| | | | | | | | | | | | | | | | | | | | | | Building and Permit Services |
| | | | Permit Number: 24-05904-01 |
| | | | | | | | | | | | | | | | | | | | | | | Address: 90201 HWY 99N | Project Description: New metal prefabricated structure. | Application Type: | Commercial | Status: | Issued | Scope of Work: | New Commercial Bldg | Zoning: | Heavy Industrial District | Map: | 17-04-04-00 | Tax Lot: | 02105 | Subdivision: | | Addition: | | Lot: | | Block: | | Date Received: | 08/23/24 | # Bedrooms: | 0 | Commitment Date: | 10/19/24 | # Dwelling Units: | 0 | Ready to issue as of: | 02/11/25 | In Flood Plain: | | Project Coordinator: | Erik Swinney | Phone: | 541-682-5372 | | | | Sign Standards: | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Construction Type Comments: |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | unlimited area per OSSC 503.1.1 |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | mezzanines/equipment platforms/catwalks - 62300 sf |
| | | | | | | | | | | | | Floor | Existing Floor Area | New Floor Area | Total Area |
| | | | | Existing floor area may not be shown. |
| | | |
| | |
| | | | | | | | | | | | | | | | | | | | | Type | Contractor | Building | WILDISH CONSTRUCTION | Electric | ELECTRICAL PROFESSIONAL SERVICES | Plumbing | WILDISH CONSTRUCTION | Primary Contact | POWELL BILL |
| | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Plan review data displayed is the most current for each review. The applicant will receive notification of all issues needing additional information after all reviews on a project have been completed. Supplemental Information (SI) can be submitted prior to or after permit issuance. If you have any questions regarding your project, contact at or send email to @ci.eugene.or.us. Also note that some reviews (i.e., fire alarms, fire sprinklers) are deferred submittals and will be reviewed after original permit(s) have been issued. |
| | | | | | | | | | | | | | | | | Review has not been started |
| | | | | | | | | | | | | | | | | Review for individual review has been completed, waiting for a response |
| | | | | | | All reviews for project have been completed, waiting for a response |
| | | | | | | | | | | | | | | | | | | | | | Information only, review not approved |
| | | | | | | | | | | Project cannot be approved as submitted |
| | | | For information regarding the review of your project or the commitment date for completion of review, please contact your project coordinator, , at @ci.eugene.or.us or by phone at . |
| | | | | | | | | Plan Review | Status | Review Completion Date | Project Coordination, Application Submittal | External Wait Time | 10/18/24 | Pre Issuance Coord, Pre Issuance SI | Approved | 01/14/25 | Post Issuance Coord, Post Issuance SI | Approved | 11/03/26 | Deferred Coordination, Deferred Submittal | Approved | 02/19/26 | Building, Application Submittal | Waiting for info | 09/27/24 | Building, Pre Issuance SI | Approved | 12/30/24 | Building, Post Issuance SI | Approved | 10/01/26 | Building, Deferred Submittal | Waiting for info | 06/06/25 | Structural, Application Submittal | Waiting for info | 09/24/24 | Structural, Pre Issuance SI | Approved | 12/18/24 | Structural, Post Issuance SI | Approved | 11/03/26 | Structural, Deferred Submittal | Information | 05/27/25 | Mechanical, Application Submittal | Information | 09/27/24 | Mechanical, Post Issuance SI | Waiting for info | 11/03/26 | Mechanical, Deferred Submittal | Information | 06/04/25 | Electrical, Post Issuance SI | Approved | 05/13/25 | Electrical, Deferred Submittal | Approved | 02/10/25 | Zoning, Application Submittal | Waiting for info | 10/11/24 | Zoning, Pre Issuance SI | Approved | 01/08/25 | Zoning, Post Issuance SI | Approved | 03/18/25 | Public Works, Application Submittal | Waiting for info | 10/11/24 | Public Works, Pre Issuance SI | Approved | 11/25/24 | Public Works, Post Issuance SI | Approved | 05/28/26 | Public Works, Deferred Submittal | Waiting for info | 06/04/25 | Stormwater Standards, Application Submittal | Waiting for info | 10/11/24 | Stormwater Standards, Pre Issuance SI | Approved | 11/25/24 | Stormwater Standards, Post Issuance SI | Approved | 03/03/25 | SDC, Application Submittal | Waiting for info | 10/11/24 | SDC, Pre Issuance SI | Approved | 11/25/24 | SDC, Post Issuance SI | Approved | 03/03/25 | SDC, Deferred Submittal | Waiting for info | 06/04/25 | Fire Marshal, Application Submittal | Waiting for info | 10/16/24 | Fire Marshal, Pre Issuance SI | Approved | 11/07/24 | Fire Marshal, Deferred Submittal | Approved | 02/18/25 | Erosion Inspection, Application Submittal | Approved | 01/10/25 | Fire Sprinkler Plans, Deferred Submittal | Approved | 05/15/25 | Water Main/Hydrant, Deferred Submittal | Approved | 02/19/26 |
| | |
| | | | | | | | | | | | | | PERMITS AND INSPECTIONS | Permit Type | Status | | Issued Date | Expiration Date | Completion Date | | Building | Active | 01/10/25 | 11/14/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 103 Footing | Reviewed | 04/11/25 | RZSteiner | See approved plans for highlighted locations. | | | 103 Footing | Reviewed | 04/25/25 | RZSteiner | See highlighted plans for location. | | | 103 Footing | Reviewed | 05/19/25 | RZSteiner | See approved plans for highlighted locations. | | | 103 Footing | Reviewed | 06/18/25 | RZSteiner | See approved plans for highlighted locations. | | | 103 Footing | Reviewed | 07/14/25 | RZSteiner | See approved plans in Ryans office for highlighted location. | | | 103 Footing | Reviewed | 07/18/25 | RZSteiner | See approved plans for highlighted locations. | | | 103 Footing | Reviewed | 07/24/25 | RZSteiner | See approved plans for highlighted locations. | | | 103 Footing | Reviewed | 08/26/25 | RZSteiner | BLDG B See plans for highlighted location. | | | 103 Footing | Reviewed | 09/04/25 | RZSteiner | SOG 14-16 and D-NAJ | | | 103 Footing | Cancelled | 09/15/25 | RZSteiner | | | | 103 Footing | Reviewed | 09/29/25 | AEParrish | Footings from line 14 to sub grid N33, and line NA D to NA Q. Highlighted on plans by AEP. | | | 103 Footing | Reviewed | 10/17/25 | RZSteiner | Footings A-D and 1-4 | | | 103 Footing | Reviewed | 11/03/25 | RZSteiner | See approved plans for highlighted locations of footings. | | | 103 Footing | Reviewed | 12/10/25 | RZSteiner | Bldg. A pending SPI | | | 103 Footing | Cancelled | 12/29/25 | RZSteiner | | | | 103 Footing | Reviewed | 01/15/26 | AEParrish | See approved plans for highlighted locations of footings. Sheet S2.3 grid lines P1 - P8, PQ -PJ, dated 1/15/26 AEP, ok pending SPI. | | | 103 Footing | Reviewed | 02/05/26 | RZSteiner | Column foundations sheet 2.3 for location. | | | 103 Footing | Denied | 02/11/26 | RZSteiner | Submit SI to C.O.E. for log ramp footing and wall. Approximate location sheet 2.3 PE-PF and P3-P8. OSSC 107.4 | | | 103 Footing | Reviewed | 03/03/26 | AEParrish | South ramp footing ok pending SPI. North ramp footing inspected on 1/15/26 by AEP SI sheets D 36-2401074. Footings on grid lines PJ - PQ and P10 - P15 ( High lighted on plans dated 3/3/26 ). | | | 103 Footing | Cancelled | 03/18/26 | RZSteiner | | | | 103 Footing | Needed | | | | | | 108 Foundation | Reviewed | 05/19/25 | RZSteiner | | | | 108 Foundation | Reviewed | 06/05/25 | RZSteiner | SOG Line 28-37 A to B- Pending SPI | | | 108 Foundation | Reviewed | 06/09/25 | RZSteiner | SOG line 28-37 and A-C | | | 108 Foundation | Reviewed | 06/13/25 | RZSteiner | SOG line 28-45 B.5-E | | | 108 Foundation | Reviewed | 06/18/25 | RZSteiner | SOG 28-45 line and E.7-J | | | 108 Foundation | Reviewed | 06/25/25 | RZSteiner | SOG line 31-45 PJJ-PDD and Line 40-45 =B-B.5 | | | 108 Foundation | Reviewed | 07/02/25 | RZSteiner | SOG 28-31 J-S and 31-45 PJJ-S | | | 108 Foundation | Reviewed | 07/14/25 | RZSteiner | SOG A-PH and 19-28 | | | 108 Foundation | Reviewed | 07/17/25 | RZSteiner | SOG around S.E. restrooms. | | | 108 Foundation | Reviewed | 08/01/25 | AEParrish | SOG for sorter building, first section S-AK & 42-36, and second section AK-BC & 42-36. | | | 108 Foundation | Reviewed | 08/12/25 | RZSteiner | SOG S. of 16 line and approx 80' west. | | | 108 Foundation | Reviewed | 08/18/25 | RZSteiner | SOG | | | 108 Foundation | Reviewed | 08/25/25 | RZSteiner | Footings on 13-14 line N-X | | | 108 Foundation | Reviewed | 09/02/25 | RZSteiner | SOG 16-28 and NZ-NAJ | | | 108 Foundation | Reviewed | 09/10/25 | RZSteiner | SOG 14-16 and NAK-X | | | 108 Foundation | Reviewed | 09/15/25 | RZSteiner | SOG 16-28 and NAJ-NAQ. SOG N51-16 and NAQ-X | | | 108 Foundation | Reviewed | 09/22/25 | RZSteiner | SOG NAQ-X and N21-28 | | | 108 Foundation | Reviewed | 10/06/25 | RZSteiner | SOG rebar for building B | | | 108 Foundation | Reviewed | 11/17/25 | RZSteiner | SOG D-Q and 14-N39 | | | 108 Foundation | Reviewed | 12/01/25 | RZSteiner | SOG at 1-N27 and P-NAA | | | 108 Foundation | Reviewed | 12/09/25 | RZSteiner | SOG | | | 108 Foundation | Reviewed | 12/16/25 | RZSteiner | SOG line 1-N27 and D-NAA | | | 108 Foundation | Reviewed | 12/22/25 | RZSteiner | SOG N32-N27 and P-NAA | | | 108 Foundation | Reviewed | 12/29/25 | RZSteiner | SOG for building A | | | 108 Foundation | Reviewed | 03/03/26 | AEParrish | North side ramp walls (infeed ramp) rebar inspection ok pending SPI. Plans for ramp on approved SI, sheets D 36-241074, 1&2. | | | 108 Foundation | Reviewed | 03/18/26 | RZSteiner | Column foundations P11-P16 and PJ-PQ | | | 108 Foundation | Reviewed | 04/10/26 | RZSteiner | 2nd ramp wall pending SPI | | | 108 Foundation | Cancelled | 04/15/26 | IVRUser | | | | 108 Foundation | Reviewed | 04/16/26 | RZSteiner | Ext. SOG at Log ramp. | | | 108 Foundation | Reviewed | 04/22/26 | RZSteiner | Ext. SOG E. side | | | 108 Foundation | Reviewed | 10/07/26 | RZSteiner | N. log ramp slab | | | 108 Foundation | Needed | | | | | | 118 Framing | Reviewed | 10/30/26 | RZSteiner | Break room. Ned permit for HVAC | | | 118 Framing | Denied | 11/19/26 | RZSteiner | Sumit SI for restrooms/breakroom and mechanical DS-9 | | | 118 Framing | Needed | | | | | | 146 Fire Sprinklers | Reviewed | 07/16/26 | KAHaggas | Rough Sprinkler Inspection for Bldgs E1, E2, G: overhead systems only; piping, supports, bracing, locations ok. Still need hydro tests. See onsite plans showing areas inspected (green). | | | 146 Fire Sprinklers | Needed | | | | | | 147 Alarm Systems | Needed | | | | | | 153 Water/Hydrant System | Reviewed | 03/12/26 | ATBrushett | Underground inspection complete portion of pipe inspected marked on the plans. Need thrust blocks and hydrant installed. | | | 153 Water/Hydrant System | Reviewed | 03/13/26 | KAHaggas | Partial underground fire line inspection: depth, bedding, restraints ok, ok to cover as marked on site plans. | | | 153 Water/Hydrant System | Reviewed | 03/16/26 | KAHaggas | Pics provided, ok to cover and continue. | | | 153 Water/Hydrant System | Reviewed | 03/17/26 | KAHaggas | Underground Fire Line from previously installed ductile heading west (see job plans), depth, bedding, restraints ok, ok to cover. | | | 153 Water/Hydrant System | Reviewed | 03/19/26 | KAHaggas | Additional fire line installed, ok to cover, see on site plans. | | | 153 Water/Hydrant System | Reviewed | 03/19/26 | ESPhillips-Meadow | Several sections of 10" underground line verified with multiple thrust blocks. Marked on plans. | | | 153 Water/Hydrant System | Cancelled | 03/20/26 | ESPhillips-Meadow | | | | 153 Water/Hydrant System | Reviewed | 03/23/26 | ESPhillips-Meadow | underground fire line inspection - see notes on drawing from site inspection | | | 153 Water/Hydrant System | Reviewed | 03/24/26 | ESPhillips-Meadow | 80 additional feet of 8" and 10" fire line. Ok to cover. | | | 153 Water/Hydrant System | Reviewed | 03/31/26 | KAHaggas | Underground fire line and thrust blocks inspected, depth, bedding, joints ok, ok to cover; see on site plans. | | | 153 Water/Hydrant System | Reviewed | 04/08/26 | ATBrushett | Tie into existing fire line in the log yard area OK. | | | 153 Water/Hydrant System | Reviewed | 04/20/26 | ATBrushett | 3 building stub ins inspected and OK to cover. Need to bag the new hydrants so they are not used | | | 153 Water/Hydrant System | Reviewed | 06/17/26 | KAHaggas | Underground at west of saw bldg, north of sorter ok to cover. | | | 153 Water/Hydrant System | Reviewed | 06/22/26 | KAHaggas | Underground fire lines at northeast corner of site ok to cover; see onsite plans. | | | 153 Water/Hydrant System | Reviewed | 06/23/26 | KAHaggas | underground fire lines on east side ok to cover; see onsite plans. | | | 153 Water/Hydrant System | Reviewed | 06/24/26 | KAHaggas | Underground fire line work; depth, bedding, joints, thrust blocks at east side ok. | | | 153 Water/Hydrant System | Reviewed | 07/10/26 | ESPhillips-Meadow | Fire Line inspection on east side near Keslo St. gate. Installation includes double check assembly and piping. Marked in blue on plans and dated. | | | 153 Water/Hydrant System | Reviewed | 07/13/26 | ATBrushett | Thrust blocks poured near the vault. Tie-ins and FDC still need to be complete | | | 153 Water/Hydrant System | Reviewed | 07/15/26 | KAHaggas | Underground fire line - last sections to complete loop installed; depth, bedding, joint restraints ok, ok to cover. | | | 153 Water/Hydrant System | Reviewed | 07/17/26 | KAHaggas | fdc, last riser, last hydrant all in place; depth, bedding, restraints ok, ok to cover. As of this inspection, all underground piping installed. Need hydrostatic test (200 psi for 2 hours), flush of all the new lines, forward flow/hydrant flow tests. | | | 153 Water/Hydrant System | Reviewed | 07/29/26 | KAHaggas | relocated 10" riser on east side - ok to cover. | | | 153 Water/Hydrant System | Reviewed | 08/06/26 | KAHaggas | Underground fire line system hydrostatic test = Pass. | | | 153 Water/Hydrant System | Reviewed | 11/12/26 | KAHaggas | Flushed underground fire line through 7 riser stub-ins - ok. Pressure/flow looks good for sprinkler demand. Still need to flush fire hydrants and get flow info for fire hydrants. Need Underground Installation Certification submitted to TCE. | | | 153 Water/Hydrant System | Needed | | | | | | 154 Standpipe | Needed | | | | | | 143 Fire Regulation | Reviewed | 03/11/26 | ATBrushett | Fire line and the hydrant line on the southwest side are OK to cover except where the thrust blocks are needed. | | | 143 Fire Regulation | Not Needed | 03/19/26 | ESPhillips-Meadow | wrong inspection - refer to hydrant / water inspection | | | 143 Fire Regulation | Cancelled | 07/16/26 | KAHaggas | This was a sprinkler inspection, see Fire Sprinklers entry. | | | 150 Landscaping | Needed | | | | | | 919 Bicycle Parking | Needed | | | | | | 160 Emerg Egress Light | Needed | | | | | | 199 Final Building | Needed | | | | Electrical | Active | 02/11/25 | 11/14/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 210 Undergrnd/Slab Elec | Reviewed | 04/14/25 | SRFitzHenry | see highlighted plans on site | | | 210 Undergrnd/Slab Elec | Reviewed | 04/17/25 | SRFitzHenry | see highlighted print on site | | | 210 Undergrnd/Slab Elec | Reviewed | 04/24/25 | SRFitzHenry | see highlighted plan | | | 210 Undergrnd/Slab Elec | Reviewed | 05/08/25 | SRFitzHenry | see highlighted plans onsite | | | 210 Undergrnd/Slab Elec | Reviewed | 05/13/25 | SRFitzHenry | spoke about high voltage clearances | | | 210 Undergrnd/Slab Elec | Reviewed | 05/21/25 | SRFitzHenry | see highlighted prints on site | | | 210 Undergrnd/Slab Elec | Reviewed | 06/11/25 | SRFitzHenry | see highlighted print onsite | | | 210 Undergrnd/Slab Elec | Cancelled | 11/03/25 | SRFitzHenry | | | | 210 Undergrnd/Slab Elec | Needed | | | | | | 215 Electrical - Feeder | Needed | | | | | | 217 Electrical Service | Approved | 10/30/25 | SRFitzHenry | blatchly lane. | | | 213 Bonding/Grounding | Reviewed | 06/11/25 | SRFitzHenry | see plan onsite | | | 213 Bonding/Grounding | Reviewed | 08/27/25 | SRFitzHenry | see plans on site, (5) 4/0 at footing this date | | | 213 Bonding/Grounding | Needed | | | | | | 220 Rough Electrical | Reviewed | 10/29/26 | SRFitzHenry | 5 MCC rooms and the lunch room ok to cover | | | 220 Rough Electrical | Needed | | | | | | 230 Limited Energy | Needed | | | | | | 299 Final Electrical | Needed | | | | Fire | Active | 01/10/25 | 11/14/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 849 Final Fire | Needed | | | | Plumbing | Active | 01/10/25 | 11/14/27 | | | | | Inspection | Result | | Inspected | Inspector | Comment | | | | 402 Sanitary Sewer - Private | Reviewed | 05/18/26 | JSHemmele | 11/2" sch. 80 pvc running from tank on the SE corner of building along fence running east/west. needs to be tested. 2" sch. 80 pvc running east/west connecting existing line. JSH | | | 402 Sanitary Sewer - Private | Reviewed | 06/02/26 | JSHemmele | 2" sch. 80 pvc running east/west on the southside of furthest building then turning north running under first building through sleeve. JSH | | | 402 Sanitary Sewer - Private | Reviewed | 06/08/26 | JSHemmele | 2-2" sch 80 pvc ( 1- existing, 1-new) running from cell tower to septic tank. connection to come. JSH | | | 402 Sanitary Sewer - Private | Reviewed | 06/09/26 | JSHemmele | Connection to septic tank is done. ok to cover. JSH | | | 402 Sanitary Sewer - Private | Reviewed | 06/25/26 | JSHemmele | 2" sch 80 pvc ran to sewer ejector on the west of building, 11/2" sch 80 pvc from there to sewer ejector on the NW of building. ok to cover. JSH | | | 402 Sanitary Sewer - Private | Reviewed | 07/06/26 | JSHemmele | 11/2" and 2" sch 80 pvc on test. JSH | | | 402 Sanitary Sewer - Private | Needed | | | | | | 403 Storm Sewer - Private | Reviewed | 02/11/25 | SEKelley | 3-20’ sticks of 24” CPE with tracer wire and a 12” tee to pick up a future catch basin. All going to a future pour in place MH. | | | 403 Storm Sewer - Private | Reviewed | 02/12/25 | SEKelley | 5-20’ sticks of 24” CPE with tracer wire, okay to cover. | | | 403 Storm Sewer - Private | Cancelled | 02/13/25 | JRLaCasse | Per Jason Johnson of Wildish | | | 403 Storm Sewer - Private | Cancelled | 02/14/25 | JRLaCasse | per jason of wildish via text | | | 403 Storm Sewer - Private | Reviewed | 02/18/25 | SEKelley | 5-20’ sticks of 24” CPE with tracer wire okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 02/19/25 | SEKelley | 2-9’ sticks of 8” 3034 connected to two concrete catch basins via sand collars with tracer wire, okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 02/21/25 | SEKelley | 100’ of 8” 3034 with tracer wire picking up drainage from a concrete catch basin connected via sand collar, okay to cover | | | 403 Storm Sewer - Private | Reviewed | 02/21/25 | SEKelley | 12” Inserta tee with 12’ of 12” cpe with tracer wire to serve a catch basin into 48” cpe mainline. Okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 02/24/25 | SEKelley | 1-20’ stick of 24” cpe with tracer wire connected to a 48” Cast in Place MH, okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 02/25/25 | SEKelley | 7-20’ sticks of 24” CPE with tracer wire connected to a 48” MH, okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 02/26/25 | SEKelley | 5-20’ sticks of 24” CPE with tracer wire, okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 02/27/25 | SEKelley | Continuation of 24" CPE with tracer wire to manhole base. Tee installed and 3 catch basins installed, ok to cover. | | | 403 Storm Sewer - Private | Reviewed | 02/28/25 | SEKelley | 5 sticks of 24" CPE with tracer wire, ok to cover. | | | 403 Storm Sewer - Private | Reviewed | 03/03/25 | SEKelley | 3-20’ sticks of 24” CPE with tracer wire with connection into a Cast in Place MH, okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 03/04/25 | SEKelley | 7-20’ sticks of 12” cpe with tracer wire connected to new MH and one 12” by 12” tee per plan. | | | 403 Storm Sewer - Private | Reviewed | 03/05/25 | SEKelley | 140’ of 12” cpe with tracer wire and a 12” by 12” tee, picking up drainage from a concrete CB, per plan no cleanout’s. okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 03/06/25 | SEKelley | 10’ of 12” cpe lateral grouted into square concrete CB with tracer wire, two other CB’s have 12” cpe laterals grouted into them with tracer wire, okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 04/22/25 | RC Kennedy | 24-05904-01-Reviewed-Storm, 120’ of 24” CPE with tracer wire from existing MH to new MH, 60’ of 24” CPE with tracer wire, upstream of new MH, okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 04/23/25 | RC Kennedy | 24-05904-01-Storm-Reviewed, Pg. C104, 130’ of 24” CPE with tracer wire, MH set and connected, okay to cover | | | 403 Storm Sewer - Private | Reviewed | 04/24/25 | RC Kennedy | 24-05904-01-Storm -Reviewed, Pg C104, 170’ of 24” CPE with tracer wire connected to MH, 57’ of 12” CPE serving a concrete CB connected into MH. | | | 403 Storm Sewer - Private | Reviewed | 04/25/25 | SEKelley | 100’ of 18” CPE with tracer wire from MH to serve a CB. 20’ of 24” CPE with tracer wire connecting to a MH, okay to cover all. | | | 403 Storm Sewer - Private | Reviewed | 04/28/25 | RC Kennedy | 24-05904-01-Reviewed-storm, 20’ of 18” CPE with tracer wire and a 18” by 4” c/o, okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 04/29/25 | RC Kennedy | 24-05904-01-Storm-Reviewed, Pg. C103, 2-MH cones and 2-flat top lids installed on 4-MH’s, 93’ of 18” CPE serving CB with tracer wire, 57’ of 12” CPE w/tracer wire, CB to MH, okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 04/30/25 | RC Kennedy | 24-05904-01-Storm-Reviewed, 2-8” inserta tee’s into 24” CPE with 15’ of 8” 3034 south side of new building with tracer wire, 15’ of 8” CPE with tracer wire connected to MH and new CB. Okay to cover. | | | 403 Storm Sewer - Private | Reviewed | 05/01/25 | RC Kennedy | 24-05904-01-Storm-Reviewed, 9-8” inserta tee’s into 24” and 48” CPE with a total of 277” of 8” 3034 with tracer wire, may cover | | | 403 Storm Sewer - Private | Reviewed | 03/10/26 | JSHemmele | 6- 8" rain drains along the S/E of building. JSH | | | 403 Storm Sewer - Private | Reviewed | 03/26/26 | JSHemmele | 5- 8" rain drains along the SE corner of building. One length of 12" running out of MH towards CB on the NW corner of building. JSH | | | 403 Storm Sewer - Private | Reviewed | 03/27/26 | RC Kennedy | 12" from concrete area drain to manhole on Northwest side of new building. RCK | | | 403 Storm Sewer - Private | Info Only | 03/31/26 | JSHemmele | | | | 403 Storm Sewer - Private | Reviewed | 04/07/26 | JSHemmele | Replaced 90's on the SE side of building. Ok to cover. JSH | | | 403 Storm Sewer - Private | Reviewed | 04/24/26 | JSHemmele | 5- 8" raindrains on the SW end of building. JSH | | | 403 Storm Sewer - Private | Cancelled | 05/18/26 | JSHemmele | Needed sanitary sewer. JSH | | | 403 Storm Sewer - Private | Reviewed | 07/07/26 | JSHemmele | 5- rain drains on the north side of the sw building. 90's and c/o's to come. JSH | | | 403 Storm Sewer - Private | Reviewed | 07/13/26 | JSHemmele | 5- storm lines 90'ed up on the northside of SW building. ok to cover. JSH | | | 403 Storm Sewer - Private | Needed | | | | | | 318 Under Floor Plumb | Reviewed | 05/09/25 | RC Kennedy | 1" PEX running West to East on South conveyer line. Turning North. Air test ok, piping on interior of foundation. RCK | | | 318 Under Floor Plumb | Reviewed | 05/27/25 | RC Kennedy | 2" PEX serving South RR, air test ok. RCK | | | 318 Under Floor Plumb | Reviewed | 07/10/25 | RC Kennedy | Rest room break room Southeast side, G.L. 41-45 and -B-A. Test ok, ok to cover. 4" waste stub to rest room on West side, G.L. 28-N Pictures to come. RCK | | | 318 Under Floor Plumb | Reviewed | 07/18/25 | RC Kennedy | Required pictures received, 7/18/25. RCK | | | 318 Under Floor Plumb | Reviewed | 08/22/25 | SEKelley | Restrooms at Grid Lines N and 28, ok to cover. | | | 318 Under Floor Plumb | Reviewed | 09/05/25 | RC Kennedy | Rest room break room Southeast side, G.L. 41-45 and -B-A, pictures received of trap primer lines, floor drains, pipe wrapped for concrete pour. RCK | | | 318 Under Floor Plumb | Reviewed | 12/05/25 | JSHemmele | Restrooms and mop sink. grid lines D-6. JSH | | | 318 Under Floor Plumb | Needed | | | | | | 320 Rough Plumbing | Needed | | | | | | 325 Water Service | Reviewed | 10/06/26 | JSHemmele | 2" pex with tracer wire on air test. ok to cover. Meter connection and static pressure check to come. JSH | | | 325 Water Service | Needed | | | | | | 399 Final Plumbing | Needed | | | |
| | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | Fees | Total Due | Amount Paid | Paid Date | Amount Due | Application | $26,400.00 | $26,400.00 | | $0.00 | Bethel Const Excise Tax, Commercial | $26,400.00 | $26,400.00 | 01/09/25 | $0.00 | Miscellaneous Admin, State | $0.00 | $0.00 | 01/09/25 | $0.00 | Building | $352,172.76 | $352,172.76 | | $0.00 | Building Plan Check per Applicant Value | $53,356.63 | $53,356.63 | 08/23/24 | $0.00 | Supplemental Plan Review, Bldg | $1,148.00 | $1,148.00 | 01/09/25 | $0.00 | Supplemental Plan Review, Bldg | $287.00 | $287.00 | 02/21/25 | $0.00 | Supplemental Plan Review, Bldg | $114.80 | $114.80 | 03/24/26 | $0.00 | Supplemental Plan Review, Bldg | $287.00 | $287.00 | 08/06/26 | $0.00 | Supplemental Plan Review, Bldg | $114.80 | $114.80 | 10/02/26 | $0.00 | Supplemental Plan Check, Str. Eng. | $688.80 | $688.80 | 01/09/25 | $0.00 | Supplemental Plan Check, Str. Eng. | $344.40 | $344.40 | 01/09/25 | $0.00 | Supplemental Plan Check, Str. Eng. | $229.60 | $229.60 | 03/10/25 | $0.00 | Supplemental Plan Check, Str. Eng. | $344.40 | $344.40 | 06/10/25 | $0.00 | Supplemental Plan Check, Str. Eng. | $57.40 | $57.40 | 06/25/25 | $0.00 | Supplemental Plan Check, Str. Eng. | $57.40 | $57.40 | 07/23/25 | $0.00 | Supplemental Plan Check, Str. Eng. | $57.40 | $57.40 | 08/01/25 | $0.00 | Supplemental Plan Check, Str. Eng. | $57.40 | $57.40 | 03/02/26 | $0.00 | Supplemental Plan Check, Str. Eng. | $57.40 | $57.40 | 03/24/26 | $0.00 | Supplemental Plan Check, Str. Eng. | $459.20 | $459.20 | 05/22/26 | $0.00 | Supplemental Plan Check, Str. Eng. | $229.60 | $229.60 | 10/02/26 | $0.00 | Supplemental Plan Check, Str. Eng. | $57.40 | $57.40 | 11/19/26 | $0.00 | SI - Fire/Life Safety PC Added Value | $2,005.18 | $2,005.18 | 03/31/25 | $0.00 | Fire/Life Safety Plan Check | $47,009.37 | $47,009.37 | 01/09/25 | $0.00 | Fire Systems Plan Check Fee - Sprinklers | $4,566.65 | $4,566.65 | 05/20/25 | $0.00 | Adjusted Building Plan Check | $23,033.59 | $23,033.59 | 01/09/25 | $0.00 | SI - Bldg Plan Check for Added Value | $3,258.41 | $3,258.41 | 03/31/25 | $0.00 | Deferred Submittal Plan Check | $416.14 | $416.14 | 05/20/25 | $0.00 | Building Permit Fee per Bldg Div Value | $117,523.42 | $117,523.42 | 01/09/25 | $0.00 | SI - Building Permit for Added Value | $5,012.94 | $5,012.94 | 03/31/25 | $0.00 | Fire System Permit Fee - Sprinklers | $7,025.62 | $7,025.62 | 05/20/25 | $0.00 | Inspection Outside Normal Work Hours | $229.60 | $229.60 | 10/21/25 | $0.00 | Zoning Plan Check | $52,885.54 | $52,885.54 | 01/09/25 | $0.00 | Supplemental Plan Review, Zoning | $114.80 | $114.80 | 01/09/25 | $0.00 | Supplemental Plan Review, Zoning | $114.80 | $114.80 | 01/09/25 | $0.00 | Supplemental Plan Review, Zoning | $34.44 | $34.44 | 03/10/25 | $0.00 | Supplemental Plan Review, Zoning | $11.48 | $11.48 | 03/31/25 | $0.00 | Zoning Inspection | $229.60 | $229.60 | 01/09/25 | $0.00 | SI - Zoning Plan Check for Added Value | $2,255.82 | $2,255.82 | 03/31/25 | $0.00 | State Surcharge, Structural | $14,557.00 | $14,557.00 | 01/09/25 | $0.00 | State Surcharge, Structural | $601.51 | $601.51 | 03/31/25 | $0.00 | State Surcharge, Structural | $843.07 | $843.07 | 05/20/25 | $0.00 | State Surcharge, Structural | $27.55 | $27.55 | 10/21/25 | $0.00 | Building Technology Admin Fee, Local | $4,861.85 | $4,861.85 | 01/09/25 | $0.00 | Building Technology Admin Fee, Local | $5.74 | $5.74 | 02/21/25 | $0.00 | Building Technology Admin Fee, Local | $5.28 | $5.28 | 03/10/25 | $0.00 | Building Technology Admin Fee, Local | $250.88 | $250.88 | 03/31/25 | $0.00 | Building Technology Admin Fee, Local | $240.17 | $240.17 | 05/20/25 | $0.00 | Building Technology Admin Fee, Local | $6.89 | $6.89 | 06/10/25 | $0.00 | Building Technology Admin Fee, Local | $1.15 | $1.15 | 06/25/25 | $0.00 | Building Technology Admin Fee, Local | $1.15 | $1.15 | 07/23/25 | $0.00 | Building Technology Admin Fee, Local | $1.15 | $1.15 | 08/01/25 | $0.00 | Building Technology Admin Fee, Local | $4.59 | $4.59 | 10/21/25 | $0.00 | Building Technology Admin Fee, Local | $1.15 | $1.15 | 03/02/26 | $0.00 | Building Technology Admin Fee, Local | $3.44 | $3.44 | 03/24/26 | $0.00 | Building Technology Admin Fee, Local | $9.18 | $9.18 | 05/22/26 | $0.00 | Building Technology Admin Fee, Local | $5.74 | $5.74 | 08/06/26 | $0.00 | Building Technology Admin Fee, Local | $6.89 | $6.89 | 10/02/26 | $0.00 | Building Technology Admin Fee, Local | $1.15 | $1.15 | 11/19/26 | $0.00 | Building Plan Check Admin | $3,386.52 | $3,386.52 | 01/09/25 | $0.00 | Building Plan Check Admin | $0.36 | $0.36 | 03/31/25 | $0.00 | Building Plan Check Admin | $0.00 | $0.00 | | $0.00 | Building Admin Fee, State | $3,674.68 | $3,674.68 | 01/09/25 | $0.00 | Building Admin Fee, State | ($0.36) | ($0.36) | 03/31/25 | $0.00 | Electrical | $30,987.60 | $30,987.60 | | $0.00 | Electric Plan Check | $3,880.26 | $3,880.26 | 02/10/25 | $0.00 | 200 amps or less | $267.80 | $267.80 | 02/10/25 | $0.00 | 201 to 400 amps | $7,374.50 | $7,374.50 | 02/10/25 | $0.00 | 601 to 1000 amps | $0.00 | $0.00 | | $0.00 | Over 1000 amps or volts | $3,012.00 | $3,012.00 | 02/10/25 | $0.00 | Over 1000 amps or volts | $9,036.00 | $9,036.00 | 05/15/25 | $0.00 | Branch Circuits w/ Feeder or Service | $432.15 | $432.15 | 02/10/25 | $0.00 | Branch Circuits w/ Feeder or Service | $3,587.85 | $3,587.85 | 11/11/25 | $0.00 | State Surcharge, Electrical | $1,330.37 | $1,330.37 | 02/10/25 | $0.00 | State Surcharge, Electrical | $1,084.32 | $1,084.32 | 05/15/25 | $0.00 | State Surcharge, Electrical | $430.54 | $430.54 | 11/11/25 | $0.00 | Electric Technology Admin Fee, Local | $299.33 | $299.33 | 02/10/25 | $0.00 | Electric Technology Admin Fee, Local | $180.72 | $180.72 | 05/15/25 | $0.00 | Electric Technology Admin Fee, Local | $71.76 | $71.76 | 11/11/25 | $0.00 | Electric Plan Check Admin | $0.00 | $0.00 | | $0.00 | Fire | $18,742.78 | $18,742.78 | | $0.00 | Fire Plan Check | $17,628.45 | $17,628.45 | 01/09/25 | $0.00 | Supplemental Plan Review, Fire | $57.40 | $57.40 | 01/09/25 | $0.00 | Supplemental Plan Review, Fire | $114.80 | $114.80 | 02/21/25 | $0.00 | Private Water/Hydrant Systems (2 insps) | $454.75 | $454.75 | 03/02/26 | $0.00 | Reinspection, Fire | $114.80 | $114.80 | 03/02/26 | $0.00 | Fire Technology Admin Fee, Local | $353.72 | $353.72 | 01/09/25 | $0.00 | Fire Technology Admin Fee, Local | $2.30 | $2.30 | 02/21/25 | $0.00 | Fire Technology Admin Fee, Local | $11.39 | $11.39 | 03/02/26 | $0.00 | Fire Plan Check Admin | $5.17 | $5.17 | 01/09/25 | $0.00 | Fire Plan Check Admin | $0.00 | $0.00 | | $0.00 | Plumbing | $4,377.82 | $4,377.82 | | $0.00 | Plumbing Fixtures | $607.20 | $607.20 | 01/09/25 | $0.00 | Storm Sewer Footage | $2,584.60 | $2,584.60 | 01/09/25 | $0.00 | Water Service Footage | $335.50 | $335.50 | 01/09/25 | $0.00 | State Surcharge, Plumbing | $462.51 | $462.51 | 01/09/25 | $0.00 | Plumbing Technology Admin Fee, Local | $70.55 | $70.55 | 01/09/25 | $0.00 | Plumbing Plan Check Admin | $0.00 | $0.00 | 01/09/25 | $0.00 | Plumbing Admin Fee, State | $317.46 | $317.46 | 01/09/25 | $0.00 | Public Works | $1,491.34 | $1,491.34 | | $0.00 | PW Plan Check, New Commercial | $1,176.00 | $1,176.00 | 01/09/25 | $0.00 | Supplemental Plan Review, Public Works | $114.80 | $114.80 | 01/09/25 | $0.00 | Supplemental Plan Review, Public Works | $57.40 | $57.40 | 03/10/25 | $0.00 | PW Technology Admin Fee, Local | $25.82 | $25.82 | 01/09/25 | $0.00 | PW Technology Admin Fee, Local | $1.15 | $1.15 | 03/10/25 | $0.00 | PW Plan Check Admin | $116.17 | $116.17 | 01/09/25 | $0.00 | PW Plan Check Admin | $0.00 | $0.00 | | $0.00 | Total All Fees | $434,172.30 | $434,172.30 | | $0.00 |
| | | |
| | | |
| |
| |