City of Eugene
Planning & Development
Building and Permit Services
Permit Number: 21-03736-01
Date: 7/16/2025
Address: 4841 W 18TH AVE
Project Description: Phase 1 - Site Utilities for The Reserve at Hunter's Ridge
Phase 2 - Building #19: Construct
Application Type:
Commercial
Status:
Issued
Scope of Work:
Phased Permit
Zoning:
Medium-Density Residental Zone
Map:
18-04-04-12
Tax Lot:
00100
Subdivision:
Addition:
Lot:
Block:
Date Received:
05/20/21
# Bedrooms:
0
Commitment Date:
07/13/21
# Dwelling Units:
0
Ready to issue as of:
12/09/22
In Flood Plain:
Project Coordinator:
Erik Swinney
Phone:
541-682-5372
  
Sign Standards:
 
BUILDING CHARACTERISTICS
Construction Types:
5B
Construction Type Comments:
 
OccupancyTypes:
A3
 
Occupancy Type Comments:
B
 
 
 
 
Occupancy Load:
0
Separated Building:
N/A
Fire Sprinklers:
No
 
Fire Alarms:
Yes
 
Building Area:
3456
Number of Stories:
1
Comment:
 
Floor Areas (sq ft):
Floor
Existing Floor Area
New Floor Area
Total Area
1st Floor
0
3456
3456
Existing floor area may not be shown.
CONTRACTOR DATA
Type
Contractor
Building
SHARPCOR INC
Electric
CRAWFORD ELECTRIC
Mechanical
JET INDUSTRIES INC
Plumbing
RODS PLUMBING LLC
Primary Contact
GRENZ BRIAN
TCO Contact
STEPHANIE DUTCHER
PLAN REVIEW SUMMARY
Plan review data displayed is the most current for each review. The applicant will receive notification of all issues needing additional information after all reviews on a project have been completed. Supplemental Information (SI) can be submitted prior to or after permit issuance. If you have any questions regarding your project, contact EFSwinney at 541-682-5372 or send email to erik.f.swinney@ci.eugene.or.us. Also note that some reviews (i.e., fire alarms, fire sprinklers) are deferred submittals and will be reviewed after original permit(s) have been issued.
Status Definitions
Pending
=
Review has not been started
Review
=
Under review
Waiting
=
Review for individual review has been completed, waiting for a response
External Wait
=
All reviews for project have been completed, waiting for a response
Approved
=
Review has been approved
Information
=
Information only, review not approved
Denied
=
Project cannot be approved as submitted
For information regarding the review of your project or the commitment date for completion of review, please contact your project coordinator, EFSwinney, at erik.f.swinney@ci.eugene.or.us or by phone at 541-682-5372.
Plan Review
Status
Review Completion Date
Project Coordination, Application Submittal
External Wait Time
07/13/21
Pre Issuance Coord, Pre Issuance SI
Approved
09/07/21
Post Issuance Coord, Post Issuance SI
Approved
02/06/24
Deferred Coordination, Deferred Submittal
Approved
12/27/22
Building, Application Submittal
Waiting for info
07/02/21
Building, Pre Issuance SI
Approved
08/10/21
Building, Post Issuance SI
Approved
10/16/23
Building, Deferred Submittal
Approved
12/27/22
Structural, Application Submittal
Waiting for info
06/25/21
Structural, Pre Issuance SI
Approved
08/03/21
Structural, Post Issuance SI
Approved
11/16/22
Structural, Deferred Submittal
Approved
06/27/22
Mechanical, Application Submittal
Information
07/02/21
Mechanical, Deferred Submittal
Approved
12/09/22
Electrical, Post Issuance SI
Approved
06/10/22
Electrical, Deferred Submittal
Approved
04/22/22
Plumbing, Application Submittal
Waiting for info
06/24/21
Plumbing, Pre Issuance SI
Approved
08/03/21
Plumbing, Post Issuance SI
Approved
10/16/23
Plumbing, Deferred Submittal
Approved
03/21/22
Zoning, Application Submittal
Waiting for info
07/13/21
Zoning, Pre Issuance SI
Approved
08/10/21
Zoning, Post Issuance SI
Approved
02/06/24
Public Works, Application Submittal
Waiting for info
07/13/21
Public Works, Pre Issuance SI
Approved
09/07/21
Public Works, Post Issuance SI
Approved
02/05/24
Stormwater Standards, Application Submittal
Waiting for info
07/13/21
Stormwater Standards, Pre Issuance SI
Approved
09/07/21
Stormwater Standards, Post Issuance SI
Information
11/17/22
SDC, Application Submittal
Waiting for info
07/13/21
SDC, Pre Issuance SI
Approved
09/07/21
SDC, Post Issuance SI
Information
11/17/22
Fire Marshal, Application Submittal
Waiting for info
06/07/21
Fire Marshal, Pre Issuance SI
Approved
08/09/21
A M & M, Post Issuance SI
Approved
06/14/22
Erosion Prevention, Application Submittal
Approved
09/08/21
Fire Alarm Plans, Deferred Submittal
Approved
11/23/22
PERMITS AND INSPECTIONS
Permit Type
Status
 
Issued Date
Expiration Date
Completion Date
 
Building
Finished
09/08/21
03/14/25
03/20/24
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
103 Footing
Approved
12/28/22
RZSteiner
 
 
105 Elec Rebar Ground
Reviewed
02/28/22
RZSteiner
Changed from Approved to Reviewed so customer can scheduled second Elec Rebar Ground inspection for pool area.
 
105 Elec Rebar Ground
Not Needed
09/05/23
RZSteiner
Redundant.
 
108 Foundation
Approved
03/07/22
JAJohannesen
clubhouse stem walls OK after SPI approves.
 
109 Foundation Drain/Waterproofing
Approved
12/28/22
RZSteiner
 
 
110 Structural Concrete
Approved
12/28/22
RZSteiner
 
 
114 Underfloor Framing
Approved
03/30/22
RZSteiner
 
 
116 Underfloor Insulation
Approved
12/28/22
RZSteiner
 
 
118 Framing
Approved
07/14/22
RZSteiner
 
 
117 Roof Sheathing
Approved
05/11/22
RZSteiner
 
 
119 Exterior Shearwall
Approved
12/28/22
RZSteiner
 
 
129 Interior Shearwall
Not Needed
12/28/22
RZSteiner
 
 
127 Masonry Construction
Approved
02/26/24
RZSteiner
 
 
120 Wall/Vault Insulation
Approved
07/06/22
RZSteiner
 
 
130 Lath or Dry Wall
Approved
07/06/22
RZSteiner
 
 
124 Final Insulation
Approved
12/28/22
RZSteiner
 
 
147 Alarm Systems
Approved
03/28/23
KAHaggas
Inspection/testing done 11/18/2022
 
153 Water/Hydrant System
Approved
03/15/24
ATBrushett
Hydrants have been flow tested and a flow of over 1500gpm was achieved
 
143 Fire Regulation
Approved
03/15/24
ATBrushett
 
 
150 Landscaping
Approved
03/15/24
VHVallentyne
 
 
919 Bicycle Parking
Approved
01/12/23
JDCogburn
 
 
157 Zoning
Approved
03/15/24
VHVallentyne
 
 
160 Emerg Egress Light
Approved
03/10/23
RZSteiner
 
 
162 SPI Concrete Construction
Approved
03/18/24
RZSteiner
 
 
172 SPI Masonry Construction
Approved
03/18/24
RZSteiner
 
 
176 SPI Soils
Approved
03/18/24
RZSteiner
 
 
951 SPI Final Letter
Approved
03/18/24
RZSteiner
 
 
199 Final Building
Approved
03/19/24
RZSteiner
 
Electrical
Finished
04/26/22
03/14/25
03/20/24
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
210 Undergrnd/Slab Elec
Approved
05/05/23
JAlexander
Electrical underground conduit for site lighting approved
 
215 Electrical - Feeder
Approved
06/30/22
SJLenker
[2] 200A subpanel feeders and feeder to pool panel okay.
 
217 Electrical Service
Approved
08/21/23
SRFitzHenry
 
 
213 Bonding/Grounding
Approved
02/06/24
SRFitzHenry
 
 
220 Rough Electrical
Approved
10/24/22
SJLenker
[2] bike storages okay to cover.
 
230 Limited Energy
Approved
06/30/22
SJLenker
 
 
299 Final Electrical
Approved
02/26/24
SRFitzHenry
 
Fire
Finished
09/08/21
03/14/25
03/20/24
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
849 Final Fire
Approved
11/18/22
KAHaggas
 
Mechanical
Finished
12/09/22
03/14/25
03/20/24
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
416 Rough Gas Piping
Approved
02/26/24
RZSteiner
 
 
450 Final Gas Piping
Approved
02/26/24
RZSteiner
 
 
420 Rough Mechanical
Approved
02/26/24
RZSteiner
 
 
499 Final Mechanical
Approved
03/18/24
RZSteiner
 
Plumbing
Finished
09/08/21
03/14/25
03/20/24
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
310 Sanitary Sewer
Approved
02/15/24
JRLaCasse
Public MH 4347 has 10-15 gpm at pipe seal from new penetration on NE side. Needs re-grouted but I'll address that on the ROW excavation.
 
315 Storm Sewer
Approved
02/13/24
JRLaCasse
 
 
350 Rain Drain/Foundation Drain
Approved
04/01/22
TSHodges
Club house perf system okay.
 
318 Under Floor Plumb
Approved
09/29/22
MDEdiger
ok to cover
 
320 Rough Plumbing
Approved
06/08/23
RC Kennedy
**Rough inspection incorrectly resulted as not needed/site work only by Mike Ediger, 11/16/22. Rough plumbing inspection is required for pool house/amenities building.** RCK
 
325 Water Service
Approved
11/18/22
MDEdiger
line pressure from main
 
330 Shower Liner
Approved
11/16/22
MDEdiger
out door shower for pool
 
335 Backflow Device
Approved
02/15/24
SEKelley
 
 
399 Final Plumbing
Approved
02/21/24
SEKelley
 
Public Works
Finished
09/08/21
03/14/25
03/20/24
 
 
Inspection
Result
 
Inspected
Inspector
Comment
 
 
725 Stormwater Mgmt Facility
Approved
07/12/23
TSHodges
Punch list items 1 through 4 complete per memo. Okay for landscape contractor to re-establish required planting, then schedule planting inspection.
 
735 Stormwater Facility Planting
Approved
02/14/24
NBSmith
They added new approved plants to the site.
 
750 R/W Excavation
Approved
03/18/24
JRLaCasse
 
 
765 Sidewalk
Approved
12/06/23
BUUnknown
Per Matt M
 
775 Drive/Curb Cut
Approved
12/06/23
BUUnknown
Per Matt M
 
799 Final Public Works
Approved
03/18/24
JRLaCasse
 
To request an inspection go to https://pdd.eugene-or.gov/BuildingPermits/InspectionLogin.
For more information call 541-682-5283.
FEES
Fees
Total Due
Amount Paid
Paid Date
Amount Due
Building
$12,481.59
$12,481.59
 
$0.00
Addressing Fee for New Buildings
$44.80
$44.80
09/08/21
$0.00
Temporary Certificate of Occupancy
$365.00
$365.00
12/30/22
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
02/08/23
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
02/27/23
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
03/27/23
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
04/27/23
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
05/31/23
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
06/30/23
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
08/01/23
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
09/01/23
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
10/03/23
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
10/31/23
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
12/01/23
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
01/02/24
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
01/29/24
$0.00
Renew Temp Certificate of Occupancy
$365.00
$365.00
02/28/24
$0.00
Building Plan Check per Applicant Value
$1,422.98
$1,422.98
05/25/21
$0.00
Supplemental Plan Review, Bldg
$161.40
$161.40
09/08/21
$0.00
Supplemental Plan Review, Bldg
$75.32
$75.32
02/14/22
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
04/25/22
$0.00
Supplemental Plan Review, Bldg
$21.52
$21.52
10/13/22
$0.00
Supplemental Plan Review, Bldg
$53.80
$53.80
12/14/22
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
09/08/21
$0.00
Supplemental Plan Check, Str. Eng.
$134.50
$134.50
06/15/22
$0.00
Supplemental Plan Check, Str. Eng.
$53.80
$53.80
11/17/22
$0.00
Fire/Life Safety Plan Check
$428.99
$428.99
09/08/21
$0.00
Phased Permit Base Fee
$335.00
$335.00
09/08/21
$0.00
Phased Permit Coordination Fee
$107.25
$107.25
09/08/21
$0.00
Fire Systems Plan Check Fee - Alarms
$240.88
$240.88
08/15/22
$0.00
Adjusted Building Plan Check
($725.87)
($725.87)
09/08/21
$0.00
Deferred Submittal Plan Check
$215.25
$215.25
06/28/22
$0.00
Building Permit Fee per Bldg Div Value
$1,072.48
$1,072.48
09/08/21
$0.00
Fire System Permit Fee - Alarms
$370.58
$370.58
08/15/22
$0.00
Inspection Outside Normal Work Hours
$215.20
$215.20
03/14/23
$0.00
Zoning Plan Check
$482.62
$482.62
09/08/21
$0.00
Supplemental Plan Review, Zoning
$32.28
$32.28
09/08/21
$0.00
Supplemental Plan Review, Zoning
$21.52
$21.52
12/14/22
$0.00
Supplemental Plan Review, Zoning
$21.52
$21.52
02/07/24
$0.00
Zoning Inspection
$107.60
$107.60
04/25/22
$0.00
State Surcharge, Structural
$140.63
$140.63
09/08/21
$0.00
State Surcharge, Structural
$48.59
$48.59
08/15/22
$0.00
State Surcharge, Structural
$47.86
$47.86
12/30/22
$0.00
State Surcharge, Structural
$47.86
$47.86
02/08/23
$0.00
State Surcharge, Structural
$47.86
$47.86
02/27/23
$0.00
State Surcharge, Structural
$28.22
$28.22
03/14/23
$0.00
State Surcharge, Structural
$47.86
$47.86
03/27/23
$0.00
State Surcharge, Structural
$47.86
$47.86
04/27/23
$0.00
State Surcharge, Structural
$47.86
$47.86
05/31/23
$0.00
State Surcharge, Structural
$47.86
$47.86
06/30/23
$0.00
State Surcharge, Structural
$47.86
$47.86
08/01/23
$0.00
State Surcharge, Structural
$47.86
$47.86
09/01/23
$0.00
State Surcharge, Structural
$47.86
$47.86
10/03/23
$0.00
State Surcharge, Structural
$47.86
$47.86
10/31/23
$0.00
State Surcharge, Structural
$47.86
$47.86
12/01/23
$0.00
State Surcharge, Structural
$47.86
$47.86
01/02/24
$0.00
State Surcharge, Structural
$47.86
$47.86
01/29/24
$0.00
State Surcharge, Structural
$47.86
$47.86
02/28/24
$0.00
Building Admin Fee, Local
$4.03
$4.03
09/08/21
$0.00
Building Plan Check Admin
$128.07
$128.07
05/25/21
$0.00
Building Plan Check Admin
$137.08
$137.08
06/14/21
$0.00
Building Plan Check Admin
$78.79
$78.79
08/24/21
$0.00
Building Plan Check Admin
$6.78
$6.78
02/14/22
$0.00
Building Plan Check Admin
$4.84
$4.84
04/25/22
$0.00
Building Plan Check Admin
$12.10
$12.10
06/15/22
$0.00
Building Plan Check Admin
$19.37
$19.37
06/28/22
$0.00
Building Plan Check Admin
$21.68
$21.68
08/15/22
$0.00
Building Plan Check Admin
$1.94
$1.94
10/13/22
$0.00
Building Plan Check Admin
$4.84
$4.84
11/17/22
$0.00
Building Plan Check Admin
$6.78
$6.78
12/14/22
$0.00
Building Plan Check Admin
$1.94
$1.94
02/07/24
$0.00
Building Plan Check Admin
$0.00
$0.00
 
$0.00
Building Admin Fee, State
$96.52
$96.52
09/08/21
$0.00
Building Admin Fee, State
$33.35
$33.35
08/15/22
$0.00
Building Admin Fee, State
$32.85
$32.85
12/30/22
$0.00
Building Admin Fee, State
$32.85
$32.85
02/08/23
$0.00
Building Admin Fee, State
$32.85
$32.85
02/27/23
$0.00
Building Admin Fee, State
$19.37
$19.37
03/14/23
$0.00
Building Admin Fee, State
$32.85
$32.85
03/27/23
$0.00
Building Admin Fee, State
$32.85
$32.85
04/27/23
$0.00
Building Admin Fee, State
$32.85
$32.85
05/31/23
$0.00
Building Admin Fee, State
$32.85
$32.85
06/30/23
$0.00
Building Admin Fee, State
$32.85
$32.85
08/01/23
$0.00
Building Admin Fee, State
$32.85
$32.85
09/01/23
$0.00
Building Admin Fee, State
$32.85
$32.85
10/03/23
$0.00
Building Admin Fee, State
$32.85
$32.85
10/31/23
$0.00
Building Admin Fee, State
$32.85
$32.85
12/01/23
$0.00
Building Admin Fee, State
$32.85
$32.85
01/02/24
$0.00
Building Admin Fee, State
$32.85
$32.85
01/29/24
$0.00
Building Admin Fee, State
$32.85
$32.85
02/28/24
$0.00
Electrical
$1,766.23
$1,766.23
 
$0.00
Electric Plan Check
$322.52
$322.52
03/25/22
$0.00
200 amps or less
$260.00
$260.00
03/25/22
$0.00
201 to 400 amps
$166.50
$166.50
03/25/22
$0.00
401 to 600 amps
$237.00
$237.00
04/25/22
$0.00
Branch Circuits w/ Feeder or Service
$409.50
$409.50
03/25/22
$0.00
Restricted Energy
$85.50
$85.50
03/25/22
$0.00
State Surcharge, Electrical
$120.83
$120.83
03/25/22
$0.00
State Surcharge, Electrical
$31.08
$31.08
04/25/22
$0.00
Electric Plan Check Admin
$29.03
$29.03
03/25/22
$0.00
Electric Plan Check Admin
$0.00
$0.00
 
$0.00
Electric Admin Fee, State
$82.94
$82.94
03/25/22
$0.00
Electric Admin Fee, State
$21.33
$21.33
04/25/22
$0.00
Fire
$458.78
$458.78
 
$0.00
Fire Plan Check
$420.90
$420.90
09/08/21
$0.00
Fire Plan Check Admin
$37.88
$37.88
09/08/21
$0.00
Mechanical
$1,374.44
$1,374.44
 
$0.00
Mechanical Plan Check
$462.98
$462.98
08/15/22
$0.00
Mechanical Permit (Applicant Value)
$712.28
$712.28
08/15/22
$0.00
State Surcharge, Mechanical
$93.40
$93.40
08/15/22
$0.00
Mechanical Plan Check Admin
$41.67
$41.67
08/15/22
$0.00
Mechanical Admin Fee, State
$64.11
$64.11
08/15/22
$0.00
Plumbing
$22,493.90
$22,493.90
 
$0.00
Plumbing Plan Check
$4,723.34
$4,723.34
09/08/21
$0.00
Plumbing Fixtures
$767.25
$767.25
09/08/21
$0.00
Plumbing Fixtures
$321.75
$321.75
03/25/22
$0.00
Plumbing Fixtures
$173.25
$173.25
10/18/23
$0.00
Sanitary Sewer Footage
$2,684.25
$2,684.25
09/08/21
$0.00
Storm Sewer Footage
$7,234.25
$7,234.25
09/08/21
$0.00
Storm Sewer Footage
$214.25
$214.25
10/18/23
$0.00
Water Service Footage
$2,784.75
$2,784.75
09/08/21
$0.00
Backflow Prevention
$24.75
$24.75
09/08/21
$0.00
State Surcharge, Plumbing
$1,769.55
$1,769.55
09/08/21
$0.00
State Surcharge, Plumbing
$42.19
$42.19
03/25/22
$0.00
State Surcharge, Plumbing
$50.81
$50.81
10/18/23
$0.00
Plumbing Plan Check Admin
$425.10
$425.10
09/08/21
$0.00
Plumbing Plan Check Admin
$0.00
$0.00
 
$0.00
Plumbing Admin Fee, State
$1,214.57
$1,214.57
09/08/21
$0.00
Plumbing Admin Fee, State
$28.96
$28.96
03/25/22
$0.00
Plumbing Admin Fee, State
$34.88
$34.88
10/18/23
$0.00
Public Works
$3,455.78
$3,455.78
 
$0.00
PW Plan Check, New Commercial
$954.75
$954.75
09/08/21
$0.00
Stormwater Mgmt Facility
$289.75
$289.75
09/08/21
$0.00
Supplemental Plan Review, Public Works
$753.20
$753.20
09/08/21
$0.00
Supplemental Plan Review, Public Works
$161.40
$161.40
10/13/22
$0.00
Supplemental Plan Review, Public Works
$53.80
$53.80
10/23/23
$0.00
Supplemental Plan Review, Public Works
$53.80
$53.80
02/06/24
$0.00
Sidewalk Repair
$174.75
$174.75
09/08/21
$0.00
R-O-W Excavation (w/ pavement cuts)
$546.50
$546.50
10/13/22
$0.00
R-O-W Excavation (w/o pavement cuts)
$182.50
$182.50
09/08/21
$0.00
PW Plan Check Admin
$179.79
$179.79
09/08/21
$0.00
PW Plan Check Admin
$14.53
$14.53
10/13/22
$0.00
PW Plan Check Admin
$4.84
$4.84
10/23/23
$0.00
PW Plan Check Admin
$4.84
$4.84
02/06/24
$0.00
PW Admin, Local
$32.15
$32.15
09/08/21
$0.00
PW Admin, Local
$49.18
$49.18
10/13/22
$0.00
Total All Fees
$42,030.72
$42,030.72
 
$0.00
Page 1 of 1
Date: 7/16/2025