ceiling Cover
Reviewed
08/24/26
BARichardson
Level 4 hard lids for Area C and for the indoor and outdoor kitchens
 
225 Elec Ceiling Cover
Reviewed
10/09/26
BARichardson
level 1 area A and B
 
225 Elec Ceiling Cover
Reviewed
10/27/26
BARichardson
Duck nest ceiling and nutrition ceiling are okay
 
225 Elec Ceiling Cover
Reviewed
11/06/26
BARichardson
Coach's ramp wall and ceiling cover
 
225 Elec Ceiling Cover
Reviewed
11/17/26
BARichardson
level 4 pre cloud
 
225 Elec Ceiling Cover
Needed
   
 
220 Rough Electrical
Reviewed
01/05/26
BARichardson
connector level 0 CMU walls
 
220 Rough Electrical
Reviewed
01/21/26
BARichardson
NOLAR CMU walls level 0
 
220 Rough Electrical
Reviewed
02/13/26
BARichardson
cmu walls for area A sector A
 
220 Rough Electrical
Info Only
02/24/26
BARichardson
Consultation with Garrett about dedicated equipment space.
 
220 Rough Electrical
Reviewed
03/30/26
BARichardson
Area C Connector level 0
 
220 Rough Electrical
Reviewed
04/02/26
BARichardson
Coach offices and adjacent corridor
 
220 Rough Electrical
Reviewed
04/16/26
BARichardson
conference room on level 2 2M, intern station, level 1 corridor and the new office.
 
220 Rough Electrical
Reviewed
04/30/26
BARichardson
remaining Level 0 walls and elevator at level 4
 
220 Rough Electrical
Reviewed
05/08/26
BARichardson
walls level 1 east
 
220 Rough Electrical
Cancelled
05/22/26
JKGoschie
 
 
220 Rough Electrical
Reviewed
05/26/26
BARichardson
level 1 center walls
 
220 Rough Electrical
Reviewed
06/05/26
BARichardson
locker pod and level 1 north weight room walls
 
220 Rough Electrical
Reviewed
07/15/26
BARichardson
Level1 area A walls
 
220 Rough Electrical
Reviewed
07/20/26
BARichardson
Hard lids for 1A
 
220 Rough Electrical
Reviewed
07/22/26
BARichardson
Northside walls for level 4 area C excluding outdoor kitchen
 
220 Rough Electrical
Reviewed
10/09/26
BARichardson
South area B level 1,
 
220 Rough Electrical
Reviewed
11/06/26
BARichardson
Coach's ramp wall and ceiling cover
 
220 Rough Electrical
Needed
   
 
230 Limited Energy
Needed
   
 
299 Final Electrical
Reviewed
06/05/26
BARichardson
coaches office.
 
299 Final Electrical
Reviewed
07/31/26
BARichardson
Lobby L101, Office 104, Intern Station 215, Timing Track wiremold in existing weight room.
 
299 Final Electrical
Needed
   
 
265 Arc Reduction 1200A or more
Needed
   
 
270 GFP 1000A or more at 480V
Needed
   
Fire
Active
01/17/25
11/20/27
  
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
840 Water/Hydrant System
Reviewed
07/24/25
ATBrushett
Piping inspection has been competed up to the footing of the new building on the east side of the project. The install is in accordance with the original civil drawings, however the contractors still needs to provide the differed submittal for the underground fire line. Hydro was completed but the new hydrant line needs to be flushed.
 
840 Water/Hydrant System
Reviewed
10/24/25
GRGordon
Underground Fire Line Open Cover Inspection. Permit number: 24-07375-01.

Open cover inspection of approximately 300 feet of 8-inch AWWA C-900, UL listed, CPVC pipe; two 45 degree ells; two 11 1/4 degree ells; mega lugged; joint restraints in place.

Will continue run to the west to the fire hydrant at a later date.
Will connect to the building at a later date.

OK to Cover
 
840 Water/Hydrant System
Reviewed
01/12/26
ATBrushett
Piping for the 4 field level standpipes has been inspected and is ok to cover. Hydro on the piping for the standpipes OK. Wil need to flush the standpipe system once the system gets water.
 
849 Final Fire
Reviewed
06/05/26
KAHaggas
Coach Lanning's Office inspected for occupancy: sprinklers, alarms, exits all ok, ok to occupy office.
 
849 Final Fire
Needed
   
Mechanical
Active
10/27/25
11/20/27
  
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
410 Underfloor Mechanical
Needed
   
 
416 Rough Gas Piping
Reviewed
12/12/25
LODraper
L0 main gas piping from meter to water heater room on test holding at 100 psi. This piping is intended to be used for temporary purposes and has been green tagged. Full approval is contingent on verification that the gas piping plans have been reviewed and approved by the COE and field approval of the remainder of the gas piping for the remaining portions of the project.
OMSC Sec. 106.1
 
416 Rough Gas Piping
Denied
01/05/26
LODraper
Additional gas piping at connector serving L0-L4 not holding test pressure
OMSC Sec. C406.4.1
 
416 Rough Gas Piping
Reviewed
01/07/26
LODraper
Connector bldg main gas piping up to L4 kitchen (for temp heat) on test holding at 100psi. Pressure test approved for 2# psig
 
416 Rough Gas Piping
Reviewed
05/22/26
LODraper
L1-L4 gas piping serving L4 connector appliances on test holding at 60 psi
 
416 Rough Gas Piping
Needed
   
 
450 Final Gas Piping
Needed
   
 
420 Rough Mechanical
Info Only
01/13/26
LODraper
Preliminary review of connector building roof curb anchorage requirements. Drawings for the anchorage of the mechanical units at this location have not been submitted and approved by the City yet. OSSC Sec. 107.4, OMSC Sec. 106.4.1
 
420 Rough Mechanical
Reviewed
01/20/26
LODraper
L0 sector C MDF room refrigerant piping on test holding at 500+ psi
 
420 Rough Mechanical
Reviewed
01/23/26
LODraper
L0 connector and HDC hydronic and condensate piping on test holding at 100 psi. No approval for supports yet as deferred submittal for suspended MEPF seismic anchorage has not been submitted to the city. OSSC Sec. 107.4
 
420 Rough Mechanical
Reviewed
01/30/26
LODraper
Level 0 sector C south ice room cooling unit DFCU 0C-03 and 2M weight room unit FCU 2B-13 hydronic and condensate piping on test holding at 100 psi
 
420 Rough Mechanical
Denied
02/11/26
LODraper
L0 sector C dryer venting in progress. Need to provide additional routing details related to supporting requirements that are not noted on the plans. OMSC Sec. 106.4.1
 
420 Rough Mechanical
Reviewed
02/18/26
LODraper
NOLR level 1 sector B hydronic floor piping on test at GL 1.6-4.5 - holding at 75-80 psi
 
420 Rough Mechanical
Reviewed
02/19/26
LODraper
NOLR level 1 additional hydronic piping at sector A on test holding at 80 psi
 
420 Rough Mechanical
Reviewed
02/23/26
LODraper
NOLR level 1 remaining radiant floor hydronic piping on test observed starting at 80 psi, dropped to 78 psi over the course of 30 minutes. Contractor to check for potential leaks and recall if found
 
420 Rough Mechanical
Reviewed
02/24/26
LODraper
NOLR level 1 remaining radiant floor hydronic piping on test holding at 80 psi.
 
420 Rough Mechanical
Reviewed
02/26/26
LODraper
NOLR roof level curb attachments observed - drawings not submitted to the COE. OSSC Sec. 107.4
 
420 Rough Mechanical
Reviewed
03/10/26
LODraper
L0 sector C dryer duct fire wrap installed per MII
 
420 Rough Mechanical
Reviewed
03/13/26
LODraper
L4 existing coach's office heating and chilled water piping on test holding at 80 psi
 
420 Rough Mechanical
Denied
03/20/26
LODraper
Seismic anchorage of suspended MEPF equipment. This submittal has not been submitted to the City of Eugene for review. It will not be inspected until it has been submitted to the COE. OSSC Sec. 107.3.4.1
 
420 Rough Mechanical
Reviewed
03/25/26
LODraper
L1 east barbershop hot water piping on test holding at 80 psi
 
420 Rough Mechanical
Cancelled
03/26/26
LODraper
Not ready. OSSC Sec. 110.5
 
420 Rough Mechanical
Cancelled
03/29/26
LODraper
Not ready. OSSC Sec. 110.5
 
420 Rough Mechanical
Reviewed
03/31/26
LODraper
NOLR level 1 sector B hydronic piping testing approved from GL 1-5.5 south to line E
 
420 Rough Mechanical
Reviewed
04/02/26
LODraper
L4 coach's office above ceiling except bathroom and marshal's office
 
420 Rough Mechanical
Reviewed
04/06/26
LODraper
Chilled water piping 2M mech room to office 104 on test holding at 60 psi
 
420 Rough Mechanical
Reviewed
04/07/26
LODraper
L0 connector toilet rooms ok
 
420 Rough Mechanical
Reviewed
04/14/26
LODraper
NOLR level 1 mechanical piping seismic restraints
 
420 Rough Mechanical
Reviewed
04/17/26
LODraper
Connector L4-roof refrigerant piping on test holding at 550 psi, HDC office 104 above grid ducting, L2M conference room above grid ducting and FC unit seismic
 
420 Rough Mechanical
Reviewed
04/22/26
LODraper
L0 lobby and L2M intern stations above lid ducting ok
 
420 Rough Mechanical
Cancelled
05/01/26
IVRUser
 
 
420 Rough Mechanical
Reviewed
05/04/26
LODraper
Chilled water piping from L0 chiller room up to 2M and refrigerant piping for HP-0B-01 on test, drying room ducting ok for cover
 
420 Rough Mechanical
Reviewed
05/08/26
LODraper
L0 chiller room condenser water piping on test holding at 150 psi, L1 sector B bathroom and locker room east of line 2.5 above ceiling ok
 
420 Rough Mechanical
Reviewed
05/12/26
LODraper
L0-L4 south connector shafts. Dryer duct installation specifications still outstanding. OMSC Sec. R106.4.1
 
420 Rough Mechanical
Reviewed
05/13/26
LODraper
L1 connector mechanical piping, L0-L4 condensate piping - all on test holding 100 psi
 
420 Rough Mechanical
Reviewed
05/15/26
LODraper
NOLR classroom above ceiling ducting seismic restraints verified
 
420 Rough Mechanical
Reviewed
05/18/26
LODraper
North connector L1-roof hydronic piping on test holding at 100 psi
 
420 Rough Mechanical
Reviewed
05/22/26
LODraper
L2M sector C mechanical piping seismic restraints ok
 
420 Rough Mechanical
Reviewed
05/26/26
LODraper
NOLR level 1 west locker room above ceiling ok
 
420 Rough Mechanical
Reviewed
05/29/26
LODraper
The rest of 1B north Chilled Weld Pipe- through floor- Pool room piping and through the coil kits of the 3 Electrical room cooling units. Welded heating water pipe from level 0 hallway isolation valves- pool room piping- existing pipe already tested- both coils and kits of Drying room units and piping/coil and kit of Chiller Room Unit
Chilled Water in Chiller room from isolation valve to chiller room unit and electrical room unit south of chiller room - all on test holding 100+ psi
 
420 Rough Mechanical
Reviewed
06/08/26
LODraper
South connector shaft ducting fire wrap levels 1-4. NOLR level 1 sector B shower area SA/EA ducts
 
420 Rough Mechanical
Reviewed
06/10/26
LODraper
Connector level 4 grease duct light test approved
 
420 Rough Mechanical
Reviewed
06/22/26
RZSteiner
hydronic pressure test level 0-1 sector A and condensate level 1
Page 1 of 2
Date: 11/28/2026

 
420 Rough Mechanical
Reviewed
07/01/26
LODraper
Connector south shafts ducting fire wrap levels 1-4. Dryer duct 2M-roof okay, fire wrap to come later. L1 above lid ducting south portion okay
 
420 Rough Mechanical
Reviewed
07/02/26
LODraper
All heating water in 2MA to air handler isolation valves. All 1A main piping, branches, coil kits, and coils. All 1B coil piping to units
 
420 Rough Mechanical
Reviewed
07/07/26
LODraper
2" chilled water from 2MA mezz to 1 west electrical room valves/1A wall cooling unit locations/0A piping including coil kits in heat plant and into 0 A west electrical - on test holding at 150 psi.
 
420 Rough Mechanical
Reviewed
07/10/26
LODraper
L1A mechanical piping supports, insulation okay
 
420 Rough Mechanical
Reviewed
07/16/26
LODraper
L1A ceiling cover ok, final connection for grease duct at L4C ceiling ok
 
420 Rough Mechanical
Reviewed
08/07/26
LODraper
Connector level 1 North seismic flexes and The Chilled water mains and Branch piping in 2M A to the Air handler Isolation Valves
 
420 Rough Mechanical
Cancelled
08/14/26
LODraper
Intended to be scheduled under rough plumbing
 
420 Rough Mechanical
Reviewed
08/17/26
LODraper
4C-RTU refrigerant piping on test holding at 350+psi
 
420 Rough Mechanical
Reviewed
08/25/26
LODraper
L4C bathrooms ok for cover
 
420 Rough Mechanical
Reviewed
08/26/26
LODraper
L0 sector A remaining copper hydronic piping, chilled water piping to Air Handlers 1-5 - on test holding pressure 150+
 
420 Rough Mechanical
Reviewed
08/28/26
LODraper
Level 2MA Air Handler OSA ducting and weight room flex drops ok
 
420 Rough Mechanical
Reviewed
09/01/26
LODraper
Air handler pipe hydronic testing - chilled water on 6 thru 8 and heating water on 1 thru 3
 
420 Rough Mechanical
Reviewed
09/08/26
LODraper
Hydronic piping on test - Rest of heating on AHU 1-8, chilled on AHU 9,
chilled and heating on 10, DFCU tie in in level 0 C electrical room
 
420 Rough Mechanical
Reviewed
09/10/26
LODraper
Outdoor kitchen grease duct light test approved.
 
420 Rough Mechanical
Reviewed
09/22/26
LODraper
Sports performance, treadmill pool, west of stair 14 above ceilings
 
420 Rough Mechanical
Cancelled
09/22/26
IVRUser
 
 
420 Rough Mechanical
Reviewed
09/23/26
LODraper
Level 2 sector A AV room chilled and heating pressure test to units and seismic in that room. All west Yard chilled and heating water pressure test. Level 2M sector A ERV piping test
 
420 Rough Mechanical
Reviewed
09/24/26
LODraper
Condensing water pressure test chiller room to the cooling towers and a flood test of the cooling towers
 
420 Rough Mechanical
Reviewed
10/13/26
LODraper
Hydronic piping pressure test for DFCUs serving L1 IDF riser room 147 and electrical room 145
 
420 Rough Mechanical
Cancelled
10/27/26
IVRUser
 
 
420 Rough Mechanical
Reviewed
10/28/26
LODraper
5C rooftop air handler piping, 2M cabinet unit heater piping pressure test
Ducting at classroom east, Duck Nest, Sports Performance Center, & Duck Walk areas
 
420 Rough Mechanical
Reviewed
11/19/26
LODraper
Pool Room drops to heat exchangers and the 3 radiant pump stations
 
420 Rough Mechanical
Needed
   
 
499 Final Mechanical
Cancelled
04/02/26
LODraper
See rough mechanical
 
499 Final Mechanical
Needed
   
Plumbing
Active
01/17/25
11/20/27
  
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
402 Sanitary Sewer - Private
Cancelled
04/09/25
RC Kennedy
Needed public sanitary sewer inspection. RCK
 
402 Sanitary Sewer - Private
Reviewed
04/10/25
RC Kennedy
Spoke with contractor, they are having issues with groundwater. Ok to send pictures on deeper piping between public manhole and next upstream manhole. Once they get above groundwater ditches will be left open for inspection. RCK
 
402 Sanitary Sewer - Private
Reviewed
04/11/25
RC Kennedy
24-07375-01 sanitary-reviewed-Pgs. C6.12, 3-14’ sticks of 12” 3034 with tracer wire okay to cover. Received pictures of yesterday’s installation.
 
402 Sanitary Sewer - Private
Reviewed
04/14/25
RC Kennedy
24-07375-01, Sanitary, Reviewed Pg. C6.12, 98’ of 12” 3034 with tracer wire, okay to cover.
 
402 Sanitary Sewer - Private
Reviewed
04/15/25
RC Kennedy
24-07375-01-Sanitary-Reviewed-pg. C6.12, 140’ of 12” 3034 with tracer wire connecting to Sanitary MH-03 (setting today) okay to cover.
 
402 Sanitary Sewer - Private
Reviewed
04/16/25
RC Kennedy
24-07375-01-Reviewed-Sanitary-pg. C6.12, 56’ of 12” 3034 with tracer wire from MH #3 going east.
 
402 Sanitary Sewer - Private
Reviewed
04/17/25
RC Kennedy
24-07375-01-Sanitary-Reviewed 175’ of 12” 3034 with tracer wire connected to MH #1. Air tested MH #3 to #1-passed, Air tested MH #3 to MH #2, passed test.
 
402 Sanitary Sewer - Private
Reviewed
04/21/25
RC Kennedy
24-07375-01-Sanitary-Reviewed-pipe seals grouted and channeling complete in MH’s #2 and #3.
 
402 Sanitary Sewer - Private
Reviewed
04/22/25
RC Kennedy
24-07375-01-Reviewed-Sanitary, channeling of MH’s.
 
402 Sanitary Sewer - Private
Cancelled
04/23/25
RC Kennedy
Needed storm. RCK
 
402 Sanitary Sewer - Private
Reviewed
04/24/25
RC Kennedy
24-07375-01-Sanitary-No new work, work was on Public MH, will document Public Sanitary.
 
402 Sanitary Sewer - Private
Reviewed
04/25/25
SEKelley
Pg. C6.13, 39’ of 12” 3034 with tracer wire connected to 6” live line from Mo Center discharging into pvt. MH #1.
 
402 Sanitary Sewer - Private
Reviewed
04/28/25
RC Kennedy
24-07375-01-Reviewed-sanitary, Pg. C6.13, MH #1 channeled, 20’ of 12” 3034 with tracer wire, 1-12” by 6” c/o. Okay to cover.
 
402 Sanitary Sewer - Private
Reviewed
04/29/25
RC Kennedy
24-07375-01-Sanitary Private-Reviewed, Pg. C6.13, 24’ of 12” 3034 w/tracer wire, okay to cover.
 
402 Sanitary Sewer - Private
Reviewed
04/30/25
RC Kennedy
24-07375-01-Sanitary-Reviewed, 38’ of 12” 3034 with 6” c/o, with tracer wire connected to MH#1
 
402 Sanitary Sewer - Private
Reviewed
05/01/25
RC Kennedy
24-07375-01-Sanitary-Reviewed, 38’ of 12” 3034 with 6” c/o, with tracer wire connected to MH#1, Air test for Sanitary passed. RCK
 
402 Sanitary Sewer - Private
Needed
   
 
403 Storm Sewer - Private
Reviewed
03/03/25
SEKelley
30’ of 18” 3034 with tracer wire connected from existing stub to a new MH. Okay to cover. 2-20’ sticks of 8” CPE with tracer wire connected to new MH, okay to cover with pics.
 
403 Storm Sewer - Private
Reviewed
03/04/25
SEKelley
South side parking lot of Moshofsky, 100’ of 10” cpe with tracer wire connected to a MH and 2-8” by 10” wyes okay to cover.
 
403 Storm Sewer - Private
Reviewed
03/05/25
SEKelley
Pg.’s C5.01 and C.500 3-20’ sticks of 10” cpe, 10” by 8” eccentric reducer, 2-20’ sticks of 8” cpe, 1-10” by 8” wye, 32’ of 8” cpe service lateral, mainline has 6” cleanouts with tracer wire, okay to cover.
 
403 Storm Sewer - Private
Reviewed
03/06/25
SEKelley
Pgs. C5.01 and C5.00-200’ of 8” cpe with tracer wire and 6” c/o’s, pipe to serve a CB and drainage from a SWMF. Okay to cover.
 
403 Storm Sewer - Private
Reviewed
03/24/25
RC Kennedy
24-07375-01-Storm -Reviewed-Pg. C5.00-72’ of 18” CPE from Public stub to Pvt. MH to come later, with tracer wire, okay to cover
 
403 Storm Sewer - Private
Reviewed
03/25/25
RC Kennedy
24-07375-01-Reviewed-Storm-Pg. C5.00, 18” CPE grouted into SD MH-05 set today, with tracer wire, okay to cover.
 
403 Storm Sewer - Private
Reviewed
03/26/25
RC Kennedy
24-07375-01-Reviewed-Pg. C5.00 80’ of 12” CPE with tracer wire connected to SD MH 5, 3’ of 8” via 12” by 8” wye, 3-12” by 6” wye’s to pick up existing rain leaders later, 1-6” c/o on mainline. Okay to cover.
 
403 Storm Sewer - Private
Reviewed
03/27/25
RC Kennedy
24-07375-01-Reviewed-storm-67’ of 12” CPE with tracer wire, 3-12” by 6” wyes to pickup existing rain leaders, 1-6” directional c/o, may cover.
 
403 Storm Sewer - Private
Reviewed
03/28/25
RC Kennedy
Continuation of 12", 6" to LAD-02, 6" storm stubs to connect to existing downspouts, 6" end-run cleanout, 6" stubbed to LAD-01. Ok to cover. RCK
 
403 Storm Sewer - Private
Reviewed
03/31/25
RC Kennedy
24-07375-01-Storm Reviewed-pgs. C5.00 & C5.01, 8” CPE extended 3’-6’ in six areas with tracer wire picking up overflows from SWMF’s, okay to cover.
 
403 Storm Sewer - Private
Reviewed
04/01/25
RC Kennedy
24-07375-01-Storm sewer-reviewed-K & E now the contractor. Pg. C6.10, 1-20’ stick of 24” CPE connected to existing MH with tracer wire, okay to cover.
 
403 Storm Sewer - Private
Reviewed
04/02/25
RC Kennedy
24-07375-01 storm reviewed-Pg. C5.12, 80’ of 24” of CPE and 1-24” by 24” tee with tracer wire, okay to cover
 
403 Storm Sewer - Private
Reviewed
04/03/25
RC Kennedy
Review 40' of 24" CPE with tracer wire and cleanout.
 
403 Storm Sewer - Private
Reviewed
04/04/25
RC Kennedy
24-07375-01-Reviewed storm-Pg. C5.12, 80’ of 24” CPE with tracer wire, okay to cover.
 
403 Storm Sewer - Private
Reviewed
04/07/25
RC Kennedy
24-07375-01-Reviewed-Storm-Pg. C5.12 66’ of 24” CPE with tracer wire connected to an 60” MH, okay to cover.

 
403 Storm Sewer - Private
Reviewed
04/08/25
RC Kennedy
24-07375-01-Storm-Reviewed, Pg’s C5.12 & C5.13-200’ of 24” CPE with tracer wire from SD MH 11 to SD MH 04, okay to cover.
 
403 Storm Sewer - Private
Reviewed
04/10/25
RC Kennedy
2-8" inserta-tees and piping, on South side of site connected to 18". 8" runs to overflows serving rainwater treatment facilities. Ok to cover. RCK
 
403 Storm Sewer - Private
Reviewed
04/17/25
RC Kennedy
24-07375-01-Storm-Reviewed 7 downspout connections made to 4” sch 40 via fernco’s to 6” CPE.
 
403 Storm Sewer - Private
Reviewed
04/23/25
RC Kennedy
Pictures of 15" storm piping and conseal at top of barrel on storm manhole received, 4/23/25. RCK
 
403 Storm Sewer - Private
Reviewed
05/07/25
SEKelley
Pg. C5.01 71’ of 6” CPE with tracer wire connected a Gibson Basin, one c/o, okay to cover.
 
403 Storm Sewer - Private
Reviewed
05/09/25
RC Kennedy
24-07375-01-Storm-Reviewed, Pg. C5.13, 15’ of 18” CPE with tracer wire connecting to existing 18” 3034.

 
403 Storm Sewer - Private
Reviewed
05/12/25
RC Kennedy
24-07375-01-Storm-Reviewed-Pg. C5.13, 3-20’sticks of 18” CPE, 1-4” inserta tee, 6’ of 4” 3034 with tracer wire, okay to cover.
 
403 Storm Sewer - Private
Reviewed
06/18/25
RC Kennedy
24" storm with tracer wire, connected to manhole East side of practice field, page C5.00. Ok to cover. RCK
 
403 Storm Sewer - Private
Reviewed
08/08/25
RC Kennedy
SD/LAD 1-4, CB-7, installed, ok to cover. Page C5.00. RCK
 
403 Storm Sewer - Private
Reviewed
10/21/25
RC Kennedy
6" connected to MH-4 running North to 6" stub from new/existing building. Per page C5.13. RCK
 
403 Storm Sewer - Private
Reviewed
01/20/26
SEKelley
Pg. C5.12. 9’ of 15” CPE with two 15” by 8” wyes with tracer wire out of MH 10 . Pg. C5.13. 58’ of 8” 3034 with a c/o and tracer wire okay to cover.
 
403 Storm Sewer - Private
Reviewed
01/21/26
RC Kennedy
Page P2.01, 15" CPE on South side of facility transitioning to 18" running West to OF-11. RCK
 
403 Storm Sewer - Private
Reviewed
01/22/26
RC Kennedy
Continuation of 18" running West to OF-11. RCK
 
403 Storm Sewer - Private
Reviewed
01/28/26
RC Kennedy
15" heading West on Northwest side of project, connected to PVC stubbed from building interior. RCK
 
403 Storm Sewer - Private
Reviewed
02/17/26
RC Kennedy
Page C5.13, Southeast corner 8" transitioning to 4" connected to trench drain. RCK
 
403 Storm Sewer - Private
Reviewed
02/18/26
RC Kennedy
A.M. inspection, Page C5.10, 21" heading North to MH-01. RCK
 
403 Storm Sewer - Private
Reviewed
02/19/26
RC Kennedy
Page C5.10, 24" heading North to MH-01. MH-01 installed, 18" from MH-01 to outfall at retention pond installed. RCK
 
403 Storm Sewer - Private
Needed
   
 
350 Rain Drain/Foundation Drain
Reviewed
04/25/25
JRLaCasse
inspected 4" socked perf. pipe on footing for wall supporting the Storm Water Planter located on the south side of the Mo Center parking lot. Perf. pipes drain into 18" pipe south of SD MH #2 via two inserta tees.
 
350 Rain Drain/Foundation Drain
Cancelled
09/08/25
RC Kennedy
Needed underfloor. RCK
 
350 Rain Drain/Foundation Drain
Cancelled
02/02/26
RC Kennedy
Needed rough. RCK
 
350 Rain Drain/Foundation Drain
Needed
   
 
318 Under Floor Plumb
Cancelled
03/21/25
SEKelley
Cancelled by Donald Adams.
 
318 Under Floor Plumb
Reviewed
04/01/25
RC Kennedy
Grease line, 4" from kitchen above, zone 3, building B, grids M-L, HDC, grids 1-2. Ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
04/08/25
RC Kennedy
3034 Pipe replacement with SCH40 PVC, from Grid A-F and along 1.25. Test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
04/18/25
RC Kennedy
Remainder of the 3034 line replacement with SCH40 PVC and all the branches off. Grid K to A along 1.5 Am Test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
05/01/25
RC Kennedy
3034 line replacement with SCH40 PVC and all the branches off. Grid K to A along 1.5 [Connecting previously inspected sanitary listed above to existing live sewers, work done after hours, pictures received 5/1/25.] RCK
 
318 Under Floor Plumb
Reviewed
05/23/25
RC Kennedy
Chiller room, Grid lines 4.5-3.7, L-J DWV test ok. RCK
 
318 Under Floor Plumb
Reviewed
05/29/25
RC Kennedy
Parking garage piping form k-J and from 1.5 to 3.6, Sand interceptor to come. RCK
 
318 Under Floor Plumb
Reviewed
06/06/25
SEKelley
Underslab DWV from GL 4.5 to 5.7 and GL M to H. Test ok.
 
318 Under Floor Plumb
Reviewed
06/18/25
RC Kennedy
DWV, Grid J 7.5to 4.5 Chiller area, test ok. RCK
 
318 Under Floor Plumb
Reviewed
06/20/25
RC Kennedy
Underslab Sanitary and pumped waste associated with SE-3,4. Test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
06/27/25
SEKelley
Oil/water separator in parking garage area, hold down kit installed and poured in concrete. Tank vent, downstream vent, 2 cleanouts and backwater valve installed, test ok.
 
318 Under Floor Plumb
Reviewed
07/17/25
SEKelley
DWV underslab for showers and floor drains above north wall west of GL 3.1, tests ok.
 
318 Under Floor Plumb
Reviewed
07/21/25
RC Kennedy
4" main running through classroom from grid 7.5-5.5. Test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
07/23/25
RC Kennedy
Name wall underground level 1 form grad 2.5 to 1.5 and level O North system from 5.5 to 7, test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
08/01/25
RC Kennedy
All piping associated with the heating water room sump from 7.5 to 6.5 and L to K and the rest of the south main through the footing at 7.5, Test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
08/07/25
RC Kennedy
Connector underground from D-B.5 and 2- 1.75, Test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
08/08/25
RC Kennedy
North waste line main where we left off to West side of 7.5 footing into zone 4 and storm line in Zone 3 at 7 and K through 7.5 footing into zone 4, Test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
08/14/25
RC Kennedy
All connector hallway piping(6" storm line and 8" waste through the backwater valve to Outside) Grid 1-1.5 and H-B, Test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
09/08/25
RC Kennedy
Underground Waste/Vent and Storm line from grid 7.5 to under the basalt wall at 10 line and 5 feet north of the building, Test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
09/08/25
RC Kennedy
Inspection for UG Storm line in Sector A UG, Test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
09/09/25
RC Kennedy
Sauna drain, will be poured into concrete. 5PSI air test. RCK
 
318 Under Floor Plumb
Reviewed
09/10/25
RC Kennedy
The two 6" drain lines into SP 4,5 at grid 9. Zone 3 in slab fixtures, and section of Pex hose bib main in south east corner of IPF. RCK
 
318 Under Floor Plumb
Reviewed
09/11/25
RC Kennedy
Pex hose bib main in south east corner of IPF. Air test down at time of inspection, contractor to re-test and check for leaks. PEX covered without inspection. RCK
 
318 Under Floor Plumb
Reviewed
09/12/25
RC Kennedy
Pictures received, 9/12/25. 100PSI air test. RCK
 
318 Under Floor Plumb
Reviewed
09/18/25
RC Kennedy
South IPF hose bib main from Everything we already tested/Inspected on the East to grid 10 and branch lines. 10PSI air test, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
09/30/25
RC Kennedy
Entire underground north hose bib line in IPF up through the wall curbs And south East lines Extended up through wall curbs, Test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
10/15/25
RC Kennedy
16" storm line above slab just east of 10 line in yard to 5' outside building to the west, test ok, ok to cover. RCK
 
318 Under Floor Plumb
Reviewed
10/16/25
RC Kennedy
This is the North South run on the west side of the IPF of the underground hose bib mains. The continuation of the south main. This completes the IPF hose bib underground. Test ok, ok to cover. RCK
 
318 Under Floor Plumb
Needed
   
 
320 Rough Plumbing
Cancelled
03/21/25
SEKelley
Cancelled by Donald Adams.
 
320 Rough Plumbing
Reviewed
10/21/25
RC Kennedy
Water main re-route at parking garage entrance, 4" stainless Victaulic. RCK
 
320 Rough Plumbing
Reviewed
11/12/25
RC Kennedy
Bottle Filler Waste/Vent and Water piping in the Existing HDC , running test on DWV, copper H20 connected to existing and under working pressure. RCK
 
320 Rough Plumbing
Info Only
12/11/25
SEKelley
Spoke with Bryan about using a large funnel on storm drain piping outside the building to meet seismic requirements. Also spoke about having 2 floor sinks covered but accessible through removable panel in floor of cabinet.
 
320 Rough Plumbing
Reviewed
12/31/25
RC Kennedy
4" Storm drain/Overflow from level 0 connector south connection up through level 4 slab Vent in the North Toilet Carrier cubby of Level O C up and out of chase to overhead south where accessible. Test ok on rain drain/overflow to level 4, supports/seismic and mid story guides in mechanical shaft to come. RCK
 
320 Rough Plumbing
Reviewed
01/15/26
RC Kennedy
Rain drains for Level 1 B roof from 10" through level 0 in A, Test ok. RCK
 
320 Rough Plumbing
Reviewed
01/20/26
SEKelley
South East 3" rain drain line, sector B from the roof drain to the level 0 cleanout. Test ok.
 
320 Rough Plumbing
Reviewed
01/22/26
RC Kennedy
All Level 0 connector Waste and Vent ,test ok. RCK
 
320 Rough Plumbing
Reviewed
01/23/26
RC Kennedy
All connector Domestic Water, DHW/DCW 100PSI air test. RCK
 
320 Rough Plumbing
Reviewed
02/02/26
RC Kennedy
Level 4 C rain drain and overflow piping from last test height to roof drains, test ok. Section C level 0 domestic water mains [ hot/cold/return] seismic installed per plan. RCK
 
320 Rough Plumbing
Reviewed
02/12/26
RC Kennedy
All 1 B shower drains in locker room area, linear drains trimmed to size, installed, and tested per manufactures directions. Test ok, ok to cover. RCK
 
320 Rough Plumbing
Reviewed
02/18/26
RC Kennedy
Main ice & water room 016, ok to cover. Laundry room 012, ok to cover. Level 4, room 426 rain drain & overflow drain piping test ok. RCK
 
320 Rough Plumbing
Reviewed
02/19/26
RC Kennedy
Page P3.100.B, 8" rain drain being re-routed to new location. Air test ok, connection to existing piping to come. RCK
 
320 Rough Plumbing
Reviewed
02/25/26
RC Kennedy
Waste and Vent over the classroom. Just the 6" and 4" at grid 6 from floor sinks to North of K line, test ok. RCK
 
320 Rough Plumbing
Reviewed
03/09/26
RC Kennedy
Level 0 pool room waste and Vent, Test ok. RCK
 
320 Rough Plumbing
Reviewed
03/16/26
RC Kennedy
0 B overhead rough in in chiller room and south to bathroom to including bathroom wall work. Test ok, RCK
 
320 Rough Plumbing
Reviewed
03/20/26
SEKelley
4C - overhead hot, cold and return domestic water piping, tests ok. Level 0 A TLT, 039, 040 and 2" drain from restroom 030 to sink on level 1 and venting above, tests ok.
 
320 Rough Plumbing
Reviewed
03/25/26
RC Kennedy
Level O Sinks waste and vent on Northwest side, piping in-ceiling for level 1 waste and vent, Lanning's office waste/vent and H20. Test ok. RCK
 
320 Rough Plumbing
Reviewed
03/31/26
RC Kennedy
Ok to cover in Lannings office, Test complete on previous inspection, per contractor piping insulated and labels installed above ceiling. RCK
 
320 Rough Plumbing
Reviewed
04/02/26
RC Kennedy
1 B rain drain/ Overflows, test ok. In-wall and above ceiling DWV/H20 not on test, reschedule when ready. RCK
 
320 Rough Plumbing
Reviewed
04/03/26
RC Kennedy
Section 1B , second floor waste and vent, air test on domestic hot/cold. RCK
 
320 Rough Plumbing
Cancelled
04/06/26
RC Kennedy
Not ready per contractor. RCK
 
320 Rough Plumbing
Reviewed
04/09/26
RC Kennedy
1B domestic water test with 90lb hydro to follow up from previous inspection, test ok faulting 3" fittings replaced. 0B catacomb seismic, seismic installed per seismic drawings/details. RCK
 
320 Rough Plumbing
Reviewed
04/14/26
RC Kennedy
1 B pipe seismic, From connector to the East, Rain drains and overflow piping, domestic hot/cold/return piping racks, 4" rain drain running North on connector line seismic to come. RCK
 
320 Rough Plumbing
Reviewed
04/17/26
RC Kennedy
1A Overflow pipe from Last sector A overflow drain to outside the building on the north side of 1A, test ok, RCK
 
320 Rough Plumbing
Reviewed
04/24/26
RC Kennedy
Ok to cover for level 0 Drying Room, Rest 030,Cust 040, Rest 039, Med 035, Nutrition 034, Wood 041B, ICE 037 and Seismic in these locations, insulation installed, piping labeled, ok to cover. RCK
 
320 Rough Plumbing
Reviewed
04/30/26
RC Kennedy
All remainder of 1B plumbing water mains branches and wall work. Also all 1A mains to the shut off valves at the walls they serve. Also remainder of all Level 0 B/A domestic water minus piping in water entry room and heat plant Waste and Vent on 1B from last inspection around grid 3.5 to grid 4.7, DWV tested with 10' of head, water on 90PSI hydro test. RCK
 
320 Rough Plumbing
Cancelled
05/07/26
IVRUser
 
 
320 Rough Plumbing
Reviewed
05/08/26
RC Kennedy
Level 1 Sector B East of grid 2.5 OK to cover. 1C Plumbing mains through shaft tied into already tested 4C overhead and pipes into crawl of level 4 bathroom, test ok, ok to insulate. RC
 
320 Rough Plumbing
Reviewed
05/20/26
RC Kennedy
Overhead Domestic Water at 1C: island piping, air test ok 95PSI. RCK
 
320 Rough Plumbing
Reviewed
05/21/26
RC Kennedy
Grease waste line from tank to fixtures on 1 and grease waste line and waste line from south east corner of 1B to 2M of North connector, test ok, ok to cover. RCK
 
320 Rough Plumbing
Reviewed
05/27/26
RC Kennedy
All 1C overhead waste a vent from north 2M tie in location through vents on 4C. Domestic Water wall work at Pool showers 142D and TLT RM 149 on Level 1A, Test ok, ok to cover. RCK
 
320 Rough Plumbing
Reviewed
05/29/26
RC Kennedy
3" Vent from cooling tower yard Hub drain through the roof of 2M
All water entry room venting up through the roof, 6" waste from floor sinks serving air handlers. RCK
 
320 Rough Plumbing
Reviewed
06/02/26
SEKelley
1A DWV left besides far west 6" overhead line which includes all piping to all 2M floor sinks, tests ok. DWV in water heating room on level 0, tests ok.
 
320 Rough Plumbing
Reviewed
06/10/26
RC Kennedy
Last Section of Waste and Vent for 1A, test ok, added hose bib tested with 100PSI air pressure. RCK
 
320 Rough Plumbing
Reviewed
06/16/26
RC Kennedy
Cover Inspection from where we left off on level 1 to grid 6 , Completion of Level 1A and 0A seismic. Rough inspection complete, in-wall piping insulated, ok to cover. RCK
 
320 Rough Plumbing
Reviewed
07/08/26
RC Kennedy
4C bathroom domestic waters, underfloor and walls, air test ok. DWV test to come. RCK
 
320 Rough Plumbing
Reviewed
07/09/26
RC Kennedy
4C waste and vent piping for bathroom, underfloor and venting. Test ok, ok to cover. 1-A corridor and adjacent rooms, ok to cover. 6" vent, 4th floor adjacent to South stairs. Ok to cover. RCK
 
320 Rough Plumbing
Reviewed
07/10/26
RC Kennedy
Spoke to Donald Adams, inspection for 1-A corridor and adjacent rooms was covered at yesterdays inspection. Two hangers have been re-attached, and pipe labeling is complete, Ok to cover. RCK
 
320 Rough Plumbing
Reviewed
07/14/26
RC Kennedy
4C North East corner kitchen wall water inspection, air test ok, ok to cover. RCK
 
320 Rough Plumbing
Reviewed
08/04/26
RC Kennedy
2M-A water line to all hydrants/hose bibs/primers 2M-A venting, test ok, contractor to provide vacuum breakers on all hose bibbs and support on 3" vent on Northeast side of mechanical room. RCK
 
320 Rough Plumbing
Reviewed
08/17/26
RC Kennedy
Domestic water in heat plant, RP device in heat plant, Main domestic RP, RP in chiller room. RCK
 
320 Rough Plumbing
Reviewed
08/28/26
RC Kennedy
2M sector A rain drains and piping through AV room and out into west courtyard, test ok. RCK
 
320 Rough Plumbing
Reviewed
09/15/26
RC Kennedy
2M sector A overflow piping to all drains and to exterior of building, test ok. RCK
 
320 Rough Plumbing
Reviewed
10/23/26
RC Kennedy
Nutrition Wall 1B rough in pipe pressure test. Test ok. Ok to cover. Lannings office underfloor insulation installed with heat trace, Ok to cover. RCK
 
320 Rough Plumbing
Reviewed
11/19/26
RC Kennedy
Level 0 wood shop air line, Pool room waste/vent and cold water for hand wash sink and emergency shower. Test ok. RCK
 
320 Rough Plumbing
Needed
   
 
325 Water Service
Reviewed
07/17/25
SEKelley
4" copper stubbed through north wall, link seal installed, air test ok.
 
325 Water Service
Reviewed
03/31/26
RC Kennedy
4" copper water main, Water main tie in from meter to into water entry room, all fittings brazed, air test ok. RCK
 
325 Water Service
Needed
   
 
330 Shower Liner
Reviewed
04/22/26
RC Kennedy
Shower liner test in head coaches office, test ok, ok to cover. RCK
 
330 Shower Liner
Reviewed
08/18/26
RC Kennedy
1B shower waterproofing flood test, 5-showers on East end, test ok. RCK
 
330 Shower Liner
Cancelled
09/14/26
IVRUser
 
 
330 Shower Liner
Reviewed
09/16/26
RC Kennedy
West shower stall flood tests, three shower stalls, test ok. RCK
 
330 Shower Liner
Needed
   
 
375 Grease Interceptor
Needed
   
 
376 Oil/Water Separator
Needed
  
For sand interceptor.
 
335 Backflow Device
Needed
   
 
399 Final Plumbing
Reviewed
06/05/26
RC Kennedy
Final for Dan Lanning's office only, all fixtures complete and ok for use, shower temps ok, systems [waste, vent, hot, cold] are connected to existing on existing side of building. All systems have been tested and test equipment removed. Office is ok to occupy. RCK
 
399 Final Plumbing
Needed
   
Public Works
Active
01/17/25
11/20/27
  
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
725 Stormwater Mgmt Facility
Reviewed
03/31/25
JRLaCasse
6-concrete overflow basins set in the flow through planter shown on C5.01 with connections to the 8" CPE
 
725 Stormwater Mgmt Facility
Reviewed
04/25/25
JRLaCasse
Subgrade for planter on south side of Mo Center parking okay, may add 6" of drain rock and perf. and schedule inspection
 
725 Stormwater Mgmt Facility
Cancelled
04/28/25
GEReynolds
Cancelled per Brent Mobley.
 
725 Stormwater Mgmt Facility
Reviewed
04/29/25
GEReynolds
Rock layer and 6" perf pipe ok, ok to add next layer of rock.
 
725 Stormwater Mgmt Facility
Reviewed
05/01/25
GEReynolds
Second layer of rock okay the length of the facility.
 
725 Stormwater Mgmt Facility
Needed
   
 
735 Stormwater Facility Planting
Needed
   
 
400 Sanitary Sewer - Public
Reviewed
04/09/25
GEReynolds
Connection made to manhole with boot type seal, work still to be done inside manhole. 13' of 12" 3034 pipe installed on private side.
 
401 Storm Sewer - Public
Reviewed
01/20/26
JRLaCasse
Pg. C5.12. 12' of 24" 3034 with tracer wire into pvt. MH 10. Okay to cover.
 
750 R/W Excavation
Needed
   
 
400 Sanitary Sewer - Public
Reviewed
04/18/25
JRLaCasse
Air tested from Public MH 46611 to private MH S MH-02. Passed testing. Poor existing channeling in the Public MH is causing debris to build up and constrict flow. K and E's position is this is existing and they should not be required to fix it. Awaiting decisions from management and Public Works Engineering as to who will pay to rework the channels in this MH 46611.
 
401 Storm Sewer - Public
Needed
   
 
400 Sanitary Sewer - Public
Reviewed
04/24/25
JRLaCasse
More channeling of Public MH 46611. Channeling of this MH complete. Assisted with Inspection by Bob Pappalardo
 
400 Sanitary Sewer - Public
Needed
   
 
765 Sidewalk
Needed
   
 
775 Drive/Curb Cut
Needed
   
 
799 Final Public Works
Needed
   
To request an inspection go to https://pdd.eugene-or.gov/BuildingPermits/InspectionLogin.
For more information call 541-682-5283.
FEES
Fees
Total Due
Amount Paid
Paid Date
Amount Due
Building
$97,329.88
$37,804.46
 
$59,525.42
Building Plan Check per Applicant Value
$2,403.13
$2,403.13
01/16/25
$0.00
Supplemental Plan Review, Bldg
$57.40
$57.40
01/30/25
$0.00
Supplemental Plan Review, Bldg
$114.80
$114.80
02/06/25
$0.00
Supplemental Plan Review, Bldg
$172.20
$172.20
04/22/25
$0.00
Supplemental Plan Review, Bldg
$172.20
$172.20
04/22/25
$0.00
Supplemental Plan Review, Bldg
$114.80
$0.00
 
$114.80
Supplemental Plan Review, Bldg
$861.00
$0.00
 
$861.00
Supplemental Plan Review, Bldg
$57.40
$0.00
 
$57.40
Supplemental Plan Review, Bldg
$803.60
$0.00
 
$803.60
Supplemental Plan Review, Bldg
$287.00
$0.00
 
$287.00
Supplemental Plan Review, Bldg
$1,262.80
$0.00
 
$1,262.80
Supplemental Plan Review, Bldg
$287.00
$0.00
 
$287.00
Supplemental Plan Review, Bldg
$631.40
$0.00
 
$631.40
Supplemental Plan Review, Bldg
$57.40
$0.00
 
$57.40
Supplemental Plan Review, Bldg
$344.40
$0.00
 
$344.40
Supplemental Plan Review, Bldg
$114.80
$0.00
 
$114.80
Supplemental Plan Check, Str. Eng.
$114.80
$114.80
03/21/25
$0.00
Supplemental Plan Check, Str. Eng.
$28.70
$28.70
04/22/25
$0.00
Supplemental Plan Check, Str. Eng.
$57.40
$57.40
04/22/25
$0.00
Supplemental Plan Check, Str. Eng.
$57.40
$0.00
 
$57.40
Supplemental Plan Check, Str. Eng.
$114.80
$0.00
 
$114.80
Supplemental Plan Check, Str. Eng.
$57.40
$0.00
 
$57.40
Supplemental Plan Check, Str. Eng.
$114.80
$0.00
 
$114.80
Supplemental Plan Check, Str. Eng.
$114.80
$0.00
 
$114.80
Supplemental Plan Check, Str. Eng.
$57.40
$0.00
 
$57.40
Supplemental Plan Check, Str. Eng.
$28.70
$0.00
 
$28.70
Fire/Life Safety Plan Check
$1,478.85
$1,478.85
01/16/25
$0.00
Flood Hazard Zone Plan Check
$184.86
$184.86
01/16/25
$0.00
Seismic Hazard Fee
$61.00
$61.00
01/16/25
$0.00
Phased Permit Base Fee
$350.00
$350.00
01/16/25
$0.00
Phased Permit Coordination Fee
$369.71
$369.71
01/16/25
$0.00
Fire Systems Plan Check Fee - Alarms
$1,344.67
$0.00
 
$1,344.67
Fire Systems Plan Check Fee - Sprinklers
$4,254.85
$0.00
 
$4,254.85
Fire Systems Plan Check Fee - Other
$416.08
$0.00
 
$416.08
Deferred Submittal Plan Check
$4,290.82
$4,290.82
03/21/25
$0.00
Deferred Submittal Plan Check
$1,084.48
$0.00
 
$1,084.48
Deferred Submittal Plan Check
$233.92
$0.00
 
$233.92
Deferred Submittal Plan Check
$2,429.62
$2,429.62
06/15/26
$0.00
Deferred Submittal Plan Check
$954.76
$954.76
06/15/26
$0.00
Deferred Submittal Plan Check
$14,056.48
$14,056.48
06/15/26
$0.00
Deferred Submittal Plan Check
$449.98
$0.00
 
$449.98
Deferred Submittal Plan Check
$255.52
$0.00
 
$255.52
Deferred Submittal Plan Check
$283.60
$0.00
 
$283.60
Deferred Submittal Plan Check
$449.98
$0.00
 
$449.98
Deferred Submittal Plan Check
$3,340.48
$3,340.48
06/15/26
$0.00
Deferred Submittal Plan Check
$867.34
$0.00
 
$867.34
Deferred Submittal Plan Check
$229.60
$0.00
 
$229.60
Deferred Submittal Plan Check
$414.73
$0.00
 
$414.73
Deferred Submittal Plan Check
$229.60
$0.00
 
$229.60
Deferred Submittal Plan Check
$229.60
$0.00
 
$229.60
Deferred Submittal Plan Check
$229.60
$0.00
 
$229.60
Deferred Submittal Plan Check
$1,718.98
$0.00
 
$1,718.98
Deferred Submittal Plan Check
$527.53
$0.00
 
$527.53
Deferred Submittal Plan Check
$5,170.66
$0.00
 
$5,170.66
Deferred Submittal Plan Check
$730.57
$0.00
 
$730.57
Deferred Submittal Plan Check
$323.08
$0.00
 
$323.08
Deferred Submittal Plan Check
$229.60
$0.00
 
$229.60
Deferred Submittal Plan Check
$1,221.25
$0.00
 
$1,221.25
Deferred Submittal Plan Check
$229.60
$0.00
 
$229.60
Deferred Submittal Plan Check
$5,666.98
$0.00
 
$5,666.98
Deferred Submittal Plan Check
$229.60
$0.00
 
$229.60
Deferred Submittal Plan Check
$229.60
$0.00
 
$229.60
Deferred Submittal Plan Check
$858.88
$0.00
 
$858.88
Deferred Submittal Plan Check
$229.60
$0.00
 
$229.60
Deferred Submittal Plan Check
$661.48
$0.00
 
$661.48
Deferred Submittal Plan Check
$3,692.98
$0.00
 
$3,692.98
Deferred Submittal Plan Check
$647.38
$0.00
 
$647.38
Deferred Submittal Plan Check
$872.98
$0.00
 
$872.98
Deferred Submittal Plan Check
$991.42
$0.00
 
$991.42
Deferred Submittal Plan Check
$229.60
$0.00
 
$229.60
Deferred Submittal Plan Check
$229.60
$0.00
 
$229.60
Deferred Submittal Plan Check
$229.60
$0.00
 
$229.60
Deferred Submittal Plan Check
$1,436.98
$0.00
 
$1,436.98
Deferred Submittal Plan Check
$1,092.94
$0.00
 
$1,092.94
Deferred Submittal Plan Check
$309.52
$0.00
 
$309.52
Deferred Submittal Plan Check
$431.65
$0.00
 
$431.65
Deferred Submittal Plan Check
$4,397.98
$0.00
 
$4,397.98
Building Permit Fee per Bldg Div Value
$3,697.12
$3,697.12
01/16/25
$0.00
Emergency Generator
$346.00
$346.00
06/12/26
$0.00
Fire System Permit Fee - Alarms
$2,068.72
$0.00
 
$2,068.72
Fire System Permit Fee - Sprinklers
$6,545.92
$0.00
 
$6,545.92
Fire System Permit Fee - Other
$640.12
$0.00
 
$640.12
Supplemental Plan Review, Fire
$114.80
$114.80
01/16/25
$0.00
Supplemental Plan Review, Fire
$114.80
$0.00
 
$114.80
Supplemental Plan Review, Fire
$57.40
$0.00
 
$57.40
Zoning Plan Check
$1,663.70
$1,663.70
01/16/25
$0.00
Special Development Standards Review
$57.40
$57.40
01/16/25
$0.00
Supplemental Plan Review, Zoning
$287.00
$287.00
04/22/25
$0.00
Supplemental Plan Review, Zoning
$57.40
$0.00
 
$57.40
State Surcharge, Structural
$456.41
$456.41
01/16/25
$0.00
State Surcharge, Structural
$41.52
$41.52
06/12/26
$0.00
State Surcharge, Structural
$1,110.57
$0.00
 
$1,110.57
Building Technology Admin Fee, Local
$205.32
$205.32
01/16/25
$0.00
Building Admin Fee, State
$103.21
$103.21
01/16/25
$0.00
Building Plan Check Admin
$194.77
$194.77
01/16/25
$0.00
Building Plan Check Admin
$0.00
$0.00
 
$0.00
Electrical
$2,063.32
$1,776.32
 
$287.00
Supplemental Plan Check, Electrical
$114.80
$114.80
06/12/26
$0.00
Supplemental Plan Check, Electrical
$114.80
$114.80
06/12/26
$0.00
Supplemental Plan Check, Electrical
$229.60
$229.60
06/12/26
$0.00
Supplemental Plan Check, Electrical
$172.20
$0.00
 
$172.20
Supplemental Plan Check, Electrical
$114.80
$0.00
 
$114.80
Temp, 200 amps or less
$669.00
$669.00
03/13/25
$0.00
Temp, 201 to 400 amps
$133.90
$133.90
03/13/25
$0.00
Temp, 601 to 1000 amps
$373.10
$373.10
03/13/25
$0.00
State Surcharge, Electrical
$141.12
$141.12
03/13/25
$0.00
Electric Plan Check Admin
$0.00
$0.00
 
$0.00
Fire
$1,299.90
$730.35
 
$569.55
Fire Plan Check
$554.55
$554.55
01/16/25
$0.00
Supplemental Plan Review, Fire
$114.80
$114.80
01/30/25
$0.00
Supplemental Plan Review, Fire
$114.80
$0.00
 
$114.80
Private Water/Hydrant Systems (2 insps)
$454.75
$0.00
 
$454.75
Fire Technology Admin Fee, Local
$11.09
$11.09
01/16/25
$0.00
Fire Plan Check Admin
$49.91
$49.91
01/16/25
$0.00
Plumbing
$168.66
$168.66
 
$0.00
Plumbing Plan Check
$36.22
$36.22
01/16/25
$0.00
Plumbing Fixtures
$26.40
$26.40
01/16/25
$0.00
Minimum Permit Fee
$77.10
$77.10
01/16/25
$0.00
State Surcharge, Plumbing
$13.57
$13.57
01/16/25
$0.00
Plumbing Technology Admin Fee, Local
$2.79
$2.79
01/16/25
$0.00
Plumbing Admin Fee, State
$9.32
$9.32
01/16/25
$0.00
Plumbing Plan Check Admin
$3.26
$3.26
01/16/25
$0.00
Public Works
$47,329.77
$559.67
 
$46,770.10
Supplemental Plan Review, Public Works
$1,492.40
$0.00
 
$1,492.40
Supplemental Plan Review, Public Works
$3,042.20
$0.00
 
$3,042.20
Revocable Permit (w/ Recorded Agree)
$1,465.50
$0.00
 
$1,465.50
R-O-W Excavation (w/o pavement cuts)
$225.00
$225.00
03/21/25
$0.00
R-O-W Excavation (w/o pavement cuts)
$450.00
$0.00
 
$450.00
Temp R-O-W Use, Monthly
$28,980.00
$0.00
 
$28,980.00
Temp R-O-W Use, Long-Term
$11,340.00
$0.00
 
$11,340.00
Floodplain Dev, With Buildings
$301.50
$301.50
01/16/25
$0.00
PW Technology Admin Fee, Local
$6.03
$6.03
01/16/25
$0.00
PW Plan Check Admin
$27.14
$27.14
01/16/25
$0.00
PW Plan Check Admin
$0.00
$0.00
 
$0.00
Total All Fees
$148,191.53
$41,039.46
 
$107,152.07
Page 2 of 2
Date: 11/28/2026