City of Eugene
Planning & Development
Building and Permit Services
Permit Number: 22-07427-01
Date: 4/5/2026
Address: 355 E 5TH AVE
Project Description: 4-story apartment building, amenity spaces, storage, common rooms, terrace and parking garage.
Application Type:
Commercial
Status:
Issued
Scope of Work:
Phased Permit
Zoning:
Downtown Riverfront
Map:
17-03-32-22
Tax Lot:
01800
Subdivision:
Addition:
Lot:
Block:
Date Received:
09/30/22
# Bedrooms:
0
Commitment Date:
12/05/22
# Dwelling Units:
0
Ready to issue as of:
07/18/23
In Flood Plain:
Project Coordinator:
Jeremiah LeGrue
Phone:
541-682-6053
  
Sign Standards:
 
BUILDING CHARACTERISTICS
Construction Types:
1AS
Construction Type Comments:
5AS
 
OccupancyTypes:
R2
 
Occupancy Type Comments:
S2
Parking Garage (Enclosed)
 
B
 
S1
 
Occupancy Load:
0
Separated Building:
Yes
Fire Sprinklers:
Yes Required
 
Fire Alarms:
Yes Required
 
Building Area:
225006
Number of Stories:
4
Comment:
4 story plus basement
Floor Areas (sq ft):
Floor
Existing Floor Area
New Floor Area
Total Area
1st Floor
0
49839
49839
2nd Floor
0
41778
41778
3rd Floor
0
41778
41778
4th Floor
0
41778
41778
Basement 1
0
49839
49839
Existing floor area may not be shown.
CONTRACTOR DATA
Type
Contractor
Building
ESSEX GENERAL CONSTRUCTION
Electric
MERIT ELECTRIC OF SPOKANE INC
Mechanical
COMFORT FLOW HEATING
Plumbing
BROTHERS PLUMBING INC
Primary Contact
CURRIN WALTER
PLAN REVIEW SUMMARY
Plan review data displayed is the most current for each review. The applicant will receive notification of all issues needing additional information after all reviews on a project have been completed. Supplemental Information (SI) can be submitted prior to or after permit issuance. If you have any questions regarding your project, contact JSLeGrue at 541-682-6053 or send email to jeremiah.s.legrue@ci.eugene.or.us. Also note that some reviews (i.e., fire alarms, fire sprinklers) are deferred submittals and will be reviewed after original permit(s) have been issued.
Status Definitions
Pending
=
Review has not been started
Review
=
Under review
Waiting
=
Review for individual review has been completed, waiting for a response
External Wait
=
All reviews for project have been completed, waiting for a response
Approved
=
Review has been approved
Information
=
Information only, review not approved
Denied
=
Project cannot be approved as submitted
For information regarding the review of your project or the commitment date for completion of review, please contact your project coordinator, JSLeGrue, at jeremiah.s.legrue@ci.eugene.or.us or by phone at 541-682-6053.
Plan Review
Status
Review Completion Date
Project Coordination, Application Submittal
External Wait Time
12/05/22
Pre Issuance Coord, Pre Issuance SI
Approved
04/25/23
Post Issuance Coord, Post Issuance SI
Approved
05/22/25
Deferred Coordination, Deferred Submittal
Approved
02/04/25
Building, Application Submittal
Approved
10/07/22
Building, Post Issuance SI
Approved
05/19/25
Building, Deferred Submittal
Approved
02/04/25
Structural, Application Submittal
Approved
07/01/24
Structural, Pre Issuance SI
Approved
11/16/22
Structural, Post Issuance SI
Approved
11/20/24
Structural, Deferred Submittal
Approved
06/11/24
Mechanical, Post Issuance SI
Approved
04/26/24
Mechanical, Deferred Submittal
Waiting for info
07/07/23
Electrical, Post Issuance SI
Approved
08/31/23
Zoning, Application Submittal
Approved
12/02/22
Zoning, Post Issuance SI
Approved
02/21/25
Public Works, Application Submittal
Waiting for info
11/30/22
Public Works, Pre Issuance SI
Approved
04/25/23
Public Works, Post Issuance SI
Approved
05/22/25
Fire Marshal, Post Issuance SI
Approved
07/09/24
Fire Marshal, Deferred Submittal
Approved
04/09/24
A M & M, Post Issuance SI
Approved
03/18/25
Erosion Prevention, Application Submittal
Approved
04/25/23
Fire Alarm Plans, Deferred Submittal
Approved
02/22/24
Fire Sprinkler Plans, Deferred Submittal
Approved
11/28/23
PERMITS AND INSPECTIONS
Permit Type
Status
 
Issued Date
Expiration Date
Completion Date
 
Building
Finished
04/27/23
06/01/26
06/09/25
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
103 Footing
Approved
05/30/25
SEGalbreath
 
 
105 Elec Rebar Ground
Approved
06/02/25
SEGalbreath
One inspected only per previous note
 
108 Foundation
Approved
05/30/25
SEGalbreath
 
 
109 Foundation Drain/Waterproofing
Approved
05/30/25
SEGalbreath
 
 
110 Structural Concrete
Approved
05/30/25
SEGalbreath
 
 
116 Underfloor Insulation
Approved
05/30/25
SEGalbreath
 
 
123 Floor Sheathing
Approved
01/22/25
SEGalbreath
 
 
118 Framing
Approved
05/22/25
SEGalbreath
 
 
117 Roof Sheathing
Approved
05/30/25
SEGalbreath
 
 
119 Exterior Shearwall
Approved
08/21/24
SEGalbreath
Exterior wall sheathing complete
 
129 Interior Shearwall
Approved
05/30/25
SEGalbreath
 
 
127 Masonry Construction
Approved
05/30/25
SEGalbreath
 
 
120 Wall/Vault Insulation
Approved
05/30/25
SEGalbreath
 
 
130 Lath or Dry Wall
Approved
05/30/25
SEGalbreath
 
 
131 Firestop Assemblies
Approved
06/03/25
SEGalbreath
 
 
121 Ceiling Grid
Approved
05/30/25
SEGalbreath
 
 
124 Final Insulation
Approved
06/02/25
SEGalbreath
 
 
146 Fire Sprinklers
Approved
06/05/25
ATBrushett
Sprinkler corrections have been made and all systems tested.
 
147 Alarm Systems
Approved
06/05/25
ATBrushett
Monitoring inspection complete and the standpipe labeling has been changed.
 
154 Standpipe
Approved
05/29/25
ATBrushett
Inspected with the sprinkler system, tested the hose outlets on the roof
 
143 Fire Regulation
Approved
06/05/25
ATBrushett
All fire issues have been inspected and are approved
 
150 Landscaping
Approved
05/22/25
JTShadwick
 
 
919 Bicycle Parking
Approved
05/08/25
JTShadwick
Long term:
A151F / Level 1 / Room 160: 2 V
A152E / Level 2 / Room 264: 6 H & 11 V
A153E / Level 3 / Room 364: 6 H & 11 V
Total: 12 H & 24 V = 36 LT
Section 12 93 10 of Project Manual (Pg. 586/700)

Short term:
AO51 Site Plan
5 racks / 10 spaces in ROW adjacent to 5th Avenue
5 racks / 10 spaces next to building adjacent to 5th Avenue
 
160 Emerg Egress Light
Approved
06/06/25
SEGalbreath
 
 
199 Final Building
Approved
06/06/25
SEGalbreath
 
Electrical
Finished
07/18/23
06/01/26
06/09/25
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
210 Undergrnd/Slab Elec
Approved
06/02/25
JKGoschie
 
 
215 Electrical - Feeder
Approved
06/02/25
JKGoschie
 
 
217 Electrical Service
Approved
10/15/24
JKGoschie
EWEB at 9:31. Main service and solar service.
 
225 Elec Ceiling Cover
Approved
06/02/25
JKGoschie
 
 
220 Rough Electrical
Approved
06/02/25
JKGoschie
 
 
230 Limited Energy
Approved
06/02/25
JKGoschie
 
 
299 Final Electrical
Approved
06/03/25
JKGoschie
 
Fire
Finished
07/18/23
06/01/26
06/09/25
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
849 Final Fire
Approved
06/05/25
ATBrushett
All fire issues have been inspected and are approved
Mechanical
Finished
07/18/23
06/01/26
06/09/25
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
416 Rough Gas Piping
Approved
04/02/25
SEGalbreath
 
 
450 Final Gas Piping
Approved
06/02/25
SEGalbreath
Fire pit to be replaced.
 
420 Rough Mechanical
Approved
05/30/25
SEGalbreath
 
 
499 Final Mechanical
Approved
06/02/25
SEGalbreath
 
Plumbing
Finished
07/18/23
06/01/26
06/09/25
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
310 Sanitary Sewer
Reviewed
09/01/23
JRLaCasse
connection into manhole with sand collar and filled-in with CDF okay
 
402 Sanitary Sewer - Private
Approved
05/29/25
RC Kennedy
 
 
310 Sanitary Sewer
Reviewed
10/26/23
TSHodges
1. New exterior drop to public manhole, okay to pour flowable backfill around drop. Connection to structure at a later time.
2. Connection near NW corner of structure okay, marked plans
 
310 Sanitary Sewer
Reviewed
10/30/23
LXNgariki
Install building sewer to building drain and run connects to manhole, OK
 
310 Sanitary Sewer
Cancelled
12/05/23
JRLaCasse
 
 
310 Sanitary Sewer
Reviewed
12/06/23
JRLaCasse
6" Connection to mainline made, one-way c/o installed and water tested-marked plans
 
315 Storm Sewer
Reviewed
10/25/23
TSHodges
8" 3034 with directional cleanout in right of way, transitioning to 6" PVC under building. RCK

Phone meeting with Mike Swancutt. TSH 10/25/2023 09:00
 
315 Storm Sewer
Reviewed
10/26/23
TSHodges
Storm connection westside okay, marked plans.
 
315 Storm Sewer
Reviewed
03/11/24
JRLaCasse
Marked plans. Install at own risk as another storm sewer connection was made that's not on the plans. Talked to Andy Driscoll of Essex to get their design team to upload changes.
 
403 Storm Sewer - Private
Approved
05/29/25
RC Kennedy
 
 
318 Under Floor Plumb
Approved
10/31/23
SEKelley
Underfloor plumbing complete.
 
320 Rough Plumbing
Approved
11/13/24
SEKelley
 
 
325 Water Service
Approved
10/25/23
SEKelley
4" copper tied to ductile iron from EWEB vault. 80 PSI air tests ok.
 
335 Backflow Device
Approved
05/06/25
SEKelley
Backflow test reports received.
 
399 Final Plumbing
Approved
05/29/25
RC Kennedy
 
Public Works
Finished
04/27/23
06/01/26
06/09/25
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
400 Sanitary Sewer - Public
Approved
05/22/25
JRLaCasse
 
 
401 Storm Sewer - Public
Approved
05/22/25
JRLaCasse
 
 
750 R/W Excavation
Approved
05/22/25
JRLaCasse
Inspect electrical conduit permitted under recorded revocable permit.
 
770 Sidewalk PW
Not Needed
05/22/25
MMorrison
 
 
765 Sidewalk
Approved
05/22/25
SEGalbreath
 
 
775 Drive/Curb Cut
Info Only
01/30/25
SEGalbreath
Inspector to call MM if needed and ask if he can meet onsite. SEG
 
780 Drive/Curb Cut PW
Not Needed
05/08/25
MMorrison
 
 
775 Drive/Curb Cut
Info Only
05/08/25
SEGalbreath
Site visit with MM re: access connection and inspection scheduling.
 
775 Drive/Curb Cut
Not Needed
05/22/25
SEGalbreath
Per email from Michele W this has been inspected and by PWE under agreement with COE and developer.
 
799 Final Public Works
Approved
06/04/25
JRLaCasse
per conversation with Sean Galbreath, Andrew said it was okay to approve final PW and the revocable can be worked out separately.
To request an inspection go to https://pdd.eugene-or.gov/BuildingPermits/InspectionLogin.
For more information call 541-682-5283.
FEES
Fees
Total Due
Amount Paid
Paid Date
Amount Due
Building
$38,635.06
$38,635.06
 
$0.00
Building Plan Check per Applicant Value
$4,685.72
$4,685.72
04/27/23
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
04/27/23
$0.00
Supplemental Plan Check, Str. Eng.
$107.60
$107.60
07/27/23
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
08/31/23
$0.00
Supplemental Plan Check, Str. Eng.
$107.60
$107.60
08/31/23
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
01/29/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
02/26/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
02/26/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
04/04/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
04/04/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
06/10/24
$0.00
Supplemental Plan Check, Str. Eng.
$107.60
$107.60
06/10/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
06/10/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/08/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
02/06/25
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
07/27/23
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
09/25/23
$0.00
Supplemental Plan Review, Bldg
$645.60
$645.60
10/30/23
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
11/20/23
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
01/29/24
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
02/26/24
$0.00
Supplemental Plan Review, Bldg
$107.60
$107.60
03/14/24
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
03/14/24
$0.00
Supplemental Plan Review, Bldg
$10.76
$10.76
04/04/24
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
04/04/24
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
06/10/24
$0.00
Supplemental Plan Review, Bldg
$484.20
$484.20
07/08/24
$0.00
Supplemental Plan Review, Bldg
$269.00
$269.00
07/08/24
$0.00
Supplemental Plan Review, Bldg
$10.76
$10.76
02/06/25
$0.00
Supplemental Plan Review, Bldg
$269.00
$269.00
03/06/25
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
04/17/25
$0.00
Supplemental Plan Review, Bldg
$21.52
$21.52
06/02/25
$0.00
Fire/Life Safety Plan Check
$2,883.52
$2,883.52
04/27/23
$0.00
Phased Permit Base Fee
$350.00
$350.00
07/27/23
$0.00
Phased Permit Coordination Fee
$720.88
$720.88
04/27/23
$0.00
Fire Systems Plan Check Fee - Alarms
$711.78
$711.78
02/26/24
$0.00
Fire Systems Plan Check Fee - Sprinklers
$1,943.55
$1,943.55
11/30/23
$0.00
Deferred Submittal Plan Check
$867.41
$867.41
08/31/23
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
10/30/23
$0.00
Deferred Submittal Plan Check
$841.81
$841.81
11/20/23
$0.00
Deferred Submittal Plan Check
$234.45
$234.45
11/30/23
$0.00
Deferred Submittal Plan Check
$247.89
$247.89
01/29/24
$0.00
Deferred Submittal Plan Check
$450.13
$450.13
01/29/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
01/29/24
$0.00
Deferred Submittal Plan Check
$834.13
$834.13
03/14/24
$0.00
Deferred Submittal Plan Check
$240.21
$240.21
03/14/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
04/04/24
$0.00
Deferred Submittal Plan Check
$670.29
$670.29
04/04/24
$0.00
Deferred Submittal Plan Check
$484.69
$484.69
06/10/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
06/10/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
07/08/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
02/06/25
$0.00
Building Permit Fee per Bldg Div Value
$7,208.80
$7,208.80
04/27/23
$0.00
Fire System Permit Fee - Alarms
$1,095.04
$1,095.04
02/26/24
$0.00
Fire System Permit Fee - Sprinklers
$2,990.08
$2,990.08
11/30/23
$0.00
Inspection Outside Normal Work Hours
$215.20
$215.20
06/02/25
$0.00
Zoning Plan Check
$3,243.96
$3,243.96
04/27/23
$0.00
Supplemental Plan Review, Zoning
$53.80
$53.80
06/10/24
$0.00
State Surcharge, Structural
$945.25
$945.25
04/27/23
$0.00
State Surcharge, Structural
$358.81
$358.81
11/30/23
$0.00
State Surcharge, Structural
$131.40
$131.40
02/26/24
$0.00
State Surcharge, Structural
$25.82
$25.82
06/02/25
$0.00
Building Plan Check Admin
$1,042.91
$1,042.91
04/27/23
$0.00
Building Plan Check Admin
$0.00
$0.00
 
$0.00
Building Admin Fee, State
$648.79
$648.79
04/27/23
$0.00
Building Admin Fee, State
$0.00
$0.00
 
$0.00
Electrical
$861.92
$861.92
 
$0.00
Supplemental Plan Check, Electrical
$107.60
$107.60
09/25/23
$0.00
200 amps or less
$390.00
$390.00
09/25/23
$0.00
201 to 400 amps
$166.50
$166.50
09/25/23
$0.00
Branch Circuits w/ Feeder or Service
$117.00
$117.00
09/25/23
$0.00
State Surcharge, Electrical
$80.82
$80.82
09/25/23
$0.00
Electric Admin Fee, State
$0.00
$0.00
 
$0.00
Electric Plan Check Admin
$0.00
$0.00
 
$0.00
Fire
$53.80
$53.80
 
$0.00
Supplemental Plan Review, Fire
$53.80
$53.80
07/18/24
$0.00
Fire Plan Check Admin
$0.00
$0.00
 
$0.00
Mechanical
$107.60
$107.60
 
$0.00
Supplemental Plan Review, Mechanical
$53.80
$53.80
10/30/23
$0.00
Supplemental Plan Review, Mechanical
$53.80
$53.80
06/10/24
$0.00
Mechanical Plan Check Admin
$0.00
$0.00
 
$0.00
Mechanical Admin Fee, State
$0.00
$0.00
 
$0.00
Public Works
$6,003.55
$6,003.55
 
$0.00
PW Plan Check, New Commercial
$954.75
$954.75
04/27/23
$0.00
Stormwater Mgmt Facility
$289.75
$289.75
06/08/23
$0.00
Supplemental Plan Review, Public Works
$645.60
$645.60
04/27/23
$0.00
Supplemental Plan Review, Public Works
$107.60
$107.60
08/10/23
$0.00
Supplemental Plan Review, Public Works
$53.80
$53.80
07/08/24
$0.00
Supplemental Plan Review, Public Works
$53.80
$53.80
06/02/25
$0.00
Revocable Permit (w/ Recorded Agree)
$651.50
$651.50
04/27/23
$0.00
Revocable Permit (w/ Recorded Agree)
$651.50
$651.50
04/17/25
$0.00
Revocable Permit (w/o Recorded Agree)
$681.75
$681.75
07/18/24
$0.00
Revocable Permit (w/o Recorded Agree)
$454.50
$454.50
04/17/25
$0.00
R-O-W Excavation (w/ pavement cuts)
$546.50
$546.50
06/08/23
$0.00
R-O-W Excavation (w/o pavement cuts)
$182.50
$182.50
04/27/23
$0.00
R-O-W Excavation (w/o pavement cuts)
$547.50
$547.50
06/08/23
$0.00
R-O-W Excavation (w/o pavement cuts)
$182.50
$182.50
04/17/25
$0.00
PW Plan Check Admin
$0.00
$0.00
04/27/23
$0.00
PW Plan Check Admin
$0.00
$0.00
 
$0.00
Total All Fees
$45,661.93
$45,661.93
 
$0.00
Page 1 of 1
Date: 4/5/2026