| | | | | | | | | | | | | | | | | | | | | Building and Permit Services |
| | | Permit Number: 21-09848-01 |
| | | | | | | | | | | | | | | | | | | | | | | Address: 2960 WILLAMETTE ST | Project Description: 4-Story Apartment Building Units: 101-104, 201-207, 301-307, 401-406 | Application Type: | Commercial | Status: | Issued | Scope of Work: | New Apt Bldg (3+ units) | Zoning: | Limited High-Density Residential Zone | Map: | 18-03-07-11 | Tax Lot: | 09700 | Subdivision: | Alta Vista Tract | Addition: | | Lot: | 14&15 | Block: | 1 | Date Received: | 12/30/21 | # Bedrooms: | 31 | Commitment Date: | 02/15/22 | # Dwelling Units: | 24 | Ready to issue as of: | 04/29/22 | In Flood Plain: | | Project Coordinator: | Erik Swinney | Phone: | 541-682-5372 | | | Sign Standards: | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Construction Type Comments: |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | 1st Floor = 27 occupants (1:200 Gross) 2nd Floor = 28 occupants 3rd Floor = 28 occupants 4th Floor = 28 occupants |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Floor | Existing Floor Area | New Floor Area | Total Area | 1st Floor | 0 | 5275 | 5275 | 2nd Floor | 0 | 5468 | 5468 | 3rd Floor | 0 | 5468 | 5468 | 4th Floor | 0 | 5468 | 5468 |
| | | | | | Existing floor area may not be shown. |
| | | |
| | |
| | | | | | | | | | | | | | | | | | | | | Type | Contractor | Building | MEILI CONSTRUCTION | Electric | NEW REYNOLDS ELECTRIC INC | Mechanical | COMFORT FLOW HEATING | Plumbing | HCH MECHANICAL | Primary Contact | MCCLOSKEY SHANE |
| | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Plan review data displayed is the most current for each review. The applicant will receive notification of all issues needing additional information after all reviews on a project have been completed. Supplemental Information (SI) can be submitted prior to or after permit issuance. If you have any questions regarding your project, contact EFSwinney at 541-682-5372 or send email to erik.f.swinney@ci.eugene.or.us. Also note that some reviews (i.e., fire alarms, fire sprinklers) are deferred submittals and will be reviewed after original permit(s) have been issued. |
| | | | | | | | | | | | | | | | Review has not been started |
| | | | | | | | | | | | | | | | Review for individual review has been completed, waiting for a response |
| | | | | | All reviews for project have been completed, waiting for a response |
| | | | | | | | | | | | | | | | | | | | | Information only, review not approved |
| | | | | | | | | | Project cannot be approved as submitted |
| | | | For information regarding the review of your project or the commitment date for completion of review, please contact your project coordinator, EFSwinney, at erik.f.swinney@ci.eugene.or.us or by phone at 541-682-5372. |
| | | | | | | | | Plan Review | Status | Review Completion Date | Project Coordination, Application Submittal | External Wait Time | 02/16/22 | Pre Issuance Coord, Pre Issuance SI | Approved | 04/29/22 | Post Issuance Coord, Post Issuance SI | Approved | 12/21/22 | Deferred Coordination, Deferred Submittal | Approved | 05/31/23 | Building, Application Submittal | Waiting for info | 02/11/22 | Building, Pre Issuance SI | Approved | 04/29/22 | Building, Post Issuance SI | Approved | 12/21/22 | Building, Deferred Submittal | Approved | 06/30/22 | Structural, Application Submittal | Waiting for info | 02/10/22 | Structural, Pre Issuance SI | Approved | 04/19/22 | Structural, Deferred Submittal | Approved | 05/12/22 | Mechanical, Application Submittal | Waiting for info | 02/11/22 | Mechanical, Pre Issuance SI | Approved | 03/25/22 | Electrical, Application Submittal | Approved | 02/10/22 | Electrical, Pre Issuance SI | Approved | 03/25/22 | Plumbing, Application Submittal | Waiting for info | 01/11/22 | Plumbing, Pre Issuance SI | Approved | 03/08/22 | Zoning, Application Submittal | Waiting for info | 02/15/22 | Zoning, Pre Issuance SI | Waiting for info | 03/23/22 | Public Works, Application Submittal | Approved | 03/25/22 | Stormwater Standards, Application Submittal | Waiting for info | 02/16/22 | Stormwater Standards, Pre Issuance SI | Approved | 03/25/22 | Stormwater Standards, Deferred Submittal | Approved | 05/22/23 | SDC, Application Submittal | Waiting for info | 02/16/22 | SDC, Pre Issuance SI | Approved | 03/25/22 | Fire Marshal, Application Submittal | Waiting for info | 02/07/22 | Fire Marshal, Pre Issuance SI | Approved | 03/17/22 | Fire Marshal, Post Issuance SI | Approved | 08/29/22 | Erosion Prevention, Application Submittal | Approved | 03/17/22 | Fire Alarm Plans, Deferred Submittal | Approved | 06/02/22 | Fire Sprinkler Plans, Deferred Submittal | Approved | 06/01/22 |
| | |
| | | | | | | | | | | | | | PERMITS AND INSPECTIONS | Permit Type | Status | | Issued Date | Expiration Date | Completion Date | | Building | Finished | 04/29/22 | 05/26/24 | 06/01/23 | | | Inspection | Result | | Inspected | Inspector | Comment | | | 103 Footing | Approved | 05/09/23 | SEGalbreath | | | 105 Elec Rebar Ground | Approved | 06/24/22 | SEGalbreath | tagged (1) | | 108 Foundation | Approved | 05/09/23 | SEGalbreath | | | 109 Foundation Drain/Waterproofing | Approved | 03/20/23 | JAJohannesen | | | 116 Underfloor Insulation | Approved | 07/11/22 | SEGalbreath | Slab edge only | | 118 Framing | Approved | 12/19/22 | SEGalbreath | | | 117 Roof Sheathing | Approved | 09/23/22 | SEGalbreath | | | 119 Exterior Shearwall | Approved | 12/19/22 | SEGalbreath | | | 129 Interior Shearwall | Approved | 12/19/22 | SEGalbreath | | | 120 Wall/Vault Insulation | Approved | 12/19/22 | SEGalbreath | | | 130 Lath or Dry Wall | Approved | 05/09/23 | SEGalbreath | | | 131 Firestop Assemblies | Approved | 05/17/23 | SEGalbreath | | | 124 Final Insulation | Approved | 12/19/22 | SEGalbreath | | | 146 Fire Sprinklers | Approved | 05/17/23 | ATBrushett | TCE upload complete | | 147 Alarm Systems | Approved | 05/17/23 | ATBrushett | TCE upload complete | | 153 Water/Hydrant System | Approved | 05/04/23 | ATBrushett | Backflow locked FDC caps provided | | 143 Fire Regulation | Approved | 05/17/23 | ATBrushett | Fall protection provided on the roof hatch | | 150 Landscaping | Approved | 05/12/23 | MHDenberg | | | 919 Bicycle Parking | Approved | 05/05/23 | MHDenberg | On site revision switched to all vertical bike parking spaces. OK per KEW. -MHD | | 157 Zoning | Approved | 05/05/23 | MHDenberg | All parking spaces are marked Compact | | 160 Emerg Egress Light | Approved | 05/18/23 | RZSteiner | | | 931 SPI Steel Construction | Approved | 05/17/23 | SEGalbreath | Special inspection/structural observation reports in special inspections folder for this permit | | 162 SPI Concrete Construction | Approved | 05/17/23 | SEGalbreath | Special inspection/structural observation reports in special inspections folder for this permit | | 176 SPI Soils | Approved | 05/17/23 | SEGalbreath | Special inspection/structural observation reports in special inspections folder for this permit | | 180 SPI Epoxy/Expan/Screw Anchors | Approved | 05/17/23 | SEGalbreath | Special inspection/structural observation reports in special inspections folder for this permit | | 941 SPI Seismic(Structural Wood) | Approved | 05/17/23 | SEGalbreath | Special inspection/structural observation reports in special inspections folder for this permit | | 956 SPI Sprinkler Clearance | Approved | 05/17/23 | SEGalbreath | Special inspection/structural observation reports in special inspections folder for this permit | | 950 Structural Observation | Approved | 05/17/23 | SEGalbreath | Special inspection/structural observation reports in special inspections folder for this permit | | 951 SPI Final Letter | Approved | 05/17/23 | SEGalbreath | Special inspection/structural observation reports in special inspections folder for this permit | | 199 Final Building | Approved | 06/01/23 | SEGalbreath | Pictures of handrail extensions texted | | 199 Final Building | Finaled w/Certif | 06/01/23 | SEGalbreath | | Electrical | Finished | 04/29/22 | 05/26/24 | 06/01/23 | | | Inspection | Result | | Inspected | Inspector | Comment | | | 205 Temp Electrical | Approved | 05/10/23 | JKGoschie | | | 210 Undergrnd/Slab Elec | Approved | 05/10/23 | JKGoschie | | | 215 Electrical - Feeder | Approved | 05/10/23 | JKGoschie | | | 217 Electrical Service | Approved | 12/16/22 | JKGoschie | EWEB at 9:19. Unit meters. | | 225 Elec Ceiling Cover | Approved | 05/10/23 | JKGoschie | | | 220 Rough Electrical | Approved | 12/12/22 | BARichardson | Unit 102 cover | | 230 Limited Energy | Approved | 05/10/23 | JKGoschie | | | 255 Emergency Generator | Approved | 05/10/23 | JKGoschie | | | 299 Final Electrical | Approved | 05/05/23 | JKGoschie | | Fire | Finished | 04/29/22 | 05/26/24 | 06/01/23 | | | Inspection | Result | | Inspected | Inspector | Comment | | | 849 Final Fire | Approved | 05/17/23 | ATBrushett | Fall protection provided on the roof hatch | Mechanical | Finished | 04/29/22 | 05/26/24 | 06/01/23 | | | Inspection | Result | | Inspected | Inspector | Comment | | | 416 Rough Gas Piping | Approved | 09/30/22 | SEGalbreath | Gas line from meter to gen set only. Buried at time of inspection. Installer provided information on conduit and burial depth verified. Pressure test OK @ 65psi 30min. Green tagged. | | 450 Final Gas Piping | Approved | 03/20/23 | JAJohannesen | | | 420 Rough Mechanical | Approved | 02/23/23 | JAJohannesen | | | 445 Fuel Burn Appliance | Approved | 03/20/23 | JAJohannesen | | | 499 Final Mechanical | Approved | 05/17/23 | SEGalbreath | | Plumbing | Finished | 04/29/22 | 05/26/24 | 06/01/23 | | | Inspection | Result | | Inspected | Inspector | Comment | | | 310 Sanitary Sewer | Approved | 05/03/23 | TSHodges | | | 315 Storm Sewer | Approved | 05/03/23 | TSHodges | | | 350 Rain Drain/Foundation Drain | Approved | 03/20/23 | JRLaCasse | | | 318 Under Floor Plumb | Approved | 06/10/22 | SEKelley | | | 320 Rough Plumbing | Approved | 11/22/22 | SEKelley | | | 325 Water Service | Approved | 08/16/22 | SEKelley | 60 PSI. | | 330 Shower Liner | Not Needed | 10/26/22 | SEKelley | Fiberglass tub/showers. | | 335 Backflow Device | Approved | 03/20/23 | SEKelley | | | 399 Final Plumbing | Approved | 05/05/23 | JRLaCasse | | Public Works | Finished | 04/29/22 | 05/26/24 | 06/01/23 | | | Inspection | Result | | Inspected | Inspector | Comment | | | 725 Stormwater Mgmt Facility | Approved | 05/16/23 | JRLaCasse | | | 735 Stormwater Facility Planting | Approved | 05/23/23 | TGShriro | | | 750 R/W Excavation | Approved | 03/15/23 | TSHodges | | | 765 Sidewalk | Approved | 03/15/23 | JTBennett | | | 775 Drive/Curb Cut | Approved | 03/15/23 | JTBennett | |
| | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | Fees | Total Due | Amount Paid | Paid Date | Amount Due | Application | $25,000.00 | $25,000.00 | | $0.00 | Residential CET Revenue | $25,000.00 | $25,000.00 | 04/29/22 | $0.00 | Miscellaneous Admin, State | $0.00 | $0.00 | 04/29/22 | $0.00 | Building | $59,145.76 | $59,145.76 | | $0.00 | Building Plan Check per Applicant Value | $12,513.85 | $12,513.85 | 03/22/22 | $0.00 | Supplemental Plan Review, Bldg | $53.80 | $53.80 | 04/12/23 | $0.00 | Supplemental Plan Review, Bldg | $53.80 | $53.80 | 04/12/23 | $0.00 | Supplemental Plan Check, Str. Eng. | $860.80 | $860.80 | 04/29/22 | $0.00 | Supplemental Plan Check, Str. Eng. | $107.60 | $107.60 | 04/29/22 | $0.00 | Fire/Life Safety Plan Check | $7,700.83 | $7,700.83 | 04/29/22 | $0.00 | Fire Systems Plan Check Fee - Alarms | $220.09 | $220.09 | 08/29/22 | $0.00 | Fire Systems Plan Check Fee - Sprinklers | $436.64 | $436.64 | 06/02/22 | $0.00 | Fire Systems Plan Check Fee - Other | $324.08 | $324.08 | 04/12/23 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 08/29/22 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 08/29/22 | $0.00 | Building Permit Fee per Bldg Div Value | $19,252.08 | $19,252.08 | 04/29/22 | $0.00 | Fire System Permit Fee - Alarms | $338.60 | $338.60 | 08/29/22 | $0.00 | Fire System Permit Fee - Sprinklers | $671.75 | $671.75 | 06/02/22 | $0.00 | Fire System Permit Fee - Other | $498.58 | $498.58 | 04/12/23 | $0.00 | Inspection Outside Normal Work Hours | $215.20 | $215.20 | 05/16/23 | $0.00 | Zoning Plan Check | $8,663.44 | $8,663.44 | 04/29/22 | $0.00 | Supplemental Plan Review, Zoning | $107.60 | $107.60 | 04/29/22 | $0.00 | Zoning Inspection | $322.80 | $322.80 | 04/29/22 | $0.00 | State Surcharge, Structural | $2,524.41 | $2,524.41 | 04/29/22 | $0.00 | State Surcharge, Structural | $88.08 | $88.08 | 06/02/22 | $0.00 | State Surcharge, Structural | $44.40 | $44.40 | 08/29/22 | $0.00 | State Surcharge, Structural | $65.38 | $65.38 | 04/12/23 | $0.00 | State Surcharge, Structural | $28.22 | $28.22 | 05/16/23 | $0.00 | Building Admin Fee, Local | $29.05 | $29.05 | 04/29/22 | $0.00 | Building Admin Fee, State | $1,732.69 | $1,732.69 | 04/29/22 | $0.00 | Building Admin Fee, State | $60.46 | $60.46 | 06/02/22 | $0.00 | Building Admin Fee, State | $30.47 | $30.47 | 08/29/22 | $0.00 | Building Admin Fee, State | $44.87 | $44.87 | 04/12/23 | $0.00 | Building Admin Fee, State | $19.37 | $19.37 | 05/16/23 | $0.00 | Building Plan Check Admin | $1,569.62 | $1,569.62 | 04/29/22 | $0.00 | Building Plan Check Admin | $39.30 | $39.30 | 06/02/22 | $0.00 | Building Plan Check Admin | $58.55 | $58.55 | 08/29/22 | $0.00 | Building Plan Check Admin | $38.85 | $38.85 | 04/12/23 | $0.00 | Building Plan Check Admin | $0.00 | $0.00 | | $0.00 | Electrical | $6,853.22 | $6,853.22 | | $0.00 | Electric Plan Check | $1,496.69 | $1,496.69 | 04/29/22 | $0.00 | 200 amps or less | $390.00 | $390.00 | 04/29/22 | $0.00 | 201 to 400 amps | $333.00 | $333.00 | 04/29/22 | $0.00 | 601 to 1000 amps | $368.50 | $368.50 | 04/29/22 | $0.00 | Branch Circuits w/ Feeder or Service | $331.50 | $331.50 | 04/29/22 | $0.00 | Wiring Footage, 1,000 sq ft or less | $237.25 | $237.25 | 04/29/22 | $0.00 | Wiring Footage, Each Add'l 500 sq ft | $1,308.00 | $1,308.00 | 04/29/22 | $0.00 | Limited Energy, Multi-Family | $1,308.00 | $1,308.00 | 04/29/22 | $0.00 | State Surcharge, Electrical | $560.72 | $560.72 | 04/29/22 | $0.00 | Electric Plan Check Admin | $134.70 | $134.70 | 04/29/22 | $0.00 | Electric Admin Fee, State | $384.86 | $384.86 | 04/29/22 | $0.00 | Fire | $3,206.34 | $3,206.34 | | $0.00 | Fire Plan Check | $2,887.80 | $2,887.80 | 04/29/22 | $0.00 | Supplemental Plan Review, Fire | $53.80 | $53.80 | 04/29/22 | $0.00 | Fire Plan Check Admin | $264.74 | $264.74 | 04/29/22 | $0.00 | Mechanical | $3,805.91 | $3,805.91 | | $0.00 | Mechanical Plan Check | $1,203.02 | $1,203.02 | 04/29/22 | $0.00 | Supplemental Plan Review, Mechanical | $215.20 | $215.20 | 04/29/22 | $0.00 | Mechanical Permit (Applicant Value) | $1,850.80 | $1,850.80 | 04/29/22 | $0.00 | State Surcharge, Mechanical | $242.68 | $242.68 | 04/29/22 | $0.00 | Mechanical Admin Fee, State | $166.57 | $166.57 | 04/29/22 | $0.00 | Mechanical Plan Check Admin | $127.64 | $127.64 | 04/29/22 | $0.00 | Plumbing | $7,919.37 | $7,919.37 | | $0.00 | Plumbing Plan Check | $1,729.52 | $1,729.52 | 04/29/22 | $0.00 | Plumbing Fixtures | $4,108.50 | $4,108.50 | 04/29/22 | $0.00 | Sanitary Sewer Footage | $149.25 | $149.25 | 04/29/22 | $0.00 | Storm Sewer Footage | $474.25 | $474.25 | 04/29/22 | $0.00 | Water Service Footage | $184.75 | $184.75 | 04/29/22 | $0.00 | Backflow Prevention | $24.75 | $24.75 | 04/29/22 | $0.00 | State Surcharge, Plumbing | $647.95 | $647.95 | 04/29/22 | $0.00 | Plumbing Plan Check Admin | $155.66 | $155.66 | 04/29/22 | $0.00 | Plumbing Admin Fee, State | $444.74 | $444.74 | 04/29/22 | $0.00 | Public Works | $1,952.18 | $1,952.18 | | $0.00 | PW Plan Check, New Commercial | $954.75 | $954.75 | 04/29/22 | $0.00 | Stormwater Mgmt Facility | $289.75 | $289.75 | 04/29/22 | $0.00 | R-O-W Excavation (w/ pavement cuts) | $546.50 | $546.50 | 04/29/22 | $0.00 | PW Admin, Local | $49.18 | $49.18 | 04/29/22 | $0.00 | PW Plan Check Admin | $112.00 | $112.00 | 04/29/22 | $0.00 | SDC | $67,020.74 | $67,020.74 | | $0.00 | Total All Fees | $174,903.52 | $174,903.52 | | $0.00 |
| | | |
| | | | | | | | | | | | | System Development Charges By System |
| | | | | | | | | | | SDC Fees | Total Due | Amount Paid | Paid Date | Amount Due | City SDC Admin | $3,191.46 | $3,191.46 | | $0.00 | SDC City Admin | $3,191.46 | $3,191.46 | 04/29/22 | $0.00 | City Wastewater | $5,961.98 | $5,961.98 | | $0.00 | RDU rate for calculation of local WW | $11,655.12 | $11,655.12 | 04/29/22 | $0.00 | RDU rate for calculation of local WW | ($6,798.82) | ($6,798.82) | 04/29/22 | $0.00 | Cost per SQFT local WWater living area | $2,037.39 | $2,037.39 | 04/29/22 | $0.00 | Cost per SQFT local WWater living area | ($931.71) | ($931.71) | 04/29/22 | $0.00 | Metropolitan Wastewater | $15,033.31 | $15,033.31 | | $0.00 | Single Family / Duplex | ($3,628.74) | ($3,628.74) | 04/29/22 | $0.00 | Other Residential - Multi Family | $37,324.11 | $37,324.11 | 04/29/22 | $0.00 | Other Residential - Multi Family | ($18,662.06) | ($18,662.06) | 04/29/22 | $0.00 | Parks | $24,676.52 | $24,676.52 | | $0.00 | Parks Single-Family | ($8,827.96) | ($8,827.96) | 04/29/22 | $0.00 | Parks Multi-Family | $67,008.96 | $67,008.96 | 04/29/22 | $0.00 | Parks Multi-Family | ($33,504.48) | ($33,504.48) | 04/29/22 | $0.00 | SDC Stormwater | $0.00 | $0.00 | | $0.00 | Impervious surface area | $3,659.95 | $3,659.95 | 04/29/22 | $0.00 | Impervious surface area | ($3,659.95) | ($3,659.95) | 04/29/22 | $0.00 | Transportation | $18,157.47 | $18,157.47 | | $0.00 | Single Family Dwelling/Duplex | ($6,675.54) | ($6,675.54) | 04/29/22 | $0.00 | Apartments | $49,666.02 | $49,666.02 | 04/29/22 | $0.00 | Apartments | ($24,833.01) | ($24,833.01) | 04/29/22 | $0.00 | Total All SDC Fees | $67,020.74 | $67,020.74 | | $0.00 |
| | | |
| | |
| |
| |