Permit Number: 21-09848-01
Date: 4/29/2025
Address: 2960 WILLAMETTE ST
Project Description: 4-Story Apartment Building
Units: 101-104, 201-207, 301-307, 401-406
Application Type:
Commercial
Status:
Issued
Scope of Work:
New Apt Bldg (3+ units)
Zoning:
Limited High-Density Residential Zone
Map:
18-03-07-11
Tax Lot:
09700
Subdivision:
Alta Vista Tract
Addition:
Lot:
14&15
Block:
1
Date Received:
12/30/21
# Bedrooms:
31
Commitment Date:
02/15/22
# Dwelling Units:
24
Ready to issue as of:
04/29/22
In Flood Plain:
Project Coordinator:
Erik Swinney
Phone:
541-682-5372
  
Sign Standards:
 
BUILDING CHARACTERISTICS
Construction Types:
5AS
Construction Type Comments:
 
OccupancyTypes:
R2
 
Occupancy Type Comments:
 
1st Floor = 27 occupants (1:200 Gross)
2nd Floor = 28 occupants
3rd Floor = 28 occupants
4th Floor = 28 occupants
 
 
Occupancy Load:
111
Separated Building:
N/A
Fire Sprinklers:
Yes Required
13R
Fire Alarms:
Yes Required
 
Building Area:
21679
Number of Stories:
4
Comment:
 
Floor Areas (sq ft):
Floor
Existing Floor Area
New Floor Area
Total Area
1st Floor
0
5275
5275
2nd Floor
0
5468
5468
3rd Floor
0
5468
5468
4th Floor
0
5468
5468
Existing floor area may not be shown.
CONTRACTOR DATA
Type
Contractor
Building
MEILI CONSTRUCTION
Electric
NEW REYNOLDS ELECTRIC INC
Mechanical
COMFORT FLOW HEATING
Plumbing
HCH MECHANICAL
Primary Contact
MCCLOSKEY SHANE
PLAN REVIEW SUMMARY
Plan review data displayed is the most current for each review. The applicant will receive notification of all issues needing additional information after all reviews on a project have been completed. Supplemental Information (SI) can be submitted prior to or after permit issuance. If you have any questions regarding your project, contact EFSwinney at 541-682-5372 or send email to erik.f.swinney@ci.eugene.or.us. Also note that some reviews (i.e., fire alarms, fire sprinklers) are deferred submittals and will be reviewed after original permit(s) have been issued.
Status Definitions
Pending
=
Review has not been started
Review
=
Under review
Waiting
=
Review for individual review has been completed, waiting for a response
External Wait
=
All reviews for project have been completed, waiting for a response
Approved
=
Review has been approved
Information
=
Information only, review not approved
Denied
=
Project cannot be approved as submitted
For information regarding the review of your project or the commitment date for completion of review, please contact your project coordinator, EFSwinney, at erik.f.swinney@ci.eugene.or.us or by phone at 541-682-5372.
Plan Review
Status
Review Completion Date
Project Coordination, Application Submittal
External Wait Time
02/16/22
Pre Issuance Coord, Pre Issuance SI
Approved
04/29/22
Post Issuance Coord, Post Issuance SI
Approved
12/21/22
Deferred Coordination, Deferred Submittal
Approved
05/31/23
Building, Application Submittal
Waiting for info
02/11/22
Building, Pre Issuance SI
Approved
04/29/22
Building, Post Issuance SI
Approved
12/21/22
Building, Deferred Submittal
Approved
06/30/22
Structural, Application Submittal
Waiting for info
02/10/22
Structural, Pre Issuance SI
Approved
04/19/22
Structural, Deferred Submittal
Approved
05/12/22
Mechanical, Application Submittal
Waiting for info
02/11/22
Mechanical, Pre Issuance SI
Approved
03/25/22
Electrical, Application Submittal
Approved
02/10/22
Electrical, Pre Issuance SI
Approved
03/25/22
Plumbing, Application Submittal
Waiting for info
01/11/22
Plumbing, Pre Issuance SI
Approved
03/08/22
Zoning, Application Submittal
Waiting for info
02/15/22
Zoning, Pre Issuance SI
Waiting for info
03/23/22
Public Works, Application Submittal
Approved
03/25/22
Stormwater Standards, Application Submittal
Waiting for info
02/16/22
Stormwater Standards, Pre Issuance SI
Approved
03/25/22
Stormwater Standards, Deferred Submittal
Approved
05/22/23
SDC, Application Submittal
Waiting for info
02/16/22
SDC, Pre Issuance SI
Approved
03/25/22
Fire Marshal, Application Submittal
Waiting for info
02/07/22
Fire Marshal, Pre Issuance SI
Approved
03/17/22
Fire Marshal, Post Issuance SI
Approved
08/29/22
Erosion Prevention, Application Submittal
Approved
03/17/22
Fire Alarm Plans, Deferred Submittal
Approved
06/02/22
Fire Sprinkler Plans, Deferred Submittal
Approved
06/01/22
PERMITS AND INSPECTIONS
Permit Type
Status
 
Issued Date
Expiration Date
Completion Date
 
Building
Finished
04/29/22
05/26/24
06/01/23
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
103 Footing
Approved
05/09/23
SEGalbreath
 
 
105 Elec Rebar Ground
Approved
06/24/22
SEGalbreath
tagged (1)
 
108 Foundation
Approved
05/09/23
SEGalbreath
 
 
109 Foundation Drain/Waterproofing
Approved
03/20/23
JAJohannesen
 
 
116 Underfloor Insulation
Approved
07/11/22
SEGalbreath
Slab edge only
 
118 Framing
Approved
12/19/22
SEGalbreath
 
 
117 Roof Sheathing
Approved
09/23/22
SEGalbreath
 
 
119 Exterior Shearwall
Approved
12/19/22
SEGalbreath
 
 
129 Interior Shearwall
Approved
12/19/22
SEGalbreath
 
 
120 Wall/Vault Insulation
Approved
12/19/22
SEGalbreath
 
 
130 Lath or Dry Wall
Approved
05/09/23
SEGalbreath
 
 
131 Firestop Assemblies
Approved
05/17/23
SEGalbreath
 
 
124 Final Insulation
Approved
12/19/22
SEGalbreath
 
 
146 Fire Sprinklers
Approved
05/17/23
ATBrushett
TCE upload complete
 
147 Alarm Systems
Approved
05/17/23
ATBrushett
TCE upload complete
 
153 Water/Hydrant System
Approved
05/04/23
ATBrushett
Backflow locked FDC caps provided
 
143 Fire Regulation
Approved
05/17/23
ATBrushett
Fall protection provided on the roof hatch
 
150 Landscaping
Approved
05/12/23
MHDenberg
 
 
919 Bicycle Parking
Approved
05/05/23
MHDenberg
On site revision switched to all vertical bike parking spaces. OK per KEW. -MHD
 
157 Zoning
Approved
05/05/23
MHDenberg
All parking spaces are marked Compact
 
160 Emerg Egress Light
Approved
05/18/23
RZSteiner
 
 
931 SPI Steel Construction
Approved
05/17/23
SEGalbreath
Special inspection/structural observation reports in special inspections folder for this permit
 
162 SPI Concrete Construction
Approved
05/17/23
SEGalbreath
Special inspection/structural observation reports in special inspections folder for this permit
 
176 SPI Soils
Approved
05/17/23
SEGalbreath
Special inspection/structural observation reports in special inspections folder for this permit
 
180 SPI Epoxy/Expan/Screw Anchors
Approved
05/17/23
SEGalbreath
Special inspection/structural observation reports in special inspections folder for this permit
 
941 SPI Seismic(Structural Wood)
Approved
05/17/23
SEGalbreath
Special inspection/structural observation reports in special inspections folder for this permit
 
956 SPI Sprinkler Clearance
Approved
05/17/23
SEGalbreath
Special inspection/structural observation reports in special inspections folder for this permit
 
950 Structural Observation
Approved
05/17/23
SEGalbreath
Special inspection/structural observation reports in special inspections folder for this permit
 
951 SPI Final Letter
Approved
05/17/23
SEGalbreath
Special inspection/structural observation reports in special inspections folder for this permit
 
199 Final Building
Approved
06/01/23
SEGalbreath
Pictures of handrail extensions texted
 
199 Final Building
Finaled w/Certif
06/01/23
SEGalbreath
 
Electrical
Finished
04/29/22
05/26/24
06/01/23
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
205 Temp Electrical
Approved
05/10/23
JKGoschie
 
 
210 Undergrnd/Slab Elec
Approved
05/10/23
JKGoschie
 
 
215 Electrical - Feeder
Approved
05/10/23
JKGoschie
 
 
217 Electrical Service
Approved
12/16/22
JKGoschie
EWEB at 9:19. Unit meters.
 
225 Elec Ceiling Cover
Approved
05/10/23
JKGoschie
 
 
220 Rough Electrical
Approved
12/12/22
BARichardson
Unit 102 cover
 
230 Limited Energy
Approved
05/10/23
JKGoschie
 
 
255 Emergency Generator
Approved
05/10/23
JKGoschie
 
 
299 Final Electrical
Approved
05/05/23
JKGoschie
 
Fire
Finished
04/29/22
05/26/24
06/01/23
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
849 Final Fire
Approved
05/17/23
ATBrushett
Fall protection provided on the roof hatch
Mechanical
Finished
04/29/22
05/26/24
06/01/23
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
416 Rough Gas Piping
Approved
09/30/22
SEGalbreath
Gas line from meter to gen set only. Buried at time of inspection. Installer provided information on conduit and burial depth verified. Pressure test OK @ 65psi 30min. Green tagged.
 
450 Final Gas Piping
Approved
03/20/23
JAJohannesen
 
 
420 Rough Mechanical
Approved
02/23/23
JAJohannesen
 
 
445 Fuel Burn Appliance
Approved
03/20/23
JAJohannesen
 
 
499 Final Mechanical
Approved
05/17/23
SEGalbreath
 
Plumbing
Finished
04/29/22
05/26/24
06/01/23
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
310 Sanitary Sewer
Approved
05/03/23
TSHodges
 
 
315 Storm Sewer
Approved
05/03/23
TSHodges
 
 
350 Rain Drain/Foundation Drain
Approved
03/20/23
JRLaCasse
 
 
318 Under Floor Plumb
Approved
06/10/22
SEKelley
 
 
320 Rough Plumbing
Approved
11/22/22
SEKelley
 
 
325 Water Service
Approved
08/16/22
SEKelley
60 PSI.
 
330 Shower Liner
Not Needed
10/26/22
SEKelley
Fiberglass tub/showers.
 
335 Backflow Device
Approved
03/20/23
SEKelley
 
 
399 Final Plumbing
Approved
05/05/23
JRLaCasse
 
Public Works
Finished
04/29/22
05/26/24
06/01/23
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
725 Stormwater Mgmt Facility
Approved
05/16/23
JRLaCasse
 
 
735 Stormwater Facility Planting
Approved
05/23/23
TGShriro
 
 
750 R/W Excavation
Approved
03/15/23
TSHodges
 
 
765 Sidewalk
Approved
03/15/23
JTBennett
 
 
775 Drive/Curb Cut
Approved
03/15/23
JTBennett
 
To request an inspection go to https://pdd.eugene-or.gov/BuildingPermits/InspectionLogin.
For more information call 541-682-5283.
FEES
Fees
Total Due
Amount Paid
Paid Date
Amount Due
Application
$25,000.00
$25,000.00
 
$0.00
Residential CET Revenue
$25,000.00
$25,000.00
04/29/22
$0.00
Miscellaneous Admin, State
$0.00
$0.00
04/29/22
$0.00
Building
$59,145.76
$59,145.76
 
$0.00
Building Plan Check per Applicant Value
$12,513.85
$12,513.85
03/22/22
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
04/12/23
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
04/12/23
$0.00
Supplemental Plan Check, Str. Eng.
$860.80
$860.80
04/29/22
$0.00
Supplemental Plan Check, Str. Eng.
$107.60
$107.60
04/29/22
$0.00
Fire/Life Safety Plan Check
$7,700.83
$7,700.83
04/29/22
$0.00
Fire Systems Plan Check Fee - Alarms
$220.09
$220.09
08/29/22
$0.00
Fire Systems Plan Check Fee - Sprinklers
$436.64
$436.64
06/02/22
$0.00
Fire Systems Plan Check Fee - Other
$324.08
$324.08
04/12/23
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
08/29/22
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
08/29/22
$0.00
Building Permit Fee per Bldg Div Value
$19,252.08
$19,252.08
04/29/22
$0.00
Fire System Permit Fee - Alarms
$338.60
$338.60
08/29/22
$0.00
Fire System Permit Fee - Sprinklers
$671.75
$671.75
06/02/22
$0.00
Fire System Permit Fee - Other
$498.58
$498.58
04/12/23
$0.00
Inspection Outside Normal Work Hours
$215.20
$215.20
05/16/23
$0.00
Zoning Plan Check
$8,663.44
$8,663.44
04/29/22
$0.00
Supplemental Plan Review, Zoning
$107.60
$107.60
04/29/22
$0.00
Zoning Inspection
$322.80
$322.80
04/29/22
$0.00
State Surcharge, Structural
$2,524.41
$2,524.41
04/29/22
$0.00
State Surcharge, Structural
$88.08
$88.08
06/02/22
$0.00
State Surcharge, Structural
$44.40
$44.40
08/29/22
$0.00
State Surcharge, Structural
$65.38
$65.38
04/12/23
$0.00
State Surcharge, Structural
$28.22
$28.22
05/16/23
$0.00
Building Admin Fee, Local
$29.05
$29.05
04/29/22
$0.00
Building Admin Fee, State
$1,732.69
$1,732.69
04/29/22
$0.00
Building Admin Fee, State
$60.46
$60.46
06/02/22
$0.00
Building Admin Fee, State
$30.47
$30.47
08/29/22
$0.00
Building Admin Fee, State
$44.87
$44.87
04/12/23
$0.00
Building Admin Fee, State
$19.37
$19.37
05/16/23
$0.00
Building Plan Check Admin
$1,569.62
$1,569.62
04/29/22
$0.00
Building Plan Check Admin
$39.30
$39.30
06/02/22
$0.00
Building Plan Check Admin
$58.55
$58.55
08/29/22
$0.00
Building Plan Check Admin
$38.85
$38.85
04/12/23
$0.00
Building Plan Check Admin
$0.00
$0.00
 
$0.00
Electrical
$6,853.22
$6,853.22
 
$0.00
Electric Plan Check
$1,496.69
$1,496.69
04/29/22
$0.00
200 amps or less
$390.00
$390.00
04/29/22
$0.00
201 to 400 amps
$333.00
$333.00
04/29/22
$0.00
601 to 1000 amps
$368.50
$368.50
04/29/22
$0.00
Branch Circuits w/ Feeder or Service
$331.50
$331.50
04/29/22
$0.00
Wiring Footage, 1,000 sq ft or less
$237.25
$237.25
04/29/22
$0.00
Wiring Footage, Each Add'l 500 sq ft
$1,308.00
$1,308.00
04/29/22
$0.00
Limited Energy, Multi-Family
$1,308.00
$1,308.00
04/29/22
$0.00
State Surcharge, Electrical
$560.72
$560.72
04/29/22
$0.00
Electric Plan Check Admin
$134.70
$134.70
04/29/22
$0.00
Electric Admin Fee, State
$384.86
$384.86
04/29/22
$0.00
Fire
$3,206.34
$3,206.34
 
$0.00
Fire Plan Check
$2,887.80
$2,887.80
04/29/22
$0.00
Supplemental Plan Review, Fire
$53.80
$53.80
04/29/22
$0.00
Fire Plan Check Admin
$264.74
$264.74
04/29/22
$0.00
Mechanical
$3,805.91
$3,805.91
 
$0.00
Mechanical Plan Check
$1,203.02
$1,203.02
04/29/22
$0.00
Supplemental Plan Review, Mechanical
$215.20
$215.20
04/29/22
$0.00
Mechanical Permit (Applicant Value)
$1,850.80
$1,850.80
04/29/22
$0.00
State Surcharge, Mechanical
$242.68
$242.68
04/29/22
$0.00
Mechanical Admin Fee, State
$166.57
$166.57
04/29/22
$0.00
Mechanical Plan Check Admin
$127.64
$127.64
04/29/22
$0.00
Plumbing
$7,919.37
$7,919.37
 
$0.00
Plumbing Plan Check
$1,729.52
$1,729.52
04/29/22
$0.00
Plumbing Fixtures
$4,108.50
$4,108.50
04/29/22
$0.00
Sanitary Sewer Footage
$149.25
$149.25
04/29/22
$0.00
Storm Sewer Footage
$474.25
$474.25
04/29/22
$0.00
Water Service Footage
$184.75
$184.75
04/29/22
$0.00
Backflow Prevention
$24.75
$24.75
04/29/22
$0.00
State Surcharge, Plumbing
$647.95
$647.95
04/29/22
$0.00
Plumbing Plan Check Admin
$155.66
$155.66
04/29/22
$0.00
Plumbing Admin Fee, State
$444.74
$444.74
04/29/22
$0.00
Public Works
$1,952.18
$1,952.18
 
$0.00
PW Plan Check, New Commercial
$954.75
$954.75
04/29/22
$0.00
Stormwater Mgmt Facility
$289.75
$289.75
04/29/22
$0.00
R-O-W Excavation (w/ pavement cuts)
$546.50
$546.50
04/29/22
$0.00
PW Admin, Local
$49.18
$49.18
04/29/22
$0.00
PW Plan Check Admin
$112.00
$112.00
04/29/22
$0.00
SDC
$67,020.74
$67,020.74
 
$0.00
Total All Fees
$174,903.52
$174,903.52
 
$0.00
System Development Charges By System
SDC Fees
Total Due
Amount Paid
Paid Date
Amount Due
City SDC Admin
$3,191.46
$3,191.46
 
$0.00
SDC City Admin
$3,191.46
$3,191.46
04/29/22
$0.00
City Wastewater
$5,961.98
$5,961.98
 
$0.00
RDU rate for calculation of local WW
$11,655.12
$11,655.12
04/29/22
$0.00
RDU rate for calculation of local WW
($6,798.82)
($6,798.82)
04/29/22
$0.00
Cost per SQFT local WWater living area
$2,037.39
$2,037.39
04/29/22
$0.00
Cost per SQFT local WWater living area
($931.71)
($931.71)
04/29/22
$0.00
Metropolitan Wastewater
$15,033.31
$15,033.31
 
$0.00
Single Family / Duplex
($3,628.74)
($3,628.74)
04/29/22
$0.00
Other Residential - Multi Family
$37,324.11
$37,324.11
04/29/22
$0.00
Other Residential - Multi Family
($18,662.06)
($18,662.06)
04/29/22
$0.00
Parks
$24,676.52
$24,676.52
 
$0.00
Parks Single-Family
($8,827.96)
($8,827.96)
04/29/22
$0.00
Parks Multi-Family
$67,008.96
$67,008.96
04/29/22
$0.00
Parks Multi-Family
($33,504.48)
($33,504.48)
04/29/22
$0.00
SDC Stormwater
$0.00
$0.00
 
$0.00
Impervious surface area
$3,659.95
$3,659.95
04/29/22
$0.00
Impervious surface area
($3,659.95)
($3,659.95)
04/29/22
$0.00
Transportation
$18,157.47
$18,157.47
 
$0.00
Single Family Dwelling/Duplex
($6,675.54)
($6,675.54)
04/29/22
$0.00
Apartments
$49,666.02
$49,666.02
04/29/22
$0.00
Apartments
($24,833.01)
($24,833.01)
04/29/22
$0.00
Total All SDC Fees
$67,020.74
$67,020.74
 
$0.00
Page 1 of 1
Date: 4/29/2025