| | | | | | | | | | | | | | | | | | | | | | | Address: 475 E BROADWAY AVE | Project Description: New apartment building with parking structure | Application Type: | Commercial | Status: | Issued | Scope of Work: | Phased Permit | Zoning: | Community Commercial District | Map: | 17-03-32-23 | Tax Lot: | 02600 | Subdivision: | | Addition: | | Lot: | | Block: | | Date Received: | 09/17/21 | # Bedrooms: | 685 | Commitment Date: | 11/19/21 | # Dwelling Units: | 246 | Ready to issue as of: | 08/23/22 | In Flood Plain: | | Project Coordinator: | Erik Swinney | Phone: | 541-682-5372 | | | Sign Standards: | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Construction Type Comments: |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Level 1 = 773 Level 2 = 324 Level 3 = 417 Level 4 = 417 Level 5 = 417 Level 6 = 228 Level 7 = 735 |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | See Sheet 07_G2.00a for Area Tabulation...
Bldg A (Constr Type/Occ)... 3A/R-2 = 181,210sf * $143.25/sf = $25,958,332
Bldg B (Constr Type/Occ)... 1A/B = 4,949sf * $212.46/sf = $1,051,464 1A/R-2 = 51567sf * 179.04/sf = $9,232,555 1A/S-2 = 99,708sf * $115.37/sf = $11,503,311 3A/R-2 = 76,990sf * $143.25/sf = $11,028,817 3A/A-3 = 8,143sf * $163.01/sf = $1,327,390
Total $60,101,869.
Phase 1 = $10,302,303 (per application) Phase 2 = $49,799,566 (difference) |
| | | | | | | | | | | | | Floor | Existing Floor Area | New Floor Area | Total Area | 1st Floor | 0 | 68727 | 68727 | 2nd Floor | 0 | 67094 | 67094 | 3rd Floor | 0 | 67688 | 67688 | 4th Floor | 0 | 67688 | 67688 | 5th Floor | 0 | 67688 | 67688 | 6th Floor | 0 | 45654 | 45654 | 7th Floor | 0 | 38028 | 38028 |
| | | | | | Existing floor area may not be shown. |
| | | |
| | |
| | | | | | | | | | | | | | | | | | | | | Type | Contractor | Building | LANDMARK URBAN CONSTRUCTION OR LLC | Electric | NEW REYNOLDS ELECTRIC INC | Mechanical | JET INDUSTRIES INC | Plumbing | HARVEY & PRICE CO | Primary Contact | HAGEROTT DONNA |
| | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Plan review data displayed is the most current for each review. The applicant will receive notification of all issues needing additional information after all reviews on a project have been completed. Supplemental Information (SI) can be submitted prior to or after permit issuance. If you have any questions regarding your project, contact EFSwinney at 541-682-5372 or send email to erik.f.swinney@ci.eugene.or.us. Also note that some reviews (i.e., fire alarms, fire sprinklers) are deferred submittals and will be reviewed after original permit(s) have been issued. |
| | | | | | | | | | | | | | | | Review has not been started |
| | | | | | | | | | | | | | | | Review for individual review has been completed, waiting for a response |
| | | | | | All reviews for project have been completed, waiting for a response |
| | | | | | | | | | | | | | | | | | | | | Information only, review not approved |
| | | | | | | | | | Project cannot be approved as submitted |
| | | | For information regarding the review of your project or the commitment date for completion of review, please contact your project coordinator, EFSwinney, at erik.f.swinney@ci.eugene.or.us or by phone at 541-682-5372. |
| | | | | | | | | Plan Review | Status | Review Completion Date | Project Coordination, Application Submittal | Approved | 02/22/22 | Pre Issuance Coord, Pre Issuance SI | Approved | 05/16/22 | Post Issuance Coord, Post Issuance SI | Approved | 10/02/24 | Deferred Coordination, Deferred Submittal | Approved | 11/20/24 | Building, Application Submittal | Approved | 01/13/23 | Building, Pre Issuance SI | Approved | 01/13/22 | Building, Post Issuance SI | Approved | 10/02/24 | Building, Deferred Submittal | Approved | 11/20/24 | Structural, Application Submittal | Waiting for info | 11/18/21 | Structural, Pre Issuance SI | Approved | 05/16/22 | Structural, Post Issuance SI | Approved | 07/22/24 | Structural, Deferred Submittal | Approved | 11/20/24 | Mechanical, Application Submittal | Information | 11/19/21 | Mechanical, Post Issuance SI | Approved | 08/07/24 | Electrical, Post Issuance SI | Approved | 11/03/22 | Plumbing, Application Submittal | Approved | 03/08/22 | Plumbing, Post Issuance SI | Approved | 08/06/24 | Zoning, Application Submittal | Approved | 11/17/21 | Zoning, Post Issuance SI | Approved | 10/02/24 | Public Works, Application Submittal | Waiting for info | 06/28/22 | Public Works, Pre Issuance SI | Approved | 02/03/22 | Public Works, Post Issuance SI | Approved | 09/30/24 | Stormwater Standards, Application Submittal | Approved | 08/26/24 | Stormwater Standards, Pre Issuance SI | Waiting for info | 01/13/22 | Stormwater Standards, Post Issuance SI | Information | 09/18/23 | Stormwater Standards, Deferred Submittal | Approved | 10/24/23 | SDC, Application Submittal | Information | | Fire Marshal, Application Submittal | Approved | 10/13/21 | Fire Marshal, Post Issuance SI | Waiting for info | 07/11/23 | Fire Marshal, Deferred Submittal | Approved | 10/16/24 | A M & M, Application Submittal | Approved | 01/13/23 | Erosion Prevention, Application Submittal | Approved | 03/18/22 | Fire Alarm Plans, Deferred Submittal | Approved | 06/08/23 | Fire Sprinkler Plans, Deferred Submittal | Approved | 05/08/23 | Water Main/Hydrant, Deferred Submittal | Approved | 10/31/22 |
| | |
| | | | | | | | | | | | | | PERMITS AND INSPECTIONS | Permit Type | Status | | Issued Date | Expiration Date | Completion Date | | Building | Finished | 04/06/22 | 11/22/25 | 11/27/24 | | | Inspection | Result | | Inspected | Inspector | Comment | | | 103 Footing | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 105 Elec Rebar Ground | Not Needed | 07/01/24 | RZSteiner | | | 108 Foundation | Approved | 10/11/24 | SEGalbreath | | | 109 Foundation Drain/Waterproofing | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 110 Structural Concrete | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 116 Underfloor Insulation | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 118 Framing | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 920 Waterproofing - Balcony or Sim | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 117 Roof Sheathing | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 119 Exterior Shearwall | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 129 Interior Shearwall | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 128 Exterior Lath | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 127 Masonry Construction | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 120 Wall/Vault Insulation | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 130 Lath or Dry Wall | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 131 Firestop Assemblies | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 121 Ceiling Grid | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 124 Final Insulation | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 146 Fire Sprinklers | Approved | 09/25/24 | ATBrushett | Need to verify that the tamper on the roof is working for final. Once this is complete final sprinkler can be approved | | 147 Alarm Systems | Approved | 11/19/24 | ATBrushett | Tampers have been addressed correctly and all other items have been taken care of | | 144 Emergency Generator | Not Needed | 10/22/24 | SEGalbreath | No emergency generator per plans | | 153 Water/Hydrant System | Approved | 11/19/24 | ATBrushett | Tampers have ben fixed and the sign provided | | 154 Standpipe | Approved | 09/25/24 | ATBrushett | | | 143 Fire Regulation | Approved | 11/26/24 | ESPhillips-Meadow | Paperwork uploaded to TCE | | 150 Landscaping | Approved | 11/22/24 | VHVallentyne | Landscaping to be installed per Sheet O5_L3.00 | | 919 Bicycle Parking | Approved | 11/26/24 | VHVallentyne | | | 157 Zoning | Approved | 10/17/24 | JTShadwick | All parking spaces marked "Compact" and sidewalk from parking structure to street along S. side of driveway. | | 160 Emerg Egress Light | Approved | 10/22/24 | SEGalbreath | Previous items were verified for TCO inspection and results were not entered under egress lighting at the time. | | 930 SPI Fabricated Items | Approved | 11/22/24 | SEGalbreath | Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed. | | 931 SPI Steel Construction | Approved | 11/22/24 | SEGalbreath | Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed. | | 162 SPI Concrete Construction | Approved | 11/22/24 | SEGalbreath | Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed. | | 172 SPI Masonry Construction | Approved | 10/28/24 | SEGalbreath | | | 176 SPI Soils | Approved | 11/22/24 | SEGalbreath | Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed. | | 174 SPI Sprayed Fireproofing | Approved | 11/22/24 | SEGalbreath | Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed. | | 181 SPI Fire-resist. Penetations | Approved | 10/28/24 | SEGalbreath | Inspection added by SEG for joint assembly at CMU walls to structure (garage and turn-down areas) Carlson reports on file | | 180 SPI Epoxy/Expan/Screw Anchors | Approved | 11/22/24 | SEGalbreath | Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed. | | 940 SPI Seismic(Structural Steel) | Approved | 11/22/24 | SEGalbreath | Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed. | | 941 SPI Seismic(Structural Wood) | Approved | 11/22/24 | SEGalbreath | Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed. | | 944 SPI Seismic(Arch Components) | Approved | 11/22/24 | SEGalbreath | Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed. | | 945 SPI Anchorage/Emergency Power | Not Needed | 11/22/24 | SEGalbreath | No emergency power generator | | 955 SPI Anchorage/Vibration Isoltn | Approved | 11/22/24 | SEGalbreath | Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed. | | 956 SPI Sprinkler Clearance | Approved | 10/28/24 | SEGalbreath | Carlson on file | | 178 SPI Additional Inspections | Approved | 11/22/24 | SEGalbreath | Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed. | | 950 Structural Observation | Approved | 11/22/24 | SEGalbreath | On file | | 951 SPI Final Letter | Approved | 11/22/24 | SEGalbreath | Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed. | | 199 Final Building | Approved | 11/27/24 | SEGalbreath | | Electrical | Finished | 08/23/22 | 11/22/25 | 11/27/24 | | | Inspection | Result | | Inspected | Inspector | Comment | | | 210 Undergrnd/Slab Elec | Approved | 08/29/24 | JKGoschie | | | 215 Electrical - Feeder | Approved | 08/29/24 | JKGoschie | | | 217 Electrical Service | Approved | 08/29/24 | JKGoschie | | | 213 Bonding/Grounding | Approved | 08/29/24 | JKGoschie | | | 225 Elec Ceiling Cover | Approved | 08/29/24 | JKGoschie | | | 220 Rough Electrical | Approved | 08/29/24 | JKGoschie | | | 230 Limited Energy | Approved | 08/29/24 | JKGoschie | | | 299 Final Electrical | Approved | 10/07/24 | JKGoschie | | Fire | Finished | 04/06/22 | 11/22/25 | 11/27/24 | | | Inspection | Result | | Inspected | Inspector | Comment | | | 849 Final Fire | Approved | 11/26/24 | ESPhillips-Meadow | Paperwork uploaded to TCE | Mechanical | Finished | 08/15/22 | 11/22/25 | 11/27/24 | | | Inspection | Result | | Inspected | Inspector | Comment | | | 416 Rough Gas Piping | Approved | 08/09/24 | SEGalbreath | Green tagged | | 450 Final Gas Piping | Approved | 11/27/24 | SEGalbreath | | | 420 Rough Mechanical | Approved | 10/11/24 | SEGalbreath | Per best information available work has been previously inspected and any noted deficiencies have been corrected. | | 499 Final Mechanical | Approved | 11/27/24 | SEGalbreath | | Plumbing | Finished | 04/06/22 | 11/22/25 | 11/27/24 | | | Inspection | Result | | Inspected | Inspector | Comment | | | 310 Sanitary Sewer | Reviewed | 07/28/22 | TSHodges | Started construction of public waste manhole. Contractor is building a pour in place manhole. Needs to locate some pipe parts. | | 402 Sanitary Sewer - Private | Approved | 08/14/24 | SEKelley | | | 310 Sanitary Sewer | Reviewed | 07/29/22 | JRLaCasse | Were not ready on first visit-Pictures okay for MH base-sand collars were used | | 310 Sanitary Sewer | Reviewed | 08/01/22 | TSHodges | Need air or water test on waste lateral, set riser clean out inside approved cover and finish new public manhole. | | 315 Storm Sewer | Reviewed | 06/27/22 | JRLaCasse | Tie in to existing catch basin-marked plans | | 315 Storm Sewer | Reviewed | 06/28/22 | JRLaCasse | 8" connection stubbed to back of sidewalk to public 24" concrete storm line in middle of street-marked outdated plans | | 315 Storm Sewer | Reviewed | 10/10/22 | JRLaCasse | eastside of courtyard-marked plans | | 315 Storm Sewer | Reviewed | 10/12/22 | TSHodges | Marked plans | | 315 Storm Sewer | Reviewed | 10/13/22 | TSHodges | Marked plans | | 315 Storm Sewer | Reviewed | 11/02/22 | TSHodges | Making connection into public catch basin. | | 315 Storm Sewer | Reviewed | 11/07/22 | TSHodges | Cleanout required on 10" storm in courtyard near GL - 4. SEK | | 315 Storm Sewer | Reviewed | 11/08/22 | TSHodges | Marked plans. | | 315 Storm Sewer | Reviewed | 02/03/23 | LXNgariki | 8" storm line run that connects to public system with 6" directional CO riser and tracer wire. Marked on plans (NE corner of building) | | 315 Storm Sewer | Reviewed | 07/17/23 | JRLaCasse | SD AD #1, marked plans | | 403 Storm Sewer - Private | Approved | 11/22/24 | SEKelley | Area drain for dog run that was draining to storm sewer has been removed. | | 318 Under Floor Plumb | Approved | 01/05/23 | SEKelley | | | 320 Rough Plumbing | Approved | 06/21/24 | SEKelley | | | 325 Water Service | Approved | 04/03/23 | SEKelley | 4" ductile iron from EWEB meter to 6" ductile iron building supply. Air test ok, ok to cover. | | 330 Shower Liner | Cancelled | 08/16/24 | SEKelley | Needed Final. | | 330 Shower Liner | Not Needed | 09/11/24 | SEKelley | No tile showers. | | 335 Backflow Device | Approved | 09/11/24 | SEKelley | Backflow test reports received. | | 399 Final Plumbing | Approved | 11/25/24 | SEKelley | Received photos of correction. | Public Works | Finished | 04/06/22 | 11/22/25 | 11/27/24 | | | Inspection | Result | | Inspected | Inspector | Comment | | | 725 Stormwater Mgmt Facility | Approved | 10/21/24 | GEReynolds | | | 735 Stormwater Facility Planting | Approved | 10/21/24 | JTKlinko | | | 400 Sanitary Sewer - Public | Approved | 08/14/24 | JRLaCasse | | | 401 Storm Sewer - Public | Approved | 11/26/24 | JRLaCasse | | | 750 R/W Excavation | Approved | 11/26/24 | JRLaCasse | | | 765 Sidewalk | Approved | 09/04/24 | SEGalbreath | Newly poured sidewalks appear OK | | 775 Drive/Curb Cut | Approved | 09/04/24 | SEGalbreath | | | 799 Final Public Works | Approved | 11/26/24 | JRLaCasse | |
| | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | Fees | Total Due | Amount Paid | Paid Date | Amount Due | Building | $120,232.56 | $120,232.56 | | $0.00 | Temporary Certificate of Occupancy | $365.00 | $365.00 | 09/04/24 | $0.00 | Renew Temp Certificate of Occupancy | $365.00 | $365.00 | 10/04/24 | $0.00 | Renew Temp Certificate of Occupancy | $365.00 | $365.00 | 11/01/24 | $0.00 | Building Plan Check per Applicant Value | $25,474.38 | $25,474.38 | 04/06/22 | $0.00 | Supplemental Plan Review, Bldg | $53.80 | $53.80 | 04/06/22 | $0.00 | Supplemental Plan Review, Bldg | $161.40 | $161.40 | 04/20/23 | $0.00 | Supplemental Plan Review, Bldg | $107.60 | $107.60 | 04/20/23 | $0.00 | Supplemental Plan Review, Bldg | $21.52 | $21.52 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $21.52 | $21.52 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $21.52 | $21.52 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $21.52 | $21.52 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $21.52 | $21.52 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $21.52 | $21.52 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $21.52 | $21.52 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Review, Bldg | $107.60 | $107.60 | 08/22/24 | $0.00 | Supplemental Plan Review, Bldg | $21.52 | $21.52 | 08/22/24 | $0.00 | Supplemental Plan Review, Bldg | $21.52 | $21.52 | 08/22/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $860.80 | $860.80 | 04/06/22 | $0.00 | Supplemental Plan Check, Str. Eng. | $322.80 | $322.80 | 04/06/22 | $0.00 | Supplemental Plan Check, Str. Eng. | $215.20 | $215.20 | 04/20/23 | $0.00 | Supplemental Plan Check, Str. Eng. | $107.60 | $107.60 | 04/20/23 | $0.00 | Supplemental Plan Check, Str. Eng. | $161.40 | $161.40 | 04/20/23 | $0.00 | Supplemental Plan Check, Str. Eng. | $322.80 | $322.80 | 04/20/23 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 04/20/23 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 05/11/23 | $0.00 | Supplemental Plan Check, Str. Eng. | $322.80 | $322.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $107.60 | $107.60 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $107.60 | $107.60 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $107.60 | $107.60 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $161.40 | $161.40 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $80.70 | $80.70 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $53.80 | $53.80 | 07/03/24 | $0.00 | Supplemental Plan Check, Str. Eng. | $26.90 | $26.90 | 08/22/24 | $0.00 | Seismic Hazard Fee | $646.66 | $646.66 | 04/06/22 | $0.00 | Phased Permit Base Fee | $335.00 | $335.00 | 04/06/22 | $0.00 | Phased Permit Coordination Fee | $1,500.00 | $1,500.00 | 04/06/22 | $0.00 | Fire Systems Plan Check Fee - Alarms | $611.57 | $611.57 | 07/03/24 | $0.00 | Fire Systems Plan Check Fee - Sprinklers | $2,737.85 | $2,737.85 | 07/03/24 | $0.00 | Fire Systems Plan Check Fee - Other | $324.08 | $324.08 | 04/20/23 | $0.00 | Deferred Submittal Plan Check | $387.41 | $387.41 | 07/12/22 | $0.00 | Deferred Submittal Plan Check | $1,657.17 | $1,657.17 | 08/16/22 | $0.00 | Deferred Submittal Plan Check | $337.49 | $337.49 | 04/20/23 | $0.00 | Deferred Submittal Plan Check | $350.29 | $350.29 | 04/20/23 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 04/20/23 | $0.00 | Deferred Submittal Plan Check | $286.29 | $286.29 | 04/20/23 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 04/20/23 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 04/20/23 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 04/20/23 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 05/11/23 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 07/03/24 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 07/03/24 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 07/03/24 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 07/03/24 | $0.00 | Deferred Submittal Plan Check | $286.29 | $286.29 | 07/03/24 | $0.00 | Deferred Submittal Plan Check | $247.89 | $247.89 | 07/03/24 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 07/03/24 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 07/03/24 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 07/03/24 | $0.00 | Deferred Submittal Plan Check | $311.89 | $311.89 | 07/03/24 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 08/22/24 | $0.00 | Deferred Submittal Plan Check | $215.25 | $215.25 | 11/20/24 | $0.00 | Building Permit Fee per Bldg Div Value | $39,191.36 | $39,191.36 | 04/06/22 | $0.00 | Fire System Permit Fee - Alarms | $940.88 | $940.88 | 07/03/24 | $0.00 | Fire System Permit Fee - Sprinklers | $4,212.08 | $4,212.08 | 07/03/24 | $0.00 | Fire System Permit Fee - Other | $498.58 | $498.58 | 04/20/23 | $0.00 | Inspection Outside Normal Work Hours | $215.20 | $215.20 | 09/03/24 | $0.00 | Zoning Plan Check | $17,636.11 | $17,636.11 | 04/06/22 | $0.00 | Supplemental Plan Review, Zoning | $32.28 | $32.28 | 07/03/24 | $0.00 | Supplemental Plan Review, Zoning | $21.52 | $21.52 | 10/04/24 | $0.00 | State Surcharge, Structural | $5,040.97 | $5,040.97 | 04/06/22 | $0.00 | State Surcharge, Structural | $59.83 | $59.83 | 04/20/23 | $0.00 | State Surcharge, Structural | $618.36 | $618.36 | 07/03/24 | $0.00 | State Surcharge, Structural | $25.82 | $25.82 | 09/03/24 | $0.00 | State Surcharge, Structural | $43.80 | $43.80 | 09/04/24 | $0.00 | State Surcharge, Structural | $43.80 | $43.80 | 10/04/24 | $0.00 | State Surcharge, Structural | $43.80 | $43.80 | 11/01/24 | $0.00 | Building Plan Check Admin | $4,127.41 | $4,127.41 | 04/06/22 | $0.00 | Building Plan Check Admin | $0.00 | $0.00 | 08/22/24 | $0.00 | Building Plan Check Admin | $0.00 | $0.00 | 09/04/24 | $0.00 | Building Plan Check Admin | $0.00 | $0.00 | | $0.00 | Building Admin Fee, State | $2,734.72 | $2,734.72 | 04/06/22 | $0.00 | Building Admin Fee, State | $0.00 | $0.00 | 08/22/24 | $0.00 | Building Admin Fee, State | $0.00 | $0.00 | 09/04/24 | $0.00 | Building Admin Fee, State | $0.00 | $0.00 | | $0.00 | Electrical | $216.35 | $216.35 | | $0.00 | Supplemental Plan Check, Electrical | $107.60 | $107.60 | 04/20/23 | $0.00 | Minimum Permit Fee | $97.10 | $97.10 | 04/20/23 | $0.00 | State Surcharge, Electrical | $11.65 | $11.65 | 04/20/23 | $0.00 | Fire | $5,932.45 | $5,932.45 | | $0.00 | Fire Plan Check | $5,878.65 | $5,878.65 | 04/06/22 | $0.00 | Supplemental Plan Review, Fire | $53.80 | $53.80 | 11/01/24 | $0.00 | Fire Plan Check Admin | $0.00 | $0.00 | 04/06/22 | $0.00 | Fire Plan Check Admin | $0.00 | $0.00 | | $0.00 | Mechanical | $53.80 | $53.80 | | $0.00 | Supplemental Plan Review, Mechanical | $53.80 | $53.80 | 05/11/23 | $0.00 | Plumbing | $3,173.87 | $3,173.87 | | $0.00 | Plumbing Plan Check | $381.33 | $381.33 | 04/06/22 | $0.00 | Supplemental Plan Review, Plumbing | $107.60 | $107.60 | 07/12/22 | $0.00 | Supplemental Plan Review, Plumbing | $53.80 | $53.80 | 04/20/23 | $0.00 | Supplemental Plan Review, Plumbing | $21.52 | $21.52 | 08/22/24 | $0.00 | Plumbing Fixtures | $49.50 | $49.50 | 04/06/22 | $0.00 | Plumbing Fixtures | $717.75 | $717.75 | 07/12/22 | $0.00 | Plumbing Fixtures | $49.50 | $49.50 | 04/20/23 | $0.00 | Sanitary Sewer Footage | $149.25 | $149.25 | 04/06/22 | $0.00 | Storm Sewer Footage | $734.25 | $734.25 | 04/06/22 | $0.00 | Storm Sewer Footage | $344.25 | $344.25 | 07/12/22 | $0.00 | Water Service Footage | $119.75 | $119.75 | 04/06/22 | $0.00 | Removal, Abandonment, Cap of Fixture | $36.75 | $36.75 | 04/06/22 | $0.00 | State Surcharge, Plumbing | $142.86 | $142.86 | 04/06/22 | $0.00 | State Surcharge, Plumbing | $127.44 | $127.44 | 07/12/22 | $0.00 | State Surcharge, Plumbing | $5.94 | $5.94 | 04/20/23 | $0.00 | Plumbing Plan Check Admin | $34.32 | $34.32 | 04/06/22 | $0.00 | Plumbing Plan Check Admin | $0.00 | $0.00 | 08/22/24 | $0.00 | Plumbing Admin Fee, State | $98.06 | $98.06 | 04/06/22 | $0.00 | Plumbing Admin Fee, State | $0.00 | $0.00 | 08/22/24 | $0.00 | Public Works | $6,251.11 | $6,251.11 | | $0.00 | PW Plan Check, New Commercial | $954.75 | $954.75 | 04/06/22 | $0.00 | Stormwater Mgmt Facility | $289.75 | $289.75 | 04/06/22 | $0.00 | Supplemental Plan Review, Public Works | $53.80 | $53.80 | 08/22/24 | $0.00 | Supplemental Plan Review, Public Works | $21.52 | $21.52 | 08/22/24 | $0.00 | Supplemental Plan Review, Public Works | $53.80 | $53.80 | 09/03/24 | $0.00 | R-O-W Excavation (w/ pavement cuts) | $4,372.00 | $4,372.00 | 04/06/22 | $0.00 | PW Plan Check Admin | $112.01 | $112.01 | 04/06/22 | $0.00 | PW Plan Check Admin | $0.00 | $0.00 | 08/22/24 | $0.00 | PW Plan Check Admin | $0.00 | $0.00 | 09/04/24 | $0.00 | PW Admin, Local | $393.48 | $393.48 | 04/06/22 | $0.00 | Total All Fees | $135,860.14 | $135,860.14 | | $0.00 |
| | | |
| | | |
| |
| |