City of Eugene
Planning & Development
Building and Permit Services
Permit Number: 21-07253-01
Date: 6/1/2025
Address: 475 E BROADWAY AVE
Project Description: New apartment building with parking structure
Application Type:
Commercial
Status:
Issued
Scope of Work:
Phased Permit
Zoning:
Community Commercial District
Map:
17-03-32-23
Tax Lot:
02600
Subdivision:
Addition:
Lot:
Block:
Date Received:
09/17/21
# Bedrooms:
685
Commitment Date:
11/19/21
# Dwelling Units:
246
Ready to issue as of:
08/23/22
In Flood Plain:
Project Coordinator:
Erik Swinney
Phone:
541-682-5372
  
Sign Standards:
 
BUILDING CHARACTERISTICS
Construction Types:
1AS
Construction Type Comments:
3AS
 
OccupancyTypes:
R2
 
Occupancy Type Comments:
A3
 
Level 1 = 773
Level 2 = 324
Level 3 = 417
Level 4 = 417
Level 5 = 417
Level 6 = 228
Level 7 = 735
B
 
S2
Parking Garage (Open)
Occupancy Load:
3311
Separated Building:
Yes
Fire Sprinklers:
Yes Required
NFPA 13
Fire Alarms:
Yes Required
 
Building Area:
422567
Number of Stories:
7
Comment:
See Sheet 07_G2.00a for Area Tabulation...

Bldg A (Constr Type/Occ)...
3A/R-2 = 181,210sf * $143.25/sf = $25,958,332

Bldg B (Constr Type/Occ)...
1A/B = 4,949sf * $212.46/sf = $1,051,464
1A/R-2 = 51567sf * 179.04/sf = $9,232,555
1A/S-2 = 99,708sf * $115.37/sf = $11,503,311
3A/R-2 = 76,990sf * $143.25/sf = $11,028,817
3A/A-3 = 8,143sf * $163.01/sf = $1,327,390

Total $60,101,869.

Phase 1 = $10,302,303 (per application)
Phase 2 = $49,799,566 (difference)
Floor Areas (sq ft):
Floor
Existing Floor Area
New Floor Area
Total Area
1st Floor
0
68727
68727
2nd Floor
0
67094
67094
3rd Floor
0
67688
67688
4th Floor
0
67688
67688
5th Floor
0
67688
67688
6th Floor
0
45654
45654
7th Floor
0
38028
38028
Existing floor area may not be shown.
CONTRACTOR DATA
Type
Contractor
Building
LANDMARK URBAN CONSTRUCTION OR LLC
Electric
NEW REYNOLDS ELECTRIC INC
Mechanical
JET INDUSTRIES INC
Plumbing
HARVEY & PRICE CO
Primary Contact
HAGEROTT DONNA
PLAN REVIEW SUMMARY
Plan review data displayed is the most current for each review. The applicant will receive notification of all issues needing additional information after all reviews on a project have been completed. Supplemental Information (SI) can be submitted prior to or after permit issuance. If you have any questions regarding your project, contact EFSwinney at 541-682-5372 or send email to erik.f.swinney@ci.eugene.or.us. Also note that some reviews (i.e., fire alarms, fire sprinklers) are deferred submittals and will be reviewed after original permit(s) have been issued.
Status Definitions
Pending
=
Review has not been started
Review
=
Under review
Waiting
=
Review for individual review has been completed, waiting for a response
External Wait
=
All reviews for project have been completed, waiting for a response
Approved
=
Review has been approved
Information
=
Information only, review not approved
Denied
=
Project cannot be approved as submitted
For information regarding the review of your project or the commitment date for completion of review, please contact your project coordinator, EFSwinney, at erik.f.swinney@ci.eugene.or.us or by phone at 541-682-5372.
Plan Review
Status
Review Completion Date
Project Coordination, Application Submittal
Approved
02/22/22
Pre Issuance Coord, Pre Issuance SI
Approved
05/16/22
Post Issuance Coord, Post Issuance SI
Approved
10/02/24
Deferred Coordination, Deferred Submittal
Approved
11/20/24
Building, Application Submittal
Approved
01/13/23
Building, Pre Issuance SI
Approved
01/13/22
Building, Post Issuance SI
Approved
10/02/24
Building, Deferred Submittal
Approved
11/20/24
Structural, Application Submittal
Waiting for info
11/18/21
Structural, Pre Issuance SI
Approved
05/16/22
Structural, Post Issuance SI
Approved
07/22/24
Structural, Deferred Submittal
Approved
11/20/24
Mechanical, Application Submittal
Information
11/19/21
Mechanical, Post Issuance SI
Approved
08/07/24
Electrical, Post Issuance SI
Approved
11/03/22
Plumbing, Application Submittal
Approved
03/08/22
Plumbing, Post Issuance SI
Approved
08/06/24
Zoning, Application Submittal
Approved
11/17/21
Zoning, Post Issuance SI
Approved
10/02/24
Public Works, Application Submittal
Waiting for info
06/28/22
Public Works, Pre Issuance SI
Approved
02/03/22
Public Works, Post Issuance SI
Approved
09/30/24
Stormwater Standards, Application Submittal
Approved
08/26/24
Stormwater Standards, Pre Issuance SI
Waiting for info
01/13/22
Stormwater Standards, Post Issuance SI
Information
09/18/23
Stormwater Standards, Deferred Submittal
Approved
10/24/23
SDC, Application Submittal
Information
 
Fire Marshal, Application Submittal
Approved
10/13/21
Fire Marshal, Post Issuance SI
Waiting for info
07/11/23
Fire Marshal, Deferred Submittal
Approved
10/16/24
A M & M, Application Submittal
Approved
01/13/23
Erosion Prevention, Application Submittal
Approved
03/18/22
Fire Alarm Plans, Deferred Submittal
Approved
06/08/23
Fire Sprinkler Plans, Deferred Submittal
Approved
05/08/23
Water Main/Hydrant, Deferred Submittal
Approved
10/31/22
PERMITS AND INSPECTIONS
Permit Type
Status
 
Issued Date
Expiration Date
Completion Date
 
Building
Finished
04/06/22
11/22/25
11/27/24
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
103 Footing
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
105 Elec Rebar Ground
Not Needed
07/01/24
RZSteiner
 
 
108 Foundation
Approved
10/11/24
SEGalbreath
 
 
109 Foundation Drain/Waterproofing
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
110 Structural Concrete
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
116 Underfloor Insulation
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
118 Framing
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
920 Waterproofing - Balcony or Sim
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
117 Roof Sheathing
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
119 Exterior Shearwall
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
129 Interior Shearwall
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
128 Exterior Lath
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
127 Masonry Construction
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
120 Wall/Vault Insulation
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
130 Lath or Dry Wall
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
131 Firestop Assemblies
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
121 Ceiling Grid
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
124 Final Insulation
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
146 Fire Sprinklers
Approved
09/25/24
ATBrushett
Need to verify that the tamper on the roof is working for final. Once this is complete final sprinkler can be approved
 
147 Alarm Systems
Approved
11/19/24
ATBrushett
Tampers have been addressed correctly and all other items have been taken care of
 
144 Emergency Generator
Not Needed
10/22/24
SEGalbreath
No emergency generator per plans
 
153 Water/Hydrant System
Approved
11/19/24
ATBrushett
Tampers have ben fixed and the sign provided
 
154 Standpipe
Approved
09/25/24
ATBrushett
 
 
143 Fire Regulation
Approved
11/26/24
ESPhillips-Meadow
Paperwork uploaded to TCE
 
150 Landscaping
Approved
11/22/24
VHVallentyne
Landscaping to be installed per Sheet O5_L3.00
 
919 Bicycle Parking
Approved
11/26/24
VHVallentyne
 
 
157 Zoning
Approved
10/17/24
JTShadwick
All parking spaces marked "Compact" and sidewalk from parking structure to street along S. side of driveway.
 
160 Emerg Egress Light
Approved
10/22/24
SEGalbreath
Previous items were verified for TCO inspection and results were not entered under egress lighting at the time.
 
930 SPI Fabricated Items
Approved
11/22/24
SEGalbreath
Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed.
 
931 SPI Steel Construction
Approved
11/22/24
SEGalbreath
Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed.
 
162 SPI Concrete Construction
Approved
11/22/24
SEGalbreath
Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed.
 
172 SPI Masonry Construction
Approved
10/28/24
SEGalbreath
 
 
176 SPI Soils
Approved
11/22/24
SEGalbreath
Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed.
 
174 SPI Sprayed Fireproofing
Approved
11/22/24
SEGalbreath
Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed.
 
181 SPI Fire-resist. Penetations
Approved
10/28/24
SEGalbreath
Inspection added by SEG for joint assembly at CMU walls to structure (garage and turn-down areas)
Carlson reports on file
 
180 SPI Epoxy/Expan/Screw Anchors
Approved
11/22/24
SEGalbreath
Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed.
 
940 SPI Seismic(Structural Steel)
Approved
11/22/24
SEGalbreath
Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed.
 
941 SPI Seismic(Structural Wood)
Approved
11/22/24
SEGalbreath
Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed.
 
944 SPI Seismic(Arch Components)
Approved
11/22/24
SEGalbreath
Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed.
 
945 SPI Anchorage/Emergency Power
Not Needed
11/22/24
SEGalbreath
No emergency power generator
 
955 SPI Anchorage/Vibration Isoltn
Approved
11/22/24
SEGalbreath
Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed.
 
956 SPI Sprinkler Clearance
Approved
10/28/24
SEGalbreath
Carlson on file
 
178 SPI Additional Inspections
Approved
11/22/24
SEGalbreath
Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed.
 
950 Structural Observation
Approved
11/22/24
SEGalbreath
On file
 
951 SPI Final Letter
Approved
11/22/24
SEGalbreath
Based on best information from reviewing special inspection reports and final summary reports from Terracon and Carlson testing, as well as E.O.R required special inspections have been performed.
 
199 Final Building
Approved
11/27/24
SEGalbreath
 
Electrical
Finished
08/23/22
11/22/25
11/27/24
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
210 Undergrnd/Slab Elec
Approved
08/29/24
JKGoschie
 
 
215 Electrical - Feeder
Approved
08/29/24
JKGoschie
 
 
217 Electrical Service
Approved
08/29/24
JKGoschie
 
 
213 Bonding/Grounding
Approved
08/29/24
JKGoschie
 
 
225 Elec Ceiling Cover
Approved
08/29/24
JKGoschie
 
 
220 Rough Electrical
Approved
08/29/24
JKGoschie
 
 
230 Limited Energy
Approved
08/29/24
JKGoschie
 
 
299 Final Electrical
Approved
10/07/24
JKGoschie
 
Fire
Finished
04/06/22
11/22/25
11/27/24
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
849 Final Fire
Approved
11/26/24
ESPhillips-Meadow
Paperwork uploaded to TCE
Mechanical
Finished
08/15/22
11/22/25
11/27/24
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
416 Rough Gas Piping
Approved
08/09/24
SEGalbreath
Green tagged
 
450 Final Gas Piping
Approved
11/27/24
SEGalbreath
 
 
420 Rough Mechanical
Approved
10/11/24
SEGalbreath
Per best information available work has been previously inspected and any noted deficiencies have been corrected.
 
499 Final Mechanical
Approved
11/27/24
SEGalbreath
 
Plumbing
Finished
04/06/22
11/22/25
11/27/24
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
310 Sanitary Sewer
Reviewed
07/28/22
TSHodges
Started construction of public waste manhole. Contractor is building a pour in place manhole. Needs to locate some pipe parts.
 
402 Sanitary Sewer - Private
Approved
08/14/24
SEKelley
 
 
310 Sanitary Sewer
Reviewed
07/29/22
JRLaCasse
Were not ready on first visit-Pictures okay for MH base-sand collars were used
 
310 Sanitary Sewer
Reviewed
08/01/22
TSHodges
Need air or water test on waste lateral, set riser clean out inside approved cover and finish new public manhole.
 
315 Storm Sewer
Reviewed
06/27/22
JRLaCasse
Tie in to existing catch basin-marked plans
 
315 Storm Sewer
Reviewed
06/28/22
JRLaCasse
8" connection stubbed to back of sidewalk to public 24" concrete storm line in middle of street-marked outdated plans
 
315 Storm Sewer
Reviewed
10/10/22
JRLaCasse
eastside of courtyard-marked plans
 
315 Storm Sewer
Reviewed
10/12/22
TSHodges
Marked plans
 
315 Storm Sewer
Reviewed
10/13/22
TSHodges
Marked plans
 
315 Storm Sewer
Reviewed
11/02/22
TSHodges
Making connection into public catch basin.
 
315 Storm Sewer
Reviewed
11/07/22
TSHodges
Cleanout required on 10" storm in courtyard near GL - 4. SEK
 
315 Storm Sewer
Reviewed
11/08/22
TSHodges
Marked plans.
 
315 Storm Sewer
Reviewed
02/03/23
LXNgariki
8" storm line run that connects to public system with 6" directional CO riser and tracer wire. Marked on plans (NE corner of building)
 
315 Storm Sewer
Reviewed
07/17/23
JRLaCasse
SD AD #1, marked plans
 
403 Storm Sewer - Private
Approved
11/22/24
SEKelley
Area drain for dog run that was draining to storm sewer has been removed.
 
318 Under Floor Plumb
Approved
01/05/23
SEKelley
 
 
320 Rough Plumbing
Approved
06/21/24
SEKelley
 
 
325 Water Service
Approved
04/03/23
SEKelley
4" ductile iron from EWEB meter to 6" ductile iron building supply. Air test ok, ok to cover.
 
330 Shower Liner
Cancelled
08/16/24
SEKelley
Needed Final.
 
330 Shower Liner
Not Needed
09/11/24
SEKelley
No tile showers.
 
335 Backflow Device
Approved
09/11/24
SEKelley
Backflow test reports received.
 
399 Final Plumbing
Approved
11/25/24
SEKelley
Received photos of correction.
Public Works
Finished
04/06/22
11/22/25
11/27/24
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
725 Stormwater Mgmt Facility
Approved
10/21/24
GEReynolds
 
 
735 Stormwater Facility Planting
Approved
10/21/24
JTKlinko
 
 
400 Sanitary Sewer - Public
Approved
08/14/24
JRLaCasse
 
 
401 Storm Sewer - Public
Approved
11/26/24
JRLaCasse
 
 
750 R/W Excavation
Approved
11/26/24
JRLaCasse
 
 
765 Sidewalk
Approved
09/04/24
SEGalbreath
Newly poured sidewalks appear OK
 
775 Drive/Curb Cut
Approved
09/04/24
SEGalbreath
 
 
799 Final Public Works
Approved
11/26/24
JRLaCasse
 
To request an inspection go to https://pdd.eugene-or.gov/BuildingPermits/InspectionLogin.
For more information call 541-682-5283.
FEES
Fees
Total Due
Amount Paid
Paid Date
Amount Due
Building
$120,232.56
$120,232.56
 
$0.00
Temporary Certificate of Occupancy
$365.00
$365.00
09/04/24
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
10/04/24
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
11/01/24
$0.00
Building Plan Check per Applicant Value
$25,474.38
$25,474.38
04/06/22
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
04/06/22
$0.00
Supplemental Plan Review, Bldg
$161.40
$161.40
04/20/23
$0.00
Supplemental Plan Review, Bldg
$107.60
$107.60
04/20/23
$0.00
Supplemental Plan Review, Bldg
$21.52
$21.52
07/03/24
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Review, Bldg
$21.52
$21.52
07/03/24
$0.00
Supplemental Plan Review, Bldg
$21.52
$21.52
07/03/24
$0.00
Supplemental Plan Review, Bldg
$21.52
$21.52
07/03/24
$0.00
Supplemental Plan Review, Bldg
$21.52
$21.52
07/03/24
$0.00
Supplemental Plan Review, Bldg
$21.52
$21.52
07/03/24
$0.00
Supplemental Plan Review, Bldg
$21.52
$21.52
07/03/24
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Review, Bldg
$107.60
$107.60
08/22/24
$0.00
Supplemental Plan Review, Bldg
$21.52
$21.52
08/22/24
$0.00
Supplemental Plan Review, Bldg
$21.52
$21.52
08/22/24
$0.00
Supplemental Plan Check, Str. Eng.
$860.80
$860.80
04/06/22
$0.00
Supplemental Plan Check, Str. Eng.
$322.80
$322.80
04/06/22
$0.00
Supplemental Plan Check, Str. Eng.
$215.20
$215.20
04/20/23
$0.00
Supplemental Plan Check, Str. Eng.
$107.60
$107.60
04/20/23
$0.00
Supplemental Plan Check, Str. Eng.
$161.40
$161.40
04/20/23
$0.00
Supplemental Plan Check, Str. Eng.
$322.80
$322.80
04/20/23
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
04/20/23
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
05/11/23
$0.00
Supplemental Plan Check, Str. Eng.
$322.80
$322.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$107.60
$107.60
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$107.60
$107.60
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$107.60
$107.60
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$161.40
$161.40
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$80.70
$80.70
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
07/03/24
$0.00
Supplemental Plan Check, Str. Eng.
$26.90
$26.90
08/22/24
$0.00
Seismic Hazard Fee
$646.66
$646.66
04/06/22
$0.00
Phased Permit Base Fee
$335.00
$335.00
04/06/22
$0.00
Phased Permit Coordination Fee
$1,500.00
$1,500.00
04/06/22
$0.00
Fire Systems Plan Check Fee - Alarms
$611.57
$611.57
07/03/24
$0.00
Fire Systems Plan Check Fee - Sprinklers
$2,737.85
$2,737.85
07/03/24
$0.00
Fire Systems Plan Check Fee - Other
$324.08
$324.08
04/20/23
$0.00
Deferred Submittal Plan Check
$387.41
$387.41
07/12/22
$0.00
Deferred Submittal Plan Check
$1,657.17
$1,657.17
08/16/22
$0.00
Deferred Submittal Plan Check
$337.49
$337.49
04/20/23
$0.00
Deferred Submittal Plan Check
$350.29
$350.29
04/20/23
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
04/20/23
$0.00
Deferred Submittal Plan Check
$286.29
$286.29
04/20/23
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
04/20/23
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
04/20/23
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
04/20/23
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
05/11/23
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
07/03/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
07/03/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
07/03/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
07/03/24
$0.00
Deferred Submittal Plan Check
$286.29
$286.29
07/03/24
$0.00
Deferred Submittal Plan Check
$247.89
$247.89
07/03/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
07/03/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
07/03/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
07/03/24
$0.00
Deferred Submittal Plan Check
$311.89
$311.89
07/03/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
08/22/24
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
11/20/24
$0.00
Building Permit Fee per Bldg Div Value
$39,191.36
$39,191.36
04/06/22
$0.00
Fire System Permit Fee - Alarms
$940.88
$940.88
07/03/24
$0.00
Fire System Permit Fee - Sprinklers
$4,212.08
$4,212.08
07/03/24
$0.00
Fire System Permit Fee - Other
$498.58
$498.58
04/20/23
$0.00
Inspection Outside Normal Work Hours
$215.20
$215.20
09/03/24
$0.00
Zoning Plan Check
$17,636.11
$17,636.11
04/06/22
$0.00
Supplemental Plan Review, Zoning
$32.28
$32.28
07/03/24
$0.00
Supplemental Plan Review, Zoning
$21.52
$21.52
10/04/24
$0.00
State Surcharge, Structural
$5,040.97
$5,040.97
04/06/22
$0.00
State Surcharge, Structural
$59.83
$59.83
04/20/23
$0.00
State Surcharge, Structural
$618.36
$618.36
07/03/24
$0.00
State Surcharge, Structural
$25.82
$25.82
09/03/24
$0.00
State Surcharge, Structural
$43.80
$43.80
09/04/24
$0.00
State Surcharge, Structural
$43.80
$43.80
10/04/24
$0.00
State Surcharge, Structural
$43.80
$43.80
11/01/24
$0.00
Building Plan Check Admin
$4,127.41
$4,127.41
04/06/22
$0.00
Building Plan Check Admin
$0.00
$0.00
08/22/24
$0.00
Building Plan Check Admin
$0.00
$0.00
09/04/24
$0.00
Building Plan Check Admin
$0.00
$0.00
 
$0.00
Building Admin Fee, State
$2,734.72
$2,734.72
04/06/22
$0.00
Building Admin Fee, State
$0.00
$0.00
08/22/24
$0.00
Building Admin Fee, State
$0.00
$0.00
09/04/24
$0.00
Building Admin Fee, State
$0.00
$0.00
 
$0.00
Electrical
$216.35
$216.35
 
$0.00
Supplemental Plan Check, Electrical
$107.60
$107.60
04/20/23
$0.00
Minimum Permit Fee
$97.10
$97.10
04/20/23
$0.00
State Surcharge, Electrical
$11.65
$11.65
04/20/23
$0.00
Fire
$5,932.45
$5,932.45
 
$0.00
Fire Plan Check
$5,878.65
$5,878.65
04/06/22
$0.00
Supplemental Plan Review, Fire
$53.80
$53.80
11/01/24
$0.00
Fire Plan Check Admin
$0.00
$0.00
04/06/22
$0.00
Fire Plan Check Admin
$0.00
$0.00
 
$0.00
Mechanical
$53.80
$53.80
 
$0.00
Supplemental Plan Review, Mechanical
$53.80
$53.80
05/11/23
$0.00
Plumbing
$3,173.87
$3,173.87
 
$0.00
Plumbing Plan Check
$381.33
$381.33
04/06/22
$0.00
Supplemental Plan Review, Plumbing
$107.60
$107.60
07/12/22
$0.00
Supplemental Plan Review, Plumbing
$53.80
$53.80
04/20/23
$0.00
Supplemental Plan Review, Plumbing
$21.52
$21.52
08/22/24
$0.00
Plumbing Fixtures
$49.50
$49.50
04/06/22
$0.00
Plumbing Fixtures
$717.75
$717.75
07/12/22
$0.00
Plumbing Fixtures
$49.50
$49.50
04/20/23
$0.00
Sanitary Sewer Footage
$149.25
$149.25
04/06/22
$0.00
Storm Sewer Footage
$734.25
$734.25
04/06/22
$0.00
Storm Sewer Footage
$344.25
$344.25
07/12/22
$0.00
Water Service Footage
$119.75
$119.75
04/06/22
$0.00
Removal, Abandonment, Cap of Fixture
$36.75
$36.75
04/06/22
$0.00
State Surcharge, Plumbing
$142.86
$142.86
04/06/22
$0.00
State Surcharge, Plumbing
$127.44
$127.44
07/12/22
$0.00
State Surcharge, Plumbing
$5.94
$5.94
04/20/23
$0.00
Plumbing Plan Check Admin
$34.32
$34.32
04/06/22
$0.00
Plumbing Plan Check Admin
$0.00
$0.00
08/22/24
$0.00
Plumbing Admin Fee, State
$98.06
$98.06
04/06/22
$0.00
Plumbing Admin Fee, State
$0.00
$0.00
08/22/24
$0.00
Public Works
$6,251.11
$6,251.11
 
$0.00
PW Plan Check, New Commercial
$954.75
$954.75
04/06/22
$0.00
Stormwater Mgmt Facility
$289.75
$289.75
04/06/22
$0.00
Supplemental Plan Review, Public Works
$53.80
$53.80
08/22/24
$0.00
Supplemental Plan Review, Public Works
$21.52
$21.52
08/22/24
$0.00
Supplemental Plan Review, Public Works
$53.80
$53.80
09/03/24
$0.00
R-O-W Excavation (w/ pavement cuts)
$4,372.00
$4,372.00
04/06/22
$0.00
PW Plan Check Admin
$112.01
$112.01
04/06/22
$0.00
PW Plan Check Admin
$0.00
$0.00
08/22/24
$0.00
PW Plan Check Admin
$0.00
$0.00
09/04/24
$0.00
PW Admin, Local
$393.48
$393.48
04/06/22
$0.00
Total All Fees
$135,860.14
$135,860.14
 
$0.00
Page 1 of 1
Date: 6/1/2025